APPENDIX
E
WARD
BUILDING RECONCILIATION
Master Plan Ward Report Difference
Size (Sq. Ft.) 13,000 14,000 1,000
Construction 1,060,000 1,650,000 590,000
Cost per Sq. Ft. 81.54 117.86 36.32
Soft Costs 477,000 535,000 58,000
Visible storage 100,000 598,000 498,000
Total
Cost 1,637,000 2,783,000 1,146,000