DEVELOPMENT SERVICES

COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

David Clark, Town Architect

Valerie Shuttleworth, Director of Planning & Urban Design

Jim Baird, Commissioner of Development Services

 

 

 

 

PREPARED BY:

Markham Centre District Team

Doris Cheng, Planner – extension 7922

 

 

 

 

DATE OF MEETING:

June 28, 2004

 

 

 

 

SUBJECT:

RECOMMENDATION REPORT

Markham Family YMCA Site Plan Approval

7996 Kennedy Road

Concession 5, Part Lot 8

File Number SC 03.118511

 

 

 


 

RECOMMENDATION:

That the recommendation report entitled “Markham Family YMCA, Site Plan Approval, 7996 Kennedy Road, Concession 5, Part Lot 8, File Number SC 03.118511” be received;

 

That the site plan application (SC 03.118511) for the lands at 7996 Kennedy Road be approved for the Markham Family YMCA, subject to the following conditions:

 

  1. That the owner shall submit final drawings for the entire site, including but not limited to, site plans and elevations drawings, landscape plans, and engineering drawings that comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Commissioner of Development Services;

 

  1. That the owner enter into a site plan agreement with the Town, containing all standard and special provisions and requirements of the Town, Region of York and other public agencies prior to commencing any work on the site or road allowance, including providing any associated financial securities;

 

  1. That the owner shall ensure satisfactory arrangements have been made to satisfy all obligations, financial or otherwise required in the site plan agreement, including provision for payment of all applicable fees, recoveries, cash-in-lieu of parkland, Developer’s Group obligations, local services contributions and development charges, including any applicable arrangements with the Town pertaining to the Town’s financial commitment to the cost of constructing the facility;

 

  1. That a Landscape Plan and Landscape Phasing Plan be submitted, prepared by a Landscape Architect having O.A.L.A. membership, incorporating the required enhanced landscaping elements along the future “YMCA Boulevard”, in accordance with the criteria of the Town of Markham Urban Design Department, to be approved by the Commissioner of Development Services;

 

  1. That owner prepare a tree inventory and preservation plan, to be approved by the Commissioner of Development Services.  The owner covenants and agrees not to remove or allow the removal of any trees without prior written approval of the Town.  In the event a tree to be preserved is damaged, dies as a result of act or omission, or is removed, the owner shall provide a replacement tree(s) as approved by the Town or funds equivalent to the values as set out in the International Society of Arboriculture Guide for Plant Appraisal;

 

  1. That the owner shall provide a Letter of Credit based upon an appraised value for the trees to be retained;  both the retention and monetary value of the trees are to be assessed by an Arbourist as per Town standards;

 

  1. That the owner shall covenant and agree in the site plan agreement to provide for the urbanization and landscaping of “YMCA Boulevard” including the construction of sidewalks along the entire frontage of the YMCA lands and the leased parking property to the west at no cost to the Town, and in accordance with the plans approved by the Town, to the satisfaction to the Commissioner of Development Services.  A Letter of Credit will be required for any required works that cannot be completed at the time of construction pending final urban design studies;

 

  1. The owner shall contribute to downstream stormwater quality control retrofit projects in the amount of $21,855.77 per impervious hectare of developable land, or provide equivalent on-site stormwater quality control, plus spill control based on impervious ground area as required by provincial policy;

 

  1. The owner shall provide a cultural heritage resource assessment for the lands to ensure the assessment and identification of appropriate treatment of built heritage and archaeological resources, and further to mitigate any identified adverse impacts to significant heritage resources to the satisfaction of the Town (Commissioner of Development Services) and the Ministry of Citizenship, Culture and Recreation.  No demolition, grading, filling or any form of soil disturbances shall take place on the lands within the plan are prior to the issuance of a letter from the Ministry of Citizenship, Culture and Recreation to the Town indicating that all matters relating to heritage resources have been addressed in accordance with licensing and resource conservation requirements. 

 

  1. The Owner shall covenant and agree in the site plan agreement to implement any measures recommended by the heritage resource assessment, to the satisfaction of the Town and the Ministry of Citizenship, Culture and Recreation.  Should archaeological remains be found on the property, the owner shall immediately notify the Ministry of Citizenship, Culture and Recreation.  The Owner shall also immediately notify the Ministry of Citizenship, Culture and Recreation and the Registrar of the Cemeteries Regulation Unit of the Ministry of Consumer and Commercial Relations if human remains are encountered during construction.  The Owner shall also agree to the inclusion of the above requirements in the site plan agreement.

