TO: |
Mayor and Members of Council |
|
|
|
|
FROM: |
Valerie Shuttleworth, Director of Planning and Urban Design Jim Baird, Commissioner of Development Services |
|
|
|
|
PREPARED BY: |
Gary Sellars, Senior Planner, East Development District |
|
|
|
|
DATE OF MEETING: |
|
|
|
|
|
SUBJECT: |
PRELIMINARY REPORT Borron Construction Inc. (Fram Building Group) Blocks 9 and 26, Plan 65M-3482 Applications for Secondary Plan and Zoning By-law amendments to permit
85 condominium townhouse units. OPA 04 009862 and ZA 04 009845 |
|
|
|
RECOMMENDATION:
That
a Public Meeting be held to consider the applications
submitted by Borron Construction Inc. (Fram Building Group) for Secondary Plan and Zoning By-law Amendments to permit 85
condominium townhouse units within the Swan Lake Retirement Community.
PURPOSE:
BACKGROUND:
Property and Area Context
The subject lands are comprised of
approximately 4.6 hectares (11.4 acres) within the Swan Lake Retirement
(condominium) Community (Figures 1 and 2).
The lands are currently vacant.
To the west and east are existing bungalows
and townhouses. To the south, across
The Greensborough community abuts the Swan
Lake Retirement Community to the north, west and east.
The lands are designated Medium Density (Area
II) Housing by the Swan Lake Secondary Plan (PD 30-1). This designation permits a variety of
dwelling types having an average net site density within the range of 37.1 to
79.9 units per hectare (15 to 32.3 units per acre). The lands are zoned Residential Two - Hold
(R2*1 [H]) by By-law 177-96. The zoning includes a site specific provision
which restricts permitted uses to apartment buildings only.
The applicant is proposing to construct 85 condominium townhouse units (one
storey with loft) on the lands. A north/south collector road through the lands will
eventually connect
The applicant has submitted the following applications to implement this
proposal:
A
site plan application will be submitted for this proposal shortly. An application for draft plan of condominium
approval would be required subsequent to site plan approval.
POTENTIAL BENEFITS OF APPROVAL OF THE
PROPOSAL:
The following is a brief summary of concerns/issues raised to date. These matters, and any others identified through the circulation and detailed review of the proposal, will be addressed in a final staff report to be presented to Committee at a later date.
1. Departure of proposal from the original master plan for the community
The original master plan for the retirement community comprised a mix of residential unit types including detached, townhouse and apartment units. Two apartment buildings have been built at the eastern boundary of the community; the remainder of the community that has been built to date is comprised of detached and townhouse units.
The applicant has advised the current market for apartment units in this community is small, compared to that for detached and townhouse units. Representatives of the existing community have also indicated a preference for the detached and townhouse units on the subject lands.
2.
Community Involvement and
Site Plan Approval
The applicant has been meeting with representatives of
the existing
Town staff will continue to work with the applicant to finalize a site plan for presentation at the public meeting.
3. Review and approval of engineering studies will be required
The following studies will be required for staff’s review of this proposal:
·
a transportation study to
determine the impact of the proposed development on the traffic circulation
within the community and if the north/south collector road connection to
· a noise impact study to determine if any noise attenuation measures are required
· a functional servicing study to confirm adequate sanitary and storm sewer capacity and watermain pressure are available to service the proposed development
4. Water Supply Allocation
Water supply was allocated for the development of these lands in 1995 upon draft plan of subdivision approval.
FINANCIAL CONSIDERATIONS:
No
financial implications are to be considered in this report.
ENGAGE 21ST. CONSIDERATIONS:
Managed
Growth
The
development of these lands represents an orderly completion of the Swan Lake
Retirement Community.
ACCESSIBILITY CONSIDERATIONS:
Accessibility
for physically/mentally challenged persons will be considered as a component of
site plan approval.
BUSINESS UNITS CONSULTED AND AFFECTED:
The
proposal is currently in circulation to other Town Departments and agencies for
review and comments.
ATTACHMENTS:
Figure
1 - Applicant/Agent & Location Map
Figure
2 - Area Context/Zoning
Figure
3 – Air Photo
Figure
4 – Site Plan
|
|
|
Valerie
Shuttleworth, M.C.I.P., R.P.P. Director
of Planning and Urban Design |
|
Jim Baird, M.C.I.P., R.P.P. Commissioner
of Development Services |
FIGURE 1
DOCUMENT # Q:\Development\Planning\APPL\ZONING\04
009845 Borron Construction\rdscgsMay18.doc
LOCATION MAP: