Report to: General Committee                                     Date Report Authored: May 4, 2010

 

 

SUBJECT:                         2010 Interim Quality Management System Management Review Outcomes

PREPARED BY:              Eddy Wu, P.Eng., Ext. 2737

                                            Waterworks Quality Management System Controller

 

 

 

RECOMMENDATION:

1)                  That the report titled “2010 Interim Quality Management System Management Review Outcomes” be received; and,

 

2)                  That Council, as the Owner of the Town’s drinking water system, acknowledge and support the outcomes and action items identified from the 2010 Interim Management Review; and further,

 

3)                  That Staff be authorized and directed to do all things necessary to give effect to this resolution

 

 

EXECUTIVE SUMMARY:

Not applicable

 

1. Purpose  2. Background  3. Discussion  4. Financial 

 

5. Others (HR, Strategic, Affected Units)  6. Attachment(s)

 

PURPOSE:

The purpose of this report is to:

1.      Update the Owner on the status of the 2009 Management Review action items

2.      Communicate outcomes from the 2010 Interim Management Review to the Owner

 

 

BACKGROUND:

Element 20 of the Drinking Water Quality Management Standard (DWQMS) requires a Management Review to be conducted at least once every twelve (12) months. It is required by DWQMS that the outcomes from each Management Review are reported to the Owner. The report brought forward to the Owner’s attention is summarizing the outcomes from the Management Review, together with action items identified within the meeting. The update of each previously identified action item is also reported to the Owner so that the Owner is fully aware of the status of each action item.

 

The Owner has the overall responsibility and authority to ensure that the Town meets all legislation and regulatory requirements. The Owner also has the responsibility and authority to provide infrastructure and Quality Management System (QMS) resources as required and agreed upon with the designated Top Management. Therefore, it is very important for the Owner to be aware of the Management Review outcomes.

 

This is the third Management Review the Town had since the implementation of QMS. The first one was held in November 2008, with the second one held in September 2009. All Management Reviews were held with an identical agenda and the same attendees invited to the meetings which consisted of the Corporate Top Management (Chief Administrative Officer, Commissioner of Community and Fire Services, Director of Operations and Waterworks General Manager) and the Operational Top Management (the Waterworks Management Team).

 

 

OPTIONS/ DISCUSSION:

In 2008 and 2009, one Management Review meeting was conducted each year in order to meet the requirement of DWQMS. In order to avoid falling behind with holding only one (1) Management Review per year, in 2010 two (2) Management Reviews are scheduled. The interim Management Review took place on April 22, 2010 and another Management Review will be scheduled in the later part of 2010. As long as all the required agenda items are covered within the same year we are still in compliance with DWQMS.

 

Agenda items not covered in this interim Management Review include:

·      Trending of Drinking Water Quality Parameters – as the comparison with previous data would not be a fair comparison, since previous comparison was on an annual basis. By the end of October, Waterworks will have the same full year window of data for more accurate comparison

·      Results of Infrastructure Review – as all the infrastructure rehabilitation and renewal projects are just starting for 2010, and the results of the infrastructure review are not available yet

·      Review of Risk Management and Emergency Response – as the annual review of the Town’s Risk Assessment and the annual mock emergency response exercise are both scheduled to take place in May, and there are no results from these activities to be reviewed yet

·      Review the status of the Operational Plan – as the annual review of the Operational Plan and the System Level Documents are due in July, and therefore there is no update available in this meeting yet

The second Management Review is tentative to be held at the end of October, and by then, updates of these deferred items will be available for review.

 

Below are the key highlights from this interim Management Review:

 

1.    Action Items review

 

The status of all nineteen (19) action items identified from the 2009 Management Review were reviewed and updated in the meeting. In summary, nine (9) of the action items have been completed and closed off, six (6) are not due for completion yet, and four (4) are revised to have later completion dates. Detail of each action item is shown in Attachment “A”.

 

From this interim Management Review, seven (7) new action items are identified with two (2) action items already completed as of the end of April. Detail of each new action item identified is shown in Attachment “B”.

