DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Valerie Shuttleworth, Director of Planning and Urban Design

Jim Baird, Commissioner of Development Services

 

 

 

 

PREPARED BY:

Gary Sellars, Senior Planner, East Development District

 

 

 

 

DATE OF MEETING:

May 18, 2004

 

 

 

 

SUBJECT:

PRELIMINARY REPORT

Borron Construction Inc. (Fram Building Group)

Lakeside Vista Way, Swan Lake Retirement Community

Blocks 9 and 26, Plan 65M-3482

Applications for Secondary Plan and Zoning By-law amendments to permit 85 condominium townhouse units.

OPA 04 009862 and ZA 04 009845

 

 

 


 

RECOMMENDATION:

That a Public Meeting be held to consider the applications submitted by Borron Construction Inc. (Fram Building Group) for Secondary Plan and Zoning By-law Amendments to permit 85 condominium townhouse units within the Swan Lake Retirement Community.

 

PURPOSE:

The purpose of this report is to provide preliminary information regarding applications for Secondary Plan and Zoning By-law amendments to permit 85 condominium townhouse units and to recommend that Committee authorize the scheduling of a Public Meeting.   

 

BACKGROUND:

Property and Area Context

The subject lands are comprised of approximately 4.6 hectares (11.4 acres) within the Swan Lake Retirement (condominium) Community (Figures 1 and 2).  The lands are currently vacant.

 

To the west and east are existing bungalows and townhouses. To the south, across Lakeside Vista Way, is the Swan Club (private community centre), vacant lands on either side of the community centre and Swan Lake.  To the north and west are vacant lands owned by Daniels Corporation for which townhouses have been approved.  Further to the north abutting Bur Oak Avenue are vacant lands owned by the Trustees for Swan Lake (Markham) Corporation.

The Greensborough community abuts the Swan Lake Retirement Community to the north, west and east.

 

Official Plan and Zoning By-law

The lands are designated Medium Density (Area II) Housing by the Swan Lake Secondary Plan (PD 30-1).  This designation permits a variety of dwelling types having an average net site density within the range of 37.1 to 79.9 units per hectare (15 to 32.3 units per acre).  The lands are zoned Residential Two - Hold (R2*1 [H]) by By-law 177-96. The zoning includes a site specific provision which restricts permitted uses to apartment buildings only.

 

Eighty five condominium townhouse units are proposed for the lands.

The applicant is proposing to construct 85 condominium townhouse units (one storey with loft) on the lands.  A north/south collector road through the lands will eventually connect Lakeside Vista Way to Bur Oak Avenue. An open space/walkway area is proposed on the eastern portion of the lands (Figure 4).    

 

The applicant has submitted the following applications to implement this proposal:

 

  • application to amend the Secondary Plan to redesignate the lands to Low Density (Area II) Housing. This designation permits a variety of dwelling types having an average net site density within the range of 17 to 37 units per hectare (6.9 to 14.9 units per acre). The proposed townhouse development has a density of 19 units per hectare (8 units per acre).

 

  • application to amend the Zoning By-law to permit townhouse units

 

A site plan application will be submitted for this proposal shortly.  An application for draft plan of condominium approval would be required subsequent to site plan approval.

        

POTENTIAL BENEFITS OF APPROVAL OF THE PROPOSAL:

The development of these lands would complete a portion of the community which has remained vacant for several years and has been unsightly to abutting unit owners.

 

CONCERNS/ISSUES TO BE RESOLVED:

The following is a brief summary of concerns/issues raised to date.  These matters, and any others identified through the circulation and detailed review of the proposal, will be addressed in a final staff report to be presented to Committee at a later date.

 

      1.   Departure of proposal from the original master plan for the community  

The original master plan for the retirement community comprised a mix of residential unit types including detached, townhouse and apartment units.  Two apartment buildings have been built at the eastern boundary of the community; the remainder of the community that has been built to date is comprised of detached and townhouse units.

 

The applicant has advised the current market for apartment units in this community is small, compared to that for detached and townhouse units.  Representatives of the existing community have also indicated a preference for the detached and townhouse units on the subject lands.

 

2.      Community Involvement and Site Plan Approval

The applicant has been meeting with representatives of the existing Swan Lake condominium corporations which comprise the retirement community and those unit owners abutting the subject lands.  The applicant is currently refining the site plan submission to address the input received from the community and Town staff.

 

Town staff will continue to work with the applicant to finalize a site plan for presentation at the public meeting.

 

3.   Review and approval of engineering studies will be required 

The following studies will be required for staff’s review of this proposal:

 

·        a transportation study to determine the impact of the proposed development on the traffic circulation within the community and if the north/south collector road connection to Bur Oak Avenue is required to support this proposal

·        a noise impact study to determine if any noise attenuation measures are required

·        a functional servicing study to confirm adequate sanitary and storm sewer capacity and watermain pressure are available to service the proposed development

 

      4.   Water Supply Allocation

Water supply was allocated for the development of these lands in 1995 upon draft plan of subdivision approval.

 

FINANCIAL CONSIDERATIONS:

No financial implications are to be considered in this report.

 

ENGAGE 21ST. CONSIDERATIONS:

Managed Growth

The development of these lands represents an orderly completion of the Swan Lake Retirement Community.

 

ACCESSIBILITY CONSIDERATIONS:

Accessibility for physically/mentally challenged persons will be considered as a component of site plan approval.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The proposal is currently in circulation to other Town Departments and agencies for review and comments.


 

ATTACHMENTS:

Figure 1 - Applicant/Agent & Location Map

Figure 2 - Area Context/Zoning

Figure 3 – Air Photo

Figure 4 – Site Plan

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning and Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

 

                                                                                                                                   


 

FIGURE 1

 

DOCUMENT #  Q:\Development\Planning\APPL\ZONING\04 009845 Borron Construction\rdscgsMay18.doc

 

 

 

 

APPLICANT/AGENT:            Sandra Wiles

                                                KLM Planning Partners Inc.                  Phone: (905) 669-4055

                                                64 Jardin Drive                                     Fax:     (905) 669-0097           

                                                Concord, Ontario

                                                L4K 3P3

 

LOCATION MAP: