DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning & Urban Design

 

 

 

 

PREPARED BY:

Margaret Wouters, ext. 2758

Senior Planner, South District

 

 

 

 

DATE OF MEETING:

June 1, 2004

 

 

 

 

SUBJECT:

FINAL REPORT

Official Plan, Rezoning and Site Plan Applications by Forest Bay Homes Ltd, to permit a gas station and drive-through restaurant at the northwest corner of Markham Road and Denison Street

 

 

OP 03-116661, ZA 03-116653, SC 03-116663


 

RECOMMENDATION:

That the Official Plan amendment application (OP 03-116661) submitted by Forest Bay Homes Ltd for lands at the northwest corner of Markham Road and Denison Street, be approved and the draft Official Plan amendment attached as Appendix ‘A’ be finalized and adopted;

 

That the draft Zoning By-law, attached as Appendix ‘B’, to exempt the lands subject to zoning amendment application ZA.03-116653 from Interim Control By-law 2002-215, as amended, be enacted;

 

That the zoning by-law amendment application (ZA. 03-116653) to amend By-law 90-81 as amended, submitted by Forest Bay Homes Ltd to permit a gas station and drive-through restaurant at the northwest corner of Markham Road and Denison Street, be approved and the draft Zoning By-law attached as Appendix ‘C’, be finalized and enacted;

 

That the Site Plan application (SC. 03-116663) submitted by Forest Bay Homes Ltd to permit a gas station and drive-through restaurant at the northwest corner of Markham Road and Denison Street, be approved subject to the following conditions:

 

1.      That the final site plan and elevation drawings be submitted to the satisfaction of the Commissioner of Development Services, including following revisions:

a.       the deletion of the “wrap-around” drive-through lane on the east side of the restaurant parallel to Markham Road, or alternatively, the provision of an upgraded landscaping treatment (including a combination of planting,  berming, and decorative fencing and paving) to screen the drive-through lane;

b.      the inclusion of the full-moves access from Markham Road within the site plan area;

c.       upgraded building elements, particularly with respect to rooflines and glazing, as part of an enhanced gateway treatment;

d.      any revisions required to implement the recommendations of the required traffic impact study, noise study and stormwater management study.

 

2.      That a Landscape Plan, prepared by a Landscape Architect having O.A.L.A. membership, be submitted to the satisfaction of the Commissioner of Development Services, and such drawing shall include an upgraded landscape gateway treatment at the northwest corner of the intersection of Denison Street and Markham Road, extending along the length of the Markham Road and Denison Street frontages;

 

3.      That the Owner comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Commissioner of Development Services, including fulfillment of the conditions of draft approval for plan of subdivision 19T-89126, as they pertain to Block 554;

 

4.      That the Owner enter into a site plan agreement with the Town, containing all standard and special provisions and requirements of the Town and public agencies including the following:

a.       Provision for the payment by the Owner of all applicable fees, recoveries, development charges, parkland dedications and financial obligations related to applicable Developers Group Agreements;

b.      Submission of a noise study and implementation of any recommended mitigation measures to the satisfaction of the Town;

c.       Screening of lighting from the gas station to mitigate its impact on existing residential development;

d.      Submission of  a traffic impact study, including lane redesign at the Denison Street intersection and implementation of the design, including conveyance of any required road widenings, to the satisfaction of the Town;

e.       Submission of a stormwater management report identifying storm drainage design for the proposed development and any required revisions to the Storm Drainage Plan and Overland Flow Plan for the subdivision (19T-89126) to the satisfaction of the Town;

f.        Conveyance of any additional required drainage easements identified in the stormwater management report; and

g.       Provision for contribution toward future landscape and median improvements along Markham Road in keeping with planned Regional improvements and the recommendations of the Markham Road Corridor Study regarding the creation of an urban streetscape (e.g., sidewalks, landscaping, paving, etc).

 

5.      And that the site plan approval shall lapse after a period of three years commencing June 1, 2004 in the event a site plan agreement is not executed within that period.

 

 

PURPOSE:

The purpose of this report is to recommend approval of the proposed Official Plan amendment, zoning by-law amendment and site plan applications by Forest Bay Homes Ltd to permit a gas station and drive-through restaurant at the northwest corner of Markham Road and Denison Street.

 

BACKGROUND:

Subject lands and area context

The subject lands comprise approximately 1.1 hectares (2.7 acres) of a 7.8 hectare (19.4 acre) parcel at the northwest corner of Markham Road and Denison Street as shown on Figure 1.  The 7.8 hectare parcel is identified as Block 554 on draft approved plan of subdivision 19T-89126.  Block 554 was draft approved as a commercial block, but has not been included in any of the registered phases of the subdivision.  

