DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning & Urban Design

 

 

 

 

PREPARED BY:

Mavis Urquhart, Senior Planner

Markham Centre Team

 

 

 

 

DATE OF MEETING:

September 23, 2003

 

 

 

 

SUBJECT:

Tenstone Developments Inc. (Circa @ Town Centre)

Development Agreement

Northwest Corner of Highway 7 and Town Centre Boulevard

SC 02110607

 

 

 


RECOMMENDATION:

THAT the proposed Development Agreement between Tenstone Developments Incorporated, the Town of Markham and the Regional Municipality of York be authorized for execution on the basis of this staff report, subject to finalizing details of the Agreement to the satisfaction of the Town Solicitor and the Commissioner of Development Services.

 

AND THAT site plan condition A.10 of Phase 1 site plan approval, as adopted by Council on July 8, 2003, respecting permanent underground encroachments in municipal right-of-ways, be deleted, since the proposed Development Agreement will reflect the Town’s proposed policy for treatment of underground encroachments, to the satisfaction of the Director of Engineering.

 

PURPOSE:

The purpose of this report is to describe the terms of the proposed Development Agreement between Tenstone Developments Incorporated, the Town of Markham and the Regional Municipality of York, for an approved mixed-use development to be located on the northwest corner of Highway 7 and Town Centre Boulevard (Figure 1 – Location Plan).

 

BACKGROUND:

On July 8, 2003, as a condition of site plan approval, Council directed that Tenstone Developments Incorporated enter into a Development Agreement to the satisfaction of the Commissioner of Development Services and the Town Solicitor, incorporating the principles outlined in a staff report entitled “Tenstone Developments Inc. (Circa @ Town Centre) Boulevard, dated July 7, 2003.” Council directed that the terms of the Agreement be brought back for authorization, prior to execution by the Town.

 

In November 2002, Council had approved amendments to the Official Plan and Zoning By-law, as well as a Precinct Plan for this development (Figure 2). At that time Council directed that Tenstone enter into a Development Agreement for the entire site, which would provide the framework for delivery, by the applicant, of key elements of public infrastructure to support this development. The proposed Development Agreement is, in effect, a Master Site Plan Agreement for the entire site. It provides conditions for broader matters affecting the overall site, such as project phasing, terms of the delivery of parkland, construction and dedication of the north/south public road, payment of development charges, and a variety of off-site requirements, such as provision of traffic signalization. The plans attached to the proposed Agreement include: a Master Plan showing phasing; the overall streetscape plan; overall landscape plan; the concept plan for the park, as well as a landscape plan for the linkage across the adjoining Hydro lands to the corner of Rodick Road and Highway 7. These schedules are appended as figures to this report.

 

Site plan agreements for the various phases of this development will be approved as the project builds out. Matters such as the final details of architectural and landscape design, parking layout and access will be dealt with at the site plan approval stage. The applicant received site plan approval for Phase 1 of this development on July 8, 2003 (northerly highrise, amenities building, all of the townhouses and the north/south road) and has been working with staff to finalize the Phase 1 site plan agreement.

 

OPTIONS/DISCUSSION:

Legal, Planning, Engineering and Urban Design staff has prepared a draft Development Agreement, which the applicant has reviewed. Staff is now prepared to recommend that this document be executed, subject to resolving final wording of clauses. The following sections of this report highlight seven major elements of the proposed Agreement and briefly comments on how the project will proceed to building permit issuance:

 

1.         Draft Development Agreement

Phasing of Development and Parkland

As discussed in detail in previous reports on this matter, phasing of building construction, underground parking, streetscaping, landscaping, parkland development, infrastructure and all other relevant elements for development of the entire site are set out in this Agreement. Schedules and tables identifying the overall phasing, landscaping, streetscaping, as well as a concept landscape plan for the public park and hydro corridor linkage are appended to the proposed Agreement (see Figures 2,3,4 and 5 to this report). This Agreement will provide guidance for site plan approval as the various phases of development proceed.

 

Parkland Dedication and Markham Centre Parkland Strategy

In accordance with the recommended Parkland Strategy for Markham Centre (which was endorsed by Development Services Committee on September 9, 2003), the Development Agreement recognizes the existing parkland dedication standard for Markham Centre and provides for a parkland dedication consisting of a combination of land (2.7 acres) and a cash-in-lieu contribution, based on a land value of $600,000.00 per acre.

 

The Agreement also acknowledges the intent to credit the owner for the delivery of enhanced park improvements, beyond the Town’s standard, which is currently valued at approximately $85,000.00 per acre. The proposed credit for the enhanced improvements to the parkland is calculated at up to a maximum of three times the base standard. The proposed Agreement further recognizes the intent of the Town to permit the Owner underground rights below the parkland for underground parking, at a nominal sum.  The value for the use of the rights below the parkland for private parking is predicated on the Owner entering into an agreement with the Town containing wording which specifies public benefits associated with the future use of parking, including parking authority relationships, membership in the Markham Centre Transportation Management Association, and public access to commercial parking during off-peak hours.

 

Based on this formula, the parkland contribution as provided for in the draft Development Agreement is as follows:

 

Parkland dedication required                                                                             6.9 acres

Credit for over dedication (north of Cox Boulevard)                              (0.9 acres)

Land to be conveyed                                                                                        (2.7 acres)

Total Parkland by Cash-in –Lieu                                                                       3.3 acres

 

Balance owing cash-in-lieu (3.3 acres x $600,000 per acre)                      $1,980,000.00

Less credit for enhanced parkland (based upon $255,000 in

improvements per acre in 2003 dollars)                                           $688,500.00

Plus value for below grade rights                                                                          nominal

 

Total balance owing to Town upon execution                                       $1,291,500.00

 

Park Design and Construction

The design of the public park is shown conceptually on a schedule attached to the proposed Development Agreement. The ultimate park design will be incorporated into a Final Park Plan prepared by the owner’s landscape architect for approval by the Town, prior to commencement of construction of the first park phase. The terms of this Development Agreement, as negotiated with the owner, require that the owner construct the park.

 

Construction and Dedication of the new North/South public road

The owner will construct the north/south public road at its sole expense and to Town specifications and shall ensure that the road is dedicated and open to the public prior to occupancy of any of the townhouse units in this project. Both of the highrise towers , senior’s/office building and two office buildings will ultimately link to the north/south public road. The connection of the highrise towers will be made in Phase 3 when the senior’s/office building and associated underground garage is constructed.

 

While the original development approvals of this project were based upon a full turn movements intersection with signalization, (which is supported by Town staff), Region of York staff, at this time, wish to restrict the access to Highway 7 to right-in/right-out only, pending an environmental assessment examining provision of rapid transit in the Highway 7 corridor. As a result, the proposed Agreement provides for the provision of limited access to Highway 7 (unsignalized R-in/R-out access), based upon Tenstone’s verification that the first Phase of development can be supported by this access arrangement (see Letter from Transportation Consultation attached as Appendix A).

 

The proposed Agreement would provide that the Owner shall endeavour to secure approval for a full movement signalized intersection from the Region prior to site plan approval of any future phases of this development and contribute to ½ the cost of the signalization.

 

Planning staff has advised the Region of York of the Town’s proposed approach respecting development of the future north/south public road.

 

Timing of Infrastructure Development

 

Development Charges

Based on discussions with staff and the Committee appointed by Council to resolve the parkland contribution for this project, the Owner has agreed to pay area specific development charges for Phase 1 Markham Centre on the basis of $1,200.00 per residential unit.  This figure has been agreed upon in advance of a new area specific development charge being finalized for Markham Centre and the Owner acknowledges that in the event the new area specific development charge adopted is less than the agreed upon figure, no refunds will be granted by the Town for the difference.  The applicant further agrees to not appeal the new updated development charge for Markham Centre when adopted, and the Town-wide ‘Hard’ Development Charge By-law.

 

Based on the above, the owner agrees to pay area specific development charges for Phase 1, as follows:

546 units @ $1,200.00 per unit                                                          $655,200.00

 

Below Grade Construction in the Public Right of Way

The owner has proposed to encroach into the public right-of-way with shoring for the purpose of constructing the apartment buildings adjacent to the street. Engineering staff has reviewed this request and in a report on this agenda, recommends that the Town establish a policy and conditions for the encroachment of shoring into the right-of-way to facilitate the construction of underground structures. Subject to approval of this report, entitled “Markham Centre Shoring Encroachment Agreement”, the Development Agreement will reflect the terms of the approach recommended in that staff report. To that end this report recommends deleting the requirements for the Phase 1 site plan approval that effectively prohibit permanent underground encroachments.