 

2.    Consumer Feedback

 

In addition to the existing card survey mechanism, Waterworks is introducing the telephone survey mechanism in order to collect feedback from those consumers that do not submit their comments via the card method. This is a more proactive approach and hopefully more feedback can be collected with this new method that runs in parallel to the card survey method. Waterworks will be piloting this new process in the coming months, and the goal is to work with Contact Center in the future in order to collect consumer feedback. This is one of the new action items identified in Attachment “B”.

 

3.    Resource Needs

 

For the presentation of Resources Need, Waterworks has taken a different approach this time. In areas where resources are needed, the risks are identified with the mitigation measures developed. Next the resources plans are identified and to be presented to the Corporate Top Management through the upcoming budget approval process. This approach will provide the Corporate Top Management a more in-depth and better understanding of Waterworks resources need in a more business like approach. This discussion is required and will meet the requirement of DWQMS element 20.

 

Waterworks has presented the following five (5) areas for resources need, and a three (3) years plan is to be developed in order to mitigate the risks identified. These areas are:

a)      Revenue Recovery & Water Loss Reduction

·         Meter accuracy

·         Meter Reading and Data Analysis

·         Leakage Management and Water Audit

b)      Infrastructure Rehabilitation/Replacement (R/R)

·         Lifecycle

c)      Data Management and Analysis – Process Improvement

·         Regulatory data

·         Operational and Maintenance data

·         Financial data

·         Customer service data

d)     Effluent Control & Compliance

·         Proactive effluent control and compliance

·         Damage cost recovery

e)      Operational Service Levels

·         Adequacy

 

4.    Aligning QMS with NQI

 

The implementation of QMS fully supports the development of the Town’s NQI initiatives, as both programs drive towards continual improvement. However, the terminologies used in QMS and NQI are different in many areas but the concepts behind them are identical. Waterworks will prepare a communication document to educate and aid staff to understand and be comfortable with both programs’ concepts and terminologies. The communication document shows direct alignment of QMS to the Town’s NQI journey. The results of this can assist other Town’s departments to align their internal quality management program with the Town’s NQI program.

 

The interim Management Review information package and meeting minutes are maintained by the Waterworks QMS Controller as part of the records as required by DWQMS. These records are available upon request if needed but are not submitted as part of this report.

 

 

FINANCIAL CONSIDERATIONS AND TEMPLATE: (external link)

Not applicable

 

 

HUMAN RESOURCES CONSIDERATIONS

Business Case for each new staffing request will be prepared as part of the 2011 Capital Budget request. These business cases are to be forwarded to the CAO and Commissioners Committee (CCC) for approval in the coming months.

 

 

ALIGNMENT WITH STRATEGIC PRIORITIES:

Municipal Services – The accredited QMS is a requirement for the Town to retain the Municipal Drinking Water License. Without the accreditation, the Town cannot become the Operating Authority in order to continue operating the Town’s drinking water system. Performing the Management Review and communicating the outcomes from the Management Review to the Owner is required in order for the Town to remain in compliance to DWQMS. This is crucial in order for the Town to be able to continue providing the same high level of drinking water to the Town’s consumers.

 

 

 

BUSINESS UNITS CONSULTED AND AFFECTED:

Not applicable

 

 

 

 

 

 

 

 

 

The undersigned represent the Corporate Top Management of Town of Markham’s Drinking Water Distribution System. By signing below the Corporate Top Management of the Operating Authority has reviewed the outcomes and action items identified from the 2010 Interim Management Review, and hereby recommend these outcomes and action items to be brought forward to the Owner’s attention.

 

 

RECOMMENDED

                           BY:    ________________________         

                                      Jerry Klaus

                                      General Manager, Waterworks

 

 

                                      ________________________

                                      Peter Loukes, P.Eng.

                                      Director, Operations

 

 

                                      ________________________

                                      Brenda Librecz

                                      Commissioner, Community and Fire Services

 

 

                                      ________________________

                                      John Livey

                                      Chief Administrative Officer

 

ATTACHMENTS:

Attachment “A” – 2009 Management Review Action Items Summary

Attachment “B” – 2010 Interim Management Review Action Items Summary

 

 

 

 

Q:\Commission Share\Operations and Asset Management\Reports\2010\Waterworks\2010 Interim QMS Management Review Outcomes.doc