 

Three separate development applications were submitted for the lands within Block 554 as follows and as shown in Figure 2:

§         commercial development, consisting of a gas station and drive-through restaurant (Tim Horton’s);

§         a four storey, 51-unit apartment building; and

§         a 134 unit semi-detached condominium development.

 

This recommendation report deals only with the commercial application.  The apartment and semi-detached condominium applications will be addressed in separate future reports.  The applicant has requested that the recommendation report for these residential applications be deferred.

 

The subject lands are located at the southeast corner of Block 554, with approximately 100 metres of frontage on Markham Road and 90 metres of frontage on Denison Street.  The lands are currently occupied by a sales pavilion.  Surrounding land uses include a commercial plaza to the south and vacant lands comprising the remainder of Block 554 to the west and north. A golf driving range is located to the east across Markham Road.  The lands occupied by the driving range are also owned by the applicant, and have been approved for future low density residential development and a place of worship (Figures 3 and 4).

 

Proposal consists of gas station and drive-through restaurant

The proposal is for a gas station and drive-through restaurant (Tim Horton’s), with the gas station sited at the intersection of Denison Street and Markham Road, and the restaurant sited at the north limit of the site fronting Markham Road (Figure 5).  The gas station consists of a 217 m2 (2,335 sf) convenience retail store near the intersection, three pump islands and a 125 m2 (1,345 sf) touchless car wash.  The proposed restaurant is a 261m2 (2,809 sf) Tim Horton’s with a drive-through window.  Three accesses are proposed, including a full-moves access from Denison Street, a restricted-moves access on Markham Road near the intersection, and a full-moves access from Markham Road at the north limit of the site.  Proposed elevations are shown in Figures 6 and 7.

 

 

DISCUSSION

Markham Road Corridor Study vision approved in June, 2003

The subject lands fall within the study area of the Markham Road Corridor Study, which was initiated in 2002 to develop an urban design vision for the Markham Road corridor between 14th Avenue and Steeles Avenue. The resulting vision, adopted by Council in June, 2003, includes urban design guidelines for development along Markham Road, and a concept for the development of a community focus in the general area of the east side of Markham Road between Highglen Avenue and Golden Avenue.  The intersection of Markham Road and Denison Street is identified as a secondary gateway location which merits upgraded urban design attention. 

 
Official Plan and Zoning by-law amendments are required

The subject lands are designated Community Amenity Area in the Official Plan which supercedes the Community Shopping Centre designation in the PD 24-2 (Armadale East) Secondary Plan.   The Community Amenity Area designation in the Official Plan permits the restaurant use and provides for gas station and car wash uses subject to the review of specific development proposals and rezoning.  The location of gas station and car wash uses at this location is consistent with the policies for automobile service stations in the Official Plan, which identifies appropriate locations as having access from arterial or collector roads and restricting site size to approximately 0.6 hectares.  The proposed gas station development is located at the intersection of Denison Street (a collector road) and Markham Road (an arterial road) and has a site area of approximately 0.7 ha (about two-thirds of the total site area).   Official Plan policies also restrict to two, the number of gas stations at any one intersection, preferably on diagonally opposed corners.   The Secondary Plan identified a service station site at the southeast corner of Markham Road and Denison Street (prior to the approval of the new commercial designation categories in the Official Plan).  The subject site, adjacent to an existing commercial development, is preferable to the identified location on the east side of Markham Road for a gas station use, which has been zoned for institutional and residential uses as part of the Villages of Fairtree community. 

 

In terms of site design, the Official Plan policies require that the number of accesses be limited to minimize danger to vehicular and pedestrian traffic, that the principal buildings be oriented to the intersection with the pump islands located to the rear of the site to reduce visual impact and to provide a more pedestrian-oriented environment at the intersection.  Extensive landscaping is also required to improve the aesthetics of the site and to buffer adjoining properties from the activities of the gas station.  All of these requirements are met in the site plan which is discussed below. 

 

A draft Official Plan Amendment to bring the Secondary Plan into conformity with the Official Plan is attached as Appendix ‘A’.

 

The subject lands are zoned Community Commercial (CC) in By-law 90-81, as amended, which permits one shopping centre which may contain retail, supermarket, business and professional offices, personal service shops, restaurants, etc., with restrictions on the amount of the total gross floor area permitted to be occupied by certain uses.  The lands are also subject to Interim Control By-law 2002-215, as amended.  The interim control by-law, in effect until September, 2004, was enacted during the initial phase of the Markham Road Corridor Study to ensure that development inconsistent with the emerging vision for the area did not occur.   The interim control by-law will be lifted upon the completion of a land use analysis to confirm the appropriate land use designations for vacant parcels within the Markham Road Corridor, and the subsequent adoption of a Secondary Plan amendment.  The interim control by-law is under appeal to the Ontario Municipal Board by the owners of lands on the east side of Markham Road, south of Kirkham Drive.  The appeal of the interim control by-law does not prevent the Town from exempting the subject lands from the interim control by-law.

