DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Valerie Shuttleworth, Director of Planning & Urban Design

Jim Baird, Commissioner of Development Services

 

 

 

 

PREPARED BY:

George Duncan, Planner, Heritage and Conservation

 

 

 

 

DATE OF MEETING:

2003-Jul-07

 

 

 

 

SUBJECT:

PRELIMINARY REPORT

1302336 Ontario Limited, 165 Main Street North, Markham

Application for Zoning By-law Amendment and
Site Plan Approval to convert a Dwelling to a Business Office

Files: ZA 03108452 and SC 03108460

 

 

 


 

RECOMMENDATION:

That a Public Meeting be held to consider the application File ZA 03108452 and SC 03108460 submitted by 1302336 Ontario Limited for a Zoning By-law Amendment and Site Plan Approval to permit the conversion of an existing single family dwelling to a real estate office at 165 Main Street North, Markham.

 

PURPOSE:

The purpose of this report is to provide preliminary information regarding an application for a zoning by-law amendment and site plan approval and to recommend that Committee  authorize the scheduling of a public meeting.

 

BACKGROUND:

Property and Area Context

The subject property is located in the Markham Heritage Conservation District, on the east side of Main Street North. The property is considered a significant heritage building within the District, dating from c.1933, and is an excellent example of a larger home of the period, built with an Arts and Crafts movement influence. The rectangular-shaped parcel has an area of 1758.25 square meters (18,926 square feet) with a frontage of 28.374 meters (93 feet) on Main Street North. To the north, south and east are older single family homes. Across the road is a funeral home housed in a significant heritage building.

 

Proposal

The applicant is requesting a Zoning By-law Amendment and Site Plan Approval to convert an existing older home into a real estate office. The heritage building is to be preserved and an architecturally compatible two storey addition is to be made to the rear of the building, resulting in a Gross Floor Area of 536.5 square meters (5,775 square feet). A paved parking lot will be added in the rear yard, and there will be limited parking provided in the front yard. The property will be landscaped to screen the parking areas and to generally retain some of the residential character.

 

Official Plan and Zoning

The subject property is within the boundaries of Official Plan Amendment 108 (Main Street Markham Secondary Plan).  According to the General Policies of OPA 108, office uses in the area should expand incrementally from the commercial core, or occur at key strategic locations. Mixed residential-office uses should be directed to the area immediately north of the commercial core up to the railway crossing. The property is designated Medium Density 1 Housing/Office. In addition to the residential uses permitted under OPA 108, business and professional offices are permitted in existing buildings in accordance with 6.7.2 (iii) and 6.7.3 (See Appendix ‘A’) 

 

The current zoning category is R3-Residential under By-law 1229, as amended. A Zoning By-law Amendment is required to change the use from residential to business and professional office. Site Plan Approval is required to ensure that the treatment of the property is consistent with the intent of the Main Street Markham Secondary Plan and the Markham Heritage Conservation District Plan.

 

POTENTIAL BENEFITS OF THE PROPOSAL:

Approval of the Zoning By-law Amendment and Site Plan would enable a viable new use for this existing residential building and its property, and thereby preserve and enhance a heritage building within the Markham Heritage Conservation District.  It will also provide the opportunity to secure a heritage conservation easement on the property.

 

CONCERNS/ISSUES TO BE RESOLVED:

The following is a brief summary of concerns/issues raised to date. These matters, and any others identified through the circulation and detailed review of the proposal, will be addressed in a final staff report to be presented to Committee at a later date

 

A storm water management study is required to ensure that surface runoff is directed appropriately and will not impact adjacent properties. The paving of the parking lot and driveway will impact the ability of the property to absorb storm water.

 

More details are required from the applicant to show how the parking areas will be screened (particularly in the front) and staff recommend that  some of the asphalt paving of the driveway and front yard parking be done in tumbled pavers instead, to reinforce a more residential character on the site.

 

FINANCIAL CONSIDERATIONS:

There are no financial implications to be considered in this report.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The proposal has been circulated to other Town Departments and agencies for review and comment.

 

ATTACHMENTS:

Figure 1-   Application/Agent & Location Map

Figure 2 – Area Context and Zoning

Figure 3 – Aerial Photograph

Figure 4 – Site Plan

Figure 5 – Elevations

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 


 

DOCUMENT:             Q:\Development\Heritage\PROPERTY\MAINSTN\165\DEVELOPMENT SERVICES COMMITTEE july 7 2        003.doc

 

AGENT:                      Paul Baron                                           Tel. (416) 298-6000

                                    1302336 Ontario Limited                     Fax  (416) 298-6910

                                    1825 Markham Road, Unit 301

                                    Toronto, Ontario

                                    M1B 4Z9

 