 

Walkway on Public lands

The owner will provide working drawings for a detailed walkway design for a proposed walkway across the adjoining hydro corridor based upon the Hydro Corridor Landscape Plan, which is attached as a schedule to the proposed Development Agreement. The owner will also provide a letter of credit to secure the cost of construction of the proposed walkway prior to occupancy of the townhouses west of the new north/south public road. The Town agrees to construct and maintain the walkway, subject to any agreement negotiated by the Town with appropriate authorities.

 

2.         Site Plan Agreement

            Status

Site Plan approval was granted for Phase 1 (northerly highrise, amenities building, townhouses and public road) on July 8, 2003, subject to conditions. A site plan agreement is now being drafted for Phase 1 of this development. As discussed earlier in this report, since new guidelines for permanent underground encroachments are being recommended for adoption and will be reflected in the proposed Development Agreement, it is appropriate that the following condition of Tenstone’s site plan approval for Phase 1, be deleted:

 

“A.10.                         THAT the Owner shall design the site so as to eliminate any permanent underground encroachment onto the municipal road rights of way”.

 

This is considered a minor change, since all conditions other than #10 would remain.

 

Next Steps

While the proposed Development Agreement is a Master Site Plan Agreement for the entire site that provides conditions for broader matters affecting the overall site, such as project phasing, and the terms of parkland delivery, more detailed matters, such as the architectural treatment and landscape design, parking layout and access are being dealt with at site plan approval stage. Site plan agreements for the various phases of this development will be approved as the project builds out.

 

The applicant received site plan approval for Phase 1 of this development on July 8, 2003 (northerly highrise, amenities building, all of the townhouses and the north/south road) and has been working with staff to finalize the Phase 1 site plan agreement. The Development Agreement and Site Plan Agreement for Phase 1 must be executed before the hold restriction appended to the zoning of the lands can be removed and building permits secured.

 

FINANCIAL CONSIDERATIONS:

The financial considerations have been resolved for this development proposal under Development Charges and the cash-in-lieu of parkland contribution as set out in this report.

 

ENVIRONMENTAL CONSIDERATIONS:

This application is located within Markham Centre and as such has been reviewed by the Advisory Committee, with particular emphasis on Green Infrastructure.  Through this review process the applicants have agreed to use District Energy to provide heating and cooling and have undertaken to provide energy efficient appliances and a green roof to help promote environmental sustainability by reducing heat island effect and stormwater discharge. A green roofing system is a permanent green space on top of a building. The green roof technology includes: roof structure and insulation, waterproofing membrane, drainage layer, landscape cloth to contain the roots and soil, soil/specialized growing medium and the plants.

 

ACCESSIBILITY CONSIDERATIONS:

This project is not geared specifically to address the needs of mentally or physically challenged individuals, however accessibility requirements will be implemented through the building permit review process, in accordance with the Ontario Building Code.

 

ENGAGE 21ST CONSIDERATIONS:

This project helps to provide the framework for the timely delivery of well-planned new communities, such as Markham Centre, that are phased and coordinated with the provision of infrastructure.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The Development Agreement has been circulated to all applicable department and agencies for comment. Detailed requirements of the applicable departments and agencies have been incorporated into the agreement.

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services


FIGURE 1

 

 

DOCUMENT    Q:\Development\Planning\APPL\SITEPLAN\02110607\dsc0916mu.pm.doc

 

ATTACHMENTS:   

 

Report Figures

Figure 1                        Location Map

Figure 2                        Precinct Plan

Figure 3                        Master Phasing Plan

Figure 4                        Master Landscape Plan

Figure 5                        Overall Streetscape Plan

Figure 6                        Concept Plan for Public Park (Open Space Concept)

Figure 7                        Concept Plan for linkage over hydro corridor

Appendix A                  Letter from Owner’s Traffic Consultant

 

APPLICANT/AGENT:              Mr. Steve Upton

                                                     4800 Dufferin Street

                                                     Toronto, Ontario

                                                     M3H 5S9

                                                     Telephone:          416-736-2541

                                                     Fax:                     416-661-0978

 

LOCATION PLAN