TO: |
Mayor and Members of Council |
|
|
|
|
FROM: |
Alan Brown,
Director of Engineering |
|
|
|
|
PREPARED BY: |
Renée Chong, Project Engineer Allan Arbuckle, Manager of
Infrastructure & Capital Works |
|
|
|
|
DATE OF MEETING: |
|
|
|
|
|
SUBJECT: |
Tender Award #153-T-05 |
|
|
|
RECOMMENDATION:
THAT the report entitled “Tender Award # 153-T-
AND THAT the contract for tender
AND THAT
a contingency amount of $74,100.00 exclusive of GST be established to cover any
additional costs and that the Director of
AND
THAT staff be authorized to select a qualified consulting engineering firm in
accordance with the Town’s purchasing bylaw to provide geotechnical, materials
and hydrogeological testing services during construction in the upset limit
amount of $20,000.00 exclusive of GST;
AND
THAT the consulting services contract with Mac Viro Consultants Inc. for this
project be increased by a total of $59,510.00 exclusive of GST to cover the
cost of services not included in the consultant’s original terms of reference
including the preparation of a Permit to Take Water, Re-tendering of the project
and supervision of a two stage construction project;
AND THAT the John Street Sanitary Sewer, CNR to
North Collector Sewer project budget in the total amount of $1,003,378.00
outlined on page 3 be approved;
AND
THAT funding be provided from the following sources:
AND
THAT upon payment of all invoices and engineering fees, any remaining funds
will be returned to the original funding source, the developer, Townhomes of
Thornhill Village Inc.
PURPOSE:
The purpose of this report is to award the contract for the
construction of the John Street Sanitary Sewer, CNR to North
Don River Collector Sewer which includes a municipal water connection to
provide sanitary services and potable water for the new Townhomes of Thornhill
Village development at the northeast corner of
BACKGROUND:
In order to accommodate the future townhouse development of 356 lots proposed
by The Townhomes of Thornhill Village Inc. it was determined through sanitary
flow monitoring that a new sanitary sewer would be required to accommodate the
additional flows.
This project was originally tendered on
PROJECT APPROVALS
All required approvals for the project have been secured including
Toronto and Region Conservation Authority (Fill, Construction alteration to
Waterway Permit), the Region of York (Permit to connect to the North Don
Collector Sewer) and Ministry of Energy
and the Environment (Permit To Take Water).
DISCUSSION
The tender was issued in accordance with the
Advertised,
place and date |
Electronic
Tendering Network ( |
Bids
closed on |
|
Number
of contractors picking up bid documents |
10 |
Number
of contractors responding to bid |
5 |
Detailed pricing information as submitted is as follows;
|
Contractors |
Prices Exclusive of GST |
1 |
CO-X-CO
Construction Ltd. |
$740,823.00 |
2 |
North Rock Group |
$825,575.21 |
3 |
Advice Contracting Ltd. |
$830,529.88 |
4 |
Comer Group Ltd. |
$1,016,650.00 |
5 |
Drainstar Contracting Ltd. |
$1,052,000.00 |
PROJECT SCHEDULE
Subject to
Council’s award of this tender, construction of the east portion of this
project (
FINANCIAL CONSIDERATIONS
Upon
closing the tender and reviewing the total costs of this project it was
determined that there was a shortfall of $311,228.00 to complete this project.
The Town served written notice to the developer in accordance with the Site
Plan Agreement and received the $311,228.00 to bring the total funding
available on this project to $1,003,378.00.
The
total cost of constructing this project is as follows:
It is recommended that the contract for tender
In accordance
with the Town’s purchasing bylaw staff will select a qualified consulting
engineering firm to provide geotechnical, materials and hydrogeological testing
services during construction in the upset limit amount of $20,000.00 exclusive
of GST. The consulting services budget for the project requires an increase of
$59,510.00 (41,510.00 + 18,000.00) exclusive of GST to cover the cost of
services not included in the consultant’s original terms of reference including
the preparation of a Permit to Take Water, Re-tendering of the project and
supervision of a two stage construction project.
The John Street Sanitary Sewer, CNR to North
Collector Sewer project, in the total amount of $1,003,378.00 is fully funded from
The Townhomes of Thornhill Village Inc. through their Site Plan Control
Agreement.
Financing
will be accessible through
ATTACHMENTS
Attachment “A” – Site Location
Attachment “B” – Consultant’s tender
recommendation letter
|
|
|
Alan Brown, C.E.T. Director of Engineering |
|
Jim Baird, M.C.I.P., R.P.P. Commissioner of Development Services |