 

As the proposed commercial development does not represent a change in land use designation in the Official Plan, and as the Community Amenity Area designation provides for the mix of uses (e.g., retail, office, institutional, medium and high residential development) envisioned in the Markham Road Corridor Study, it is recommended that Council exempt the subject lands from the interim control by-law.  An amendment to exempt the subject lands is attached as Appendix ‘B’.  A draft amendment to Zoning By-law 90-81 to permit the proposed gas station and restaurant development is attached as Appendix ‘C’. 

 

Site plan is generally consistent with the Markham Road Corridor Study and is acceptable with the exception of the drive-through lane parallel with Markham Road

The proposed commercial site plan is generally consistent with the urban design guidelines for Markham Road, as well as the site design policies for gas stations in the Official Plan.   The Official Plan policies require that the number of accesses be limited to minimize danger to vehicular and pedestrian traffic, and that the principal buildings be oriented to the intersection with the pump islands located to the rear of the site to reduce visual impact and to provide a more pedestrian-oriented environment at the intersection.  Extensive landscaping is also required to improve the aesthetics of the site and to buffer adjoining properties from the activities of the gas station.  In addition, all building types should have direct pedestrian access to Markham Road to encourage pedestrian activity on the street.   The Markham Road urban design guidelines also promote the orientation of buildings to the street, with direct pedestrian access from the street and parking located towards the rear of the property, where possible.  The Markham Road/Denison Street intersection is identified as a secondary gateway location which merits upgraded design standards.

 

The proposed convenience store is sited as closely as possible to the intersection, with the gas pumps and car wash located in the interior, further from view from Markham Road.  The restaurant is also sited close to Markham Road.   Direct pedestrian access to Markham Road is provided from the restaurant, however, the access is interrupted by a drive-through lane on the east side of the building.  This drive-through lane parallel to, and visible from, Markham Road is not acceptable and it is recommended that the site plan be revised to delete this lane, or alternatively, that an upgraded landscaping treatment be provided (including a combination of planting, berming, and decorative fencing and paving) to screen the drive-through lane.  In addition, certain aspects of the buildings should be upgraded, particularly with respect to rooflines and glazing, to reflect the gateway location of this site, and the surrounding community.

 

Staff have had discussions with the applicant regarding an upgraded landscaped treatment at this corner, as part of the development of the site.  An appropriate landscape gateway treatment that extends the length of the Markham Road and Denison Street frontages are included as a condition of site plan approval. 

 

Integration of the commercial, apartment and semi-detached condominium sites

The proposed restaurant at the north limit of the subject site will share an access from Markham Road with the proposed apartment site to the north.  An indirect access to Denison Street from the proposed apartment site is also provided through the parking lot at the rear of the proposed commercial site.  No access between the commercial and apartment sites and the future semi-detached condominium site to the west are proposed or required.  Any potential access from the proposed semi-detached condominium development to the commercial and apartment sites would interfere with internal traffic circulation on these sites, or cause undesired infiltration from the commercial sites through the proposed residential condominium development.

 

Markham Road accesses have been approved; traffic impact study to be finalized

The Region of York has indicated approval for the right-in/right-out access from Markham Road for the gas station portion of the site and a full-moves access from Markham Road to serve the restaurant at the north limit of the site.  The northerly full-moves access should be removed from the apartment site plan and included as part of the commercial site plan.  The Region requires a southbound right-turn lane, and a northbound left-turn lane on Markham Road, which will be reflected in the final site plan.  A traffic impact study for all three applications on Block 554 has been undertaken to determine the impact of the proposed development on the immediate road network, and to identify improvements to the Denison Street/Markham Road intersection, including the need for any required road widenings to accommodate required improvements.  Any required revisions to the site plan resulting from the implementation of the recommendations of the traffic study, including any required road widenings on Denison Street as a result of the lane redesign, will be made prior to final approval of the site plan. 

 

Additional conditions of site plan approval include the submission of a noise study identifying mitigation measures required for the proposed residential development to the west and north, and provision for the screening of lighting from the proposed gas station development to mitigate its impact on the proposed residential development to the west.

 

Stormwater management and drainage requirements to be addressed on northern portion of Block 554

Currently, all of the lands within subdivision 19T-89126 drain into Block 554.  A stormwater management report for all of the lands within Block 554 is underway to identify required revisions to the storm drainage plan and overland flow plan for the entire subdivision.  Preliminary findings indicate the need for a redesigned overland flow route along the north limit of Block 554 to drain into the stormwater ponds on the east side of Markham Road.   Any impacts of the recommendations of the stormwater management report on the proposed gas station and restaurant site will be addressed prior to final site plan approval.

