RECOMMENDATION:
THAT the report entitled “3-Stream Phase 2 Implementation Update ” be received;
AND THAT Phase 2 of Markham’s 3-Stream
collection system be implemented Town wide on
AND
THAT the cost to transfer and process organics (SSO) for the months of July and
August 2005 be shared equally between Markham and the Region of York to an
upset limit of $77,300;
AND THAT the cost be
funded from additional
revenue to be received from the WDO in excess of the budgeted amount in Waste
Management Provincial Grants and Subsidy Operating Account #770-772-8350;
AND FURTHER THAT the Region
be requested to approve
PURPOSE:
The purpose of this report is to obtain
approval to advance the implementation of Phase 2 from
BACKGROUND:
On
On
At the
1. Need to secure curbside containers
2. Need to obtain “back-up” SSO processing facility
3.
Need to assess the benefits of
advancing Phase 2 implementation to
1. Secure
Curbside Containers
The availability of the curbside containers for either a summer or fall launch date has been confirmed and a purchase order issued for the manufacture and delivery of approximately 55,000 container sets.
2. SSO
Processing Contingency
Comporec, a Quebec SSO processing facility is capable of processing SSO material contained in plastic bags. Regional staff have met with Comporec, and are preparing a report for Regional Council seeking approval to finalize a contingency plan to be put in effect should operations at Halton Recycling be interrupted.
3.
Benefits Of
Accelerating Phase 2 Launch Date to July 2005
Staff originally planned to implement
Phase 2 in September 2005 to ensure the availability of Regional processing
facilities. In 2004, Regional staff confirmed the availability of SSO
processing capacity, but could not commit to a completion date for the Region’s
new co-mingled recycling facility in
In December 2004, Regional Council
notified the local municipalities that the construction of the Region’s new
recycling facility was ahead of schedule and will open on
With both SSO and co-mingled
recycling processing facilities now available in July 2005, staff notified the
Region that
There are many benefits to
launching the new 3-stream program on
·
Achieve our 70% diversion target ahead of schedule
and lessen
·
Implementing the new collection
system all at once will be less confusing for residents and optimizes
internal and external resources;
·
A July launch allows use of summer students for
pre- and post- launch activities. A September launch will require the hiring of
temporary support;
·
Moving the launch to July, reduces potential
logistical conflict with
·
Secures SSO
processing capacity at HRL facility, avoiding any potential facility capacity
issues
·
Collection
changes will be less confusing for residents if there is distance between the
implementation of SSO collection in plastic bags and the banning of plastic
bags for leaf and yard waste
·
From an operations perspective, as blue box
recyclables and green bin organics will be collected in one truck Miller Waste prefers the new system be launched at the same time
Regional
Response
In January 2005, a response was received
from the Region to
1. Concern over odour issues at the Newmarket SSO processing facility.
2.
The Region’s 2005 budget
reflects a September date for processing
3.
The Region’s
additional 2 month processing cost for
TABLE #1
ADDITIONAL COST TO PROCESS SSO
JULY AND AUGUST
Phase 2 SSO/per month |
Phase 2 SSO July & Aug |
Cost differential between landfill and Halton Facility |
Total cost July & August |
Cost shared 50/50 |
1,250 t |
2,500 t |
$61.84 per tonne |
$154,600 |
$77,300 |
Advancing the SSO launch to July will not result in additional collection costs to the Town.
Cost sharing model used to implement
Phase 1
As previously outlined, implementing 3-stream collection in July as one program has many benefits for the Town, but will result in increased processing costs for the Region.
A similar situation occurred during Phase
1 implementation over the additional cost of processing the co-mingled
recyclables. In order to facilitate the launch of
Staff is recommending a similar cost-sharing model be considered for
advancing the Phase 2 launch to
Options
If the Region does not agree to the
cost-sharing model, outlined in Table #1,
The Phase 2 budget anticipated one
promotion and education campaign. Implementing Phase 2 as two campaigns will
result in additional promotion and education costs for
FINANCIAL CONSIDERATIONS:
The 2005 Waste Management Operating Budget
includes $450K in revenues from the WDO. The Region has notified
If the Region does not support
Launching expanded recycling and SSO programs
simultaneously will result only in additional the processing and transfer costs
of $77,300 as outlined in Table 1 of this report. No additional collection costs will be
incurred.
The
additional processing cost of $77,300 is available from 2005 WDO funding in Account #770-772 8350 -
Waste Management Provincial Grants and Subsidy Operating – of the 2005 Waste
Management Operating Budget.
BUSINESS UNITS CONSULTED AND AFFECTED:
The
Finance Department has reviewed this report.
|
|
|
Peter Loukes, P.Eng. Director of Operations & Asset Management |
|
Jim Sales, Commissioner of Community and Fire
Services |
Q:\Commission Share\Operations and Asset
Management\Reports\2005\C & U\Waste\Phase 2 Implementation-March
21,2005.doc