DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Valerie Shuttleworth, Director of Planning and Urban Design

Jim Baird, Commissioner of Development Services

 

 

 

 

PREPARED BY:

Teema Kanji, ext. 4480

South District

 

 

 

 

DATE OF MEETING:

2003-March-04

 

 

 

 

SUBJECT:

PRELIMINARY REPORT

 

 

St. Mark’s Coptic Orthodox Church.  Zoning and Official Plan Amendments to permit residential uses and certain institutional components of a proposed religious campus north of Steeles Avenue between Acadia Avenue and Ferrier Street (3660 Steeles Avenue).

FILES: OP.03-105828 and ZA.03-105829


 

RECOMMENDATION:

That a Public Meeting be held to consider Official Plan Amendment (OP.03-105828) and Zoning By-law Amendment (ZA.03-105829) applications, submitted by the St. Mark’s Coptic Orthodox Church, to permit residential uses and certain institutional components for a proposed religious campus north of Steeles Avenue between Acadia Avenue and Ferrier Street (3660 Steeles Avenue);

 

And that staff schedule a Public Meeting when the issues outlined in the March 4, 2003 preliminary report have been sufficiently addressed by the applicant.

 

PURPOSE:

The purpose of this report is to provide preliminary information regarding applications for official plan and zoning by-law amendments to permit residential uses and certain institutional components for a proposed religious campus, and to recommend that a public meeting be scheduled to obtain public input on these applications, when identified issues have been addressed by the applicant.

 

BACKGROUND:

The subject property occupies the entire block bounded by Steeles Avenue, Acadia Avenue and Ferrier Street and has a lot area of 4.86 ha (12 acres), and is municipally known as 3660 Steeles Avenue (Figure 1).  The property is currently vacant and is devoid of any significant vegetation.

 

The property is bounded to the south across Steeles Avenue by single detached dwellings, which back onto Steeles Avenue.  To the east, by a Sunoco gar bar and car wash and vacant lands approved for a commercial development.  The Tender Holdings site plan application was approved in principal by the Ontario Municipal Board on January 20, 2003.  To the west across Ferrier Street are two existing commercial developments (Metro Square and New Century Plaza).  To the north across Acadia Avenue are two 3-storey office buildings and a place of worship (Figure 3).

 

Previous zoning application and site plan applications

In 1997, applications were submitted by Whitehorn Investments Limited (First Professional Management) to permit the construction of a 10,870 m² (117,000 ft²) commercial development to accommodate a combination of retail, service, restaurant and office uses.  The proposal consisted of five separate buildings arranged around the perimeter of the property.  The buildings were proposed to be 1-storey in height, with the exception of the building at the corner of Steeles Avenue and Ferrier Street, which was proposed to be 3-storeys in height.  Site plan approval was granted, but a site plan agreement was never executed, and this particular project was subsequently abandoned.

 

Religious campus proposed

The applicant has submitted applications for official plan and zoning by-law amendments to permit residential uses and certain institutional components for a proposed religious campus.  It is St. Mark’s desire to construct a Campus Village that will express the Christian Coptic Orthodox tradition, as well as achieve a landmark in urban design and built form (Figure 5) in Markham.  The applicant has not applied for site plan approval at this time, but has provided staff with a conceptual site plan and building elevations (Figure 4 and 5).

 

The concept site plan shows a variety of religious and ancillary uses integrated as one comprehensive development, and includes the following uses:

 

 

The applicant is proposing to develop a master site plan for the entire site at up to 300% floor area ratio, with a total gross floor area of approximately 92,900 m² (1 million ft²) to 139,350 m² (1.5 million ft²). The residential component (seniors residence and retirement/nursing home) is proposed to be less than 10% of the total proposed gross floor area. The majority of parking is currently intended to be located below grade, but the applicant has raised the possibility of an above ground parking structure.  The site plan remains quite preliminary, and no specific information with respect to gross floor area for individual uses, number of parking spaces, numbers of residential units, etc. are available at this time.

 

The applicant’s main goal at this point is to amalgamate their congregation into one central place of worship.  The first phase of development would include the Cathedral, chapel and bishop’s residence.  The subsequent phases would build out the remaining ancillary uses proposed for this site. 

 

Zoning By-law and Official Plan amendments required

The lands are currently designated Business Corridor in the Official Plan.  The intent of this designation is to accommodate a mix of high quality business activities, but this designation also provides for places of worship.

 

The subject lands are currently zoned Business Corridor under By-law 119-73, as amended (Figure 2).  In 1997, a site specific zoning by-law amendment (By-law 144-97) rezoned the property to Business Corridor (BC) and added a list of permitted uses, which included a place of worship.

 

In order to accommodate the proposed development, both the official plan and zoning by-law would have to be amended to permit the proposed senior’s residence, and retirement/nursing home.  In addition, the zoning by-law would also have to be amended to permit the proposed private school and museum. All other uses proposed in this development are currently permitted in the official plan and zoning by-law that apply to the subject lands.

 

The current zoning on the property (By-law 144-97) contains zoning standards that reflect the previous proposal.  The appropriateness of the official plan and zone category, as well as development standards will be reviewed as part of these app lications.

 

Water allocation has not yet been granted for the residential component of the proposed development

The Engineering Department has advised that water allocation has not yet been granted for the proposed residential component of the development.  This matter remains to be reviewed.

 

POTENTIAL BENEFITS OF APPROVAL OF THE PROPOSAL:

Some of the anticipated benefits include:

 

 

CONCERNS/ISSUES TO BE RESOLVED:

The following is a brief summary of concerns/issues raised to date. These matters, and any others identified through the circulation and detailed review of the proposal, will be addressed in a final staff report to be presented to Committee at a later date:

 

·        Site plan application required prior to zoning approval;

·        Compatibility of proposed built form with existing development requires further review;

·        Orientation and location of proposed buildings requires further review;

·        Gross floor area of proposed buildings, number of residential units, parking standards, location of parking, building heights, etc. remains to be determined;

·        Clarification as to whether the proposed community centre will be made available to those outside the congregation;

·        Traffic and parking demand analysis study is required;

·        Development Phasing plan needs to be submitted;

·        Staging plan for servicing required by Engineering Department;

·        Servicing Study required to confirm if there is sufficient capacity within the downstream sanitary sewer;

·        Water allocation for the proposed residential component of the development remains to be reviewed;

·        Comments from external agencies required;

·        Confirmation required regarding potential severances; and

·        Appropriate land use designation and zoning to reflect the proposed development remains to be determined.

 

FINANCIAL CONSIDERATIONS:

There are no financial implications for the Town in this report.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The applications were circulated to internal departments (Fire, Building, Engineering, Design, Waste Management), and external agencies for comments.

 

Public Meeting should be held once issues have been sufficiently addressed

It is recommended that staff be authorized to call a Public Meeting when issues noted in this report have been sufficiently addressed.

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning and Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

 

 

 

 

 

 

 

FIGURE 1

 

DOCUMENT:             Q:/Development/Planning/Appl/Zoning/03105829/DSC_Mar4

 

ATTACHMENTS:   

 

Figure 1 – Location

Figure 2 – Area Context/Zoning

Figure 3 – Aerial

Figure 4 – Proposed site plan

Figure 5 – Conceptual plan of proposed religious campus

 

APPLICANT/AGENT:          Joanne Barnett                          Tel: (416) 567-1751

                                                6 Dunkirk Road                        Fax: (416) 423-1980

                                                Toronto, ON

                                                M4C 2L9