Report to General
Committee – Finance and Administration |
|
|
|
|
|
|
|
|
TO: |
Mayor and Members of Council |
|
|
|
|
FROM: |
Peter Loukes, Director of
Operations and Asset Management |
|
|
|
|
PREPARED BY: |
Alan Laver, Manager of Contracts
and Utilities Kevin Newson, |
|
|
|
|
DATE OF MEETING: |
|
|
|
|
|
SUBJECT: |
065-S-05 Contract Award for
Streetlight Maintenance 2005, Power Stream |
|
|
|
THAT the tendering process be waived in
accordance with
AND THAT the 2005
Streetlight Maintenance and Repairs contract be awarded to the single sourced
vendor Power Stream in the 2005 amount of $659,554 exclusive of GST to expire
on
AND THAT funds will be provided from account # 720 720 5497
Light Maintenance Repair in the amount of $418,058 with the shortfall,
estimated to be $241,496, to be included in the analysis of the year-end
forecast to be presented to Council in September 2005;
AND THAT
Operations and Asset Management, in consultation with
AND THAT
Operations and Asset Management and the
AND THAT
Operations and Asset Management arrange for any pilot metering projects that
may be requested by Power Stream to substantiate typical streetlighting energy
use.
BACKGROUND:
Power Stream has historically been the provider of streetlight
maintenance services for the Town. Currently there is an inventory of over
18,400 streetlights within the Town’s boundaries. The Town’s streetlight
electrical supply circuits are now integrated into the existing hydro system
and require certified personnel (Journeyman Linemen) to maintain any live
portion of the system.
The services provided now by Power Stream include repairs to damaged
poles and fixtures, replacement of burned out bulbs (based on residents’
requests and outages reported by the Operations Department’s regular
patrolling) underground/overhead supply line repairs, and locating services for
underground infrastructure. The service
also includes costs for the yearly re-lamping and cleaning program (all lamps
are replaced on a 5 year rotation, as part of a preventative maintenance
program), 2602 units are scheduled to be replaced in 2005.
Damage repairs and routine maintenance items such as bulb
replacements/relamping are based on estimates provided by Power Stream and
payments are made to Power Stream based on the actual certified cost for
materials and labour.
Power Stream, in estimating their 2005 costs, has qualified that costs
must now reflect a “fair market value” in order to comply with the “Affiliate
Relationship Code”. This is due to the
revised status/ownership of the organization.
The costs now will include additional administrative and managerial
costs that have not been charged in the past.
Therefore, costs related to maintenance will increase in 2005 over
2004. Power Stream has previously been
directed to maintain their service in 2005 and discussions/review of other
alternatives (private contractor, additional Town staff, etc., or combination
of such) will be reviewed by Operations and Asset Management in consultation
with the
Streetlight energy costs are at present being billed at rates approved
by the Ontario Energy Board that do not take into consideration the off peak
use of power associated with streetlighting. As the province and local hydros
are promoting the use of off peak power, which is available to Power Stream in
larger quantities at reduced rates, streetlighting would appear to naturally
fall into this category. Operations and
Asset Management and the
FINANCIAL CONSIDERATIONS:
Based on actual service calls in the past two years, the Town projects
1,383 general maintenance, 62 line burn-outs, and 2,602 re-lamping service
calls for 2005. Details on the history and
projections are presented in the chart below:
Although
it is difficult to project the number and severity of streetlight failures
necessitating service calls, the average for the past two years was used as the
volume or number of expected occurrences basis for the award of this contract.
Power
Stream also tracks and projects the Town’s streetlight maintenance requirements
(e.g. number of occurrences and total anticipated cost) on an annual
basis. The cost of individual service
calls may differ due to the complexity of the repairs/work required. Based on Power Stream’s projections, Town
staff determined the average price per occurrence to be $286.92, $2,849.51, and
$33.08 for general maintenance, line burn-outs and re-lamping,
respectively. When compared to 2004
average unit prices, the 2005 average rates have increased 82%, 10% and 5% for
general maintenance, burn-outs and re-lamping, respectively. The increase is effective
Based
upon the unit prices shown above and the average occurrences for the past two
years, the purchase order for street light maintenance will be awarded to Power
Stream in the amount of $659,567 for 2005 calculated as follows:
The 2005 Operating Budget for Street Light Maintenance
is $418,058 in account 720-720-5497. The
anticipated shortfall of $241,496 ($418,058 - $659,554) will be included in the
analysis of the 2005 year-end forecast.
The analysis will determine if the $241,496 can be offset by projected surpluses
in other operating accounts. The
year-end forecast will be presented to Council in September, 2005.
The 2006 budget will be adjusted accordingly based on
projected occurrences for 2006 and anticipated cost increases. The Operations and Asset Management
Department with Finance will review alternatives for the 2006 streetlight
maintenance project.
In addition the
review of off peak power usage with Power Stream if acknowledged and billed at
a reduced rate could provide substantial savings to the Town.
|
|
|
Peter Loukes, P. Eng., Director of Operations and Asset Management |
|
Commissioner of Community Services and Fire |