 

  1. That the owner be required to decommission the existing residential septic system and connect the heritage home to municipal services, to the satisfaction of the Director of Engineering;

 

  1. That the owner enter into a Heritage Easement Agreement (Thomas Rivis House) with the Town prior to execution of the site plan agreement and provide a letter of credit of the amount of $25,000.00;

 

  1. That the owner shall agree in the site plan agreement with the Town to provide a detailed preservation, restoration and landscape plan for the designated heritage home (Thomas Rivis House);

 

  1. That the owner provide a Markham Remembered Plaque outlining the history of the house.  The plaque is to be installed by the owner at a visible location on the property;

 

  1. That the owner permit the Town (Heritage Planning Section) the opportunity to review and document the existing historic barn prior to removal;

 

  1. That the owner offer the barn and out building or component parts and items stored therein to the Markham Museum;

 

  1. That the owner advertise the availability of the buildings for relocation elsewhere in the community or the salvaging of architectural features on the Architectural Conservancy of Ontario website and in a newspaper which covers the Town of Markham (Thornhill Liberal and Markham Economist & Sun) for a period of not less than two (2) weeks prior to demolition, and to submit proof of this advertising;

 

  1. That the demolition of the out buildings be undertaken in such a manner as to expose the construction techniques used in the subject building for documentation and educational purposes;

 

  1. That the Commissioner of Development Services be authorized to modify the site plan and elevations as outlined in the report as may be necessary to permit development to occur in keeping with the intent of Town guidelines, standards and performance measures, as well as to reflect key transportation infrastructure and servicing requirements;

 

  1. That Council be kept apprised of any modifications to the site plan and elevations which may have a significant effect on the overall delivery of the municipal services, roads or the YMCA facility;

 

  1. And further that the site plan approval will lapse after a period of three years commencing June 28, 2004, in the event that a site plan agreement is not executed within that period. 

 

PURPOSE:

The purpose of this report is to recommend site plan approval for the lands at 7996 Kennedy Road in Markham Centre for the Markham Family YMCA and parking facilities.

 

BACKGROUND:

Chronological Summary

The YMCA approached the Town of Markham regarding the potential of locating a facility within Markham Centre.  In the fall of 2000, Council considered a feasibility report from Community Services Commission staff.  In April 2002, continued discussions resulted in Council endorsing the Principles of a Framework for the Development of a new YMCA.  During these discussions, the Province of Ontario agreed to provide land for nominal consideration for the future YMCA site plan, the land for associated parking facilities on a long-term lease basis.  On June 14, 2002, the Town of Markham announced the plans for the development of the YMCA in Markham Centre. 

 

As part of the negotiations between the Province and the Town, Development Services Commission staff brought forward an official plan and zoning amendment to permit the future YMCA and other Business Park uses on adjacent provincially owned lands.  These amendments were adopted and enacted by Council on April 29, 2003.

 

On November 11, 2003, the architectural firm Moriyama & Teshima submitted an application on behalf of the YMCA for site plan approval.  Since submission, the site plan has evolved and revisions have been submitted. 

 

On March 31, 2004, the Ontario Realty Corporation transferred a 4.0 acre parcel of land within the larger ±28 acre block at 7996 Kennedy Road to the Town of Markham for the future Markham YMCA facility.  On June 1, 2004, Council authorized the execution of an Agreement of Purchase and Sale and Facility Construction, Use and Disposition Agreement for the conveyance of the lands at 7996 Kennedy Road to the YMCA of Greater Toronto.  This conveyance to the YMCA (anticipated to be completed by the end of June) is a portion of the Town of Markham’s commitment to the cost of the proposed facility.  The balance of the Town’s commitment is comprised of the waiving or refund of fees, charges, and levies to a maximum of $6.0 million inclusive of the land value.

 

Site description and area context

The site is approximately 4 acres in area, with a long term lease agreement for an additional 2 acres of land to be provided by the ORC for parking facilities (refer to Figure 1).  The lands are situated west of Kennedy Road, north of Highway #407, south of “YMCA Boulevard”, and east of the Unionville GO Station.  The land includes a portion of the driveway access easement to the GO Station, which has been transferred to the Town from the ORC.  This easement is anticipated to be upgraded to municipal road standards by August 2005, in preparation for the opening of the YMCA.  Once the road is reconstructed to meet municipal standards, it will be dedicated as a public road and is proposed to be named “YMCA Boulevard”.