 

Developer contribution to Markham Road improvements

The Markham Road Corridor Study proposed a new street cross-section for Markham Road to make the arterial road more pedestrian-friendly in keeping with the urban design vision. The proposed new cross-section consists of four traffic lanes plus a five metre wide landscaped centre median intended to provide greenery, visual interest and a safe crossing area for pedestrians and cyclists.   The proposed cross-section also allows for a sidewalk and two rows of trees on each side of the street.  

 

Markham Road is under the jurisdiction of the Region of York.  It is recommended that a contribution toward future intended landscaping and median improvements in keeping with planned Regional improvements and the recommendations of the Markham Road Corridor Study regarding the creation of an urban streetscape (e.g., sidewalks, landscaping, paving, etc) be required as a condition of approval of the site plan application.

 

Issues raised at March 2, 2004 Public Meeting and March 29, 2004 Public Information Meeting have been addressed

Concerns raised at the Public Meeting and a subsequent Public Information Meeting, and in correspondence, were related to the gas station use, traffic, drainage, and interconnectivity between the sites.

 

Gas station use – concerns were raised regarding traffic generation, odour, air pollution, the need for an additional gas station and the potential for spills or explosions.  As stated above, this site complies with the Official Plan policies for gas station locations.  The proposed gas station is separated from existing residential development by the commercial plaza to the south across Denison Street, and will be separated from future residential development to the north by the restaurant.  The proposed gas station will be buffered from the proposed semi-detached residential development to the west by an 8 metre (26 ft) landscape buffer, half of which will be provided on the commercial site and half of which will be provided on the future residential site.  Any further buffering requirements will be identified as conditions of approval for the proposed residential development to the west.

 

With respect to pollution and safety, site plans for gas stations are subject to review, from a safety perspective, by the Technical Standards and Safety Authority under the Provincial T.S.S. Act.  Gas stations are located in many residential areas throughout the Town without incident.

 

Traffic – concerns were raised with respect to higher traffic levels, and impacts on the Markham Road/Denison Street and Denison Street/Marydale Avenue intersections.  As mentioned above, the applicant is undertaking a traffic study to identify the impact of the proposed development on the immediate road network, and to identify improvements to the Denison Street/Markham Road intersection, including the need for any required road widenings to accommodate required improvements. 

 

With respect to impacts on the Denison Street/Marydale Avenue intersection, the proposed full movement access from Denison Street to the gas station site will be aligned with the existing driveway to the commercial plaza on the south side of Denison Street.  Traffic movements to and from the site should have little impact on the Denison Street/Marydale Avenue intersection which is further west than the limit of the proposed gas station site.  The impact of the proposed residential development to the west on this intersection will be addressed in the final report for that development.

 

Drainage – a concern was expressed that alteration of the site would cause flooding on adjacent properties, as the site currently contains a drainage ditch for the entire subdivison.  The Town requires that all stormwater management be accommodated within a proposed development, so that drainage impacts are not felt on adjacent properties.  As stated above, a stormwater management study is being undertaken to identify a revised stormwater drainage plan for the entire subdivision. 

 

Interconnectivity – the issue of interconnectivity between the sites has been addressed above.  One of the concerns raised was the need for a connection with the lands to the north of the proposed apartment development.  This potential connection will be addressed in the final reports for the apartment and semi-detached condominium development applications.

 

FINANCIAL CONSIDERATIONS:

None at this time.

 

ENVIRONMENTAL CONSIDERATIONS:

None at this time.

 

ACCESSIBILITY CONSIDERATIONS:

The site plan has been reviewed with respect to the accessibility guidelines and was found to be acceptable.  Landscape plans will be reviewed for conformity with the accessibility guidelines prior to final plan approval.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

All Town departments and external agencies have been circulated with these applications and all comments have been considered in this report. 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 


DOCUMENT:  Q:\Development\Planning\APPL\ZONING\03 116709 Forest Bay Denison\Final Gas Station Report.doc

 

ATTACHMENTS:

Figure 1: Location Map

Figure 2: Composite Plan

Figure 3: Area Context/Zoning

Figure 4: Aerial Photo

Figure 5: Site Plan

Figure 6: Elevations – Gas Station

Figure 7: Elevations - Restaurant

 

Appendix A – Draft Official Plan Amendment

Appendix B – Interim Control Exemption By-law

Appendix C – Draft Zoning By-law

 

APPLICANT:             Forest Bay Homes Ltd

                                                1151 Denison   Street, Unit 18

                                                Markham, ON

                                                L3R 3Y4

 

AGENT:                                 Stephen Armstrong                                           Tel: 416-332-7548

                                                Armstrong Goldberg Hunter                              Fax: 905-882-2069

9251 Yonge Street                                          

                                                Suite 302

                                                Richmond Hill, Ont.

                                                L4C 9T3                                 

                                               