 

To the north are the Emerson industrial building, Rouge River Valley and Unionville Fairways golf course.  Unionville Fairways is currently owned by the York Region District School Board, which is proposing a future high school, specializing in athletic excellence.  West of the site is the Unionville GO Station and commuter parking lot that accommodates over 812 vehicular parking spaces and a bus round about.

 

Currently, the 4.0 acre land parcel dedicated for the Markham Family YMCA is vacant except for the designated ‘Thomas Rivis’ heritage house and associated out buildings, including a barn.

 

The proposal is consistent with Official Plan and Secondary Plan policies

In April 2003, Council adopted an Official Plan and Secondary Plan amendment for the ORC lands, designating the subject lands Business Park and Open Space, which permits office, commercial, business and recreational uses.  This amendment included designating a significant amount of land for employment purposes, given the high degree of exposure and accessibility of this location as a key gateway to Markham Centre. 

 

The proposal is consistent with the existing zoning by-law

In April 2003, Council enacted zoning amendments to incorporate the lands at 7996 Kennedy Road into Urban Expansion Area By-law 177-96 and zone the lands as Business Park (BP), with specific permissions for the YMCA use and associated parking, therefore the proposal is consistent with the existing zoning and an amendment is not required.

 

The proposal is consistent with the vision for Markham Centre

The location of the YMCA facility is consistent with the intentions of OPA #21 and will provide a social, recreational, and cultural focus for the Markham Centre community as outlined in the Guiding Principles for Markham Centre.  The proposed facility is anticipated to be a recreational destination and community focal point, while providing an improved level of community services in the Town. 

 

Land negotiations are complete

A registered reference plan (65R-25842) has been submitted to the Legal Department, delineating the final property boundaries, which the Ontario Realty Corporation transferred to the Town on March 31, 2004.  These lands will be conveyed to the YMCA as part of the Town of Markham’s cost sharing agreement for the site and construction costs for the YMCA.  The Town agreed to contribute up to one-third of the estimated project costs through provision of land, waived fees and charges and funding from development charges, provided that adequate public access to the YMCA’s programs and facilities is provided.

 

The Ontario Realty Corporation has transferred the lands the YMCA will be constructed upon as well as parts 1, 2, 3, and 4 which encompass the existing GO Transit access road to the Town.   Once the access road is dedicated as a public road, it is intended the road will be named “YMCA Boulevard,” as requested by the YMCA and passed in the Council resolution on April 13, 2004. 

 

PROPOSAL

A YMCA facility and associated parking is proposed

The subject lands consist of two parcels.  A four acre parcel will be transferred to the YMCA to accommodate the YMCA building, a portion of the required parking, the heritage house, and sodded programmable spaces.  A two acre parcel adjacent to the building will be retained by the Province and leased to the YMCA to accommodate parking requirements on a long-term lease basis. 

 

The YMCA proposal is for an approximately 60,500 ft² (5,620 m²) building as part of its strategic plan for the development of new facilities for the GTA.  The facility will consist of an indoor swimming pool, fitness area, gymnasium, running track, meeting rooms, change rooms, and various ancillary facilities and programs for personal growth and development.  The proposal includes the restoration of the heritage house that exists on site, with the intent to maintain the structure until an appropriate use can be determined. 

 

OPTIONS/DISCUSSION:

The Thomas Rivis Heritage House will be subject to Heritage Planning requirements

The designated Thomas Rivis Heritage Home (built circa 1855) at 7996 Kennedy Road, has been designated under the Ontario Heritage Act for its historical and architectural context, and is considered a significant structure to be preserved.  A heritage easement agreement is required as a condition of site plan approval, and will require preservation and restoration in accordance with Section 3.10 of OPA #21.  Its preservation is also consistent with the provisions of Section 2.5 of the Official Plan (revised 1987) as amended.  The existing heritage home is to be retained on its original foundation and integrated into the proposed facilities as an appropriate adaptive use.  The heritage home has also been included in the agreement of purchase and sale to ensure the submission of a heritage assessment and appropriate restoration and preservation initiatives.

 

The YMCA has agreed to incorporate the existing heritage structure within the new development as a functional component of the plan.  However, at this time the YMCA has not determined a program/use for the heritage home.  Additional information will be required at the time of restoration, including detailed plans outlining how the building is to be restored, for review and comment by Heritage Markham.  The barn and any accessory buildings and their components which cannot be preserved within the development will require historical documentation by a professional heritage consultant and advertisement of their availability for relocation and salvage, and also offered to Heritage Markham and the Markham Museum at no cost. 

 

The YMCA reflects the intent of the Markham Centre Performance Measures

The Markham Centre Performance Measures were created as a community based approach to guide and monitor the development of Markham Centre in accordance with the community’s goals, values and expectations.  In preparing the measures, regard for high quality standards and best practice models derived from other municipalities and corporations. Staff are of the opinion that the initiatives undertaken by the YMCA to meet the criteria outlined in the “Performance Measures Document; The Markham Centre Vision for Sustainability and Smart Growth” warrants a rating of ‘Silver’ which may evolve into an improved rating as the surrounding lands develop and the need for surface parking is reduced.  The following is a summary of how the proposed Markham Family YMCA addresses the goals and objectives of each subgroup.

 

Greenlands

The YMCA site is not located adjacent to the Markham Centre Greenlands; however the treatment of stormwater management will significantly contribute to the on-site groundwater base flow to the Rouge River which will aid in sustaining a healthy natural and wildlife habitat.  This is further addressed in the section on Green Infrastructure.

 

Green Infrastructure

The proposal offers strategies with a focus on initiatives that contribute to water conservation, waste reduction and efficient energy conservation.  Examples of the initiatives proposed to be undertaken by the YMCA program include but are not limited to:

 

§         Implementing bioswales and meadow areas for stormwater storage and groundwater infiltration

§         Landscaping around the building to reduce interior microclimatic requirements

§         Connecting to District Energy to supply heat for the building’s air handling units and domestic hot water

§         Providing a ‘Heat Wheel’ on a Make-up Air System to provide heat recovery and a wrap around heat pipe recovery system for dehumidification control

§         Providing opportunities for natural ventilation by utilizing operable windows, free cooling and night purging of interior air

§         High performance glazing on the windows for energy conservation

§         Installing water conserving plumbing fixtures

§         Implementing and promoting a recycling program for waste recovery

§         Providing energy efficient lighting, high efficiency transformers, and occupancy sensors to ensure lights are turned off automatically to eliminate light pollution in the interior and on the exterior of the building

 

Transportation

The site is located adjacent to various modes of transportation that encourage alternatives to single occupancy vehicles such as GO Transit, future YRTP transit, local YRT buses, and is adjacent to roads with dedicated bicycle lanes.  The YMCA also provides showers, change rooms, lockers and bicycle racks to promote cycling as a viable transportation alterative.  Upgraded sidewalks and pathways have been integrated to connect private and public areas, and provide links to public transportation beyond the YMCA lands. 

 

While the 4 acre YMCA site will accommodate a portion of the parking supply, the adjacent two acre parcel under long-term lease will accommodate the majority of the surface parking for members.  The site plan illustrates the parking lot will not be fully developed until the number of members to the YMCA warrants the need for additional parking.  It is the long-term vision for the area to eliminate the surface parking on the 2 acre parcel and consolidate parking resources in a structure to serve the needs of the greater area, including future offices, institutional uses and commuter parking.  This intent, over the long-term, will provide additional lands for a higher order of use other than surface parking, as the surrounding lands develop.

 

Built Form

The north façade of the building reinforces the building street line in conformity with the performance criteria.  The north face is arcaded to provide protection for pedestrians.   The building entrances and internal orientation responds to a north-south pedestrian route, connecting the street and building through to the heritage structure at the south edge of the property, integrating the heritage facility into site.  The orientation of the building ensures the main entrance is the main architectural element at the intersection, creating a high degree of visibility from the street and beyond.  This entrance is appropriately located across the street from the future transit stop, and terminates the vista from the north-south road connecting to the future alignment of Enterprise Boulevard and the proposed High School beyond.  The parking is set back from the street a significant distance to permit landscape buffering to screen the parking from the street edge.  The glazed curtain wall provides opportunities for permeable interaction of the public realm with programmed YMCA activities, and with the aid of lighting, the design further highlights the building face to enhance the urban character of the building in the evening.  Additional information pertaining to the materials is further discussed within the section of the report pertaining to the site plan design and elevations of the building.

 

 

Open Space

The sodded areas around the building have been designed with accessibility and safety in mind.  Landscape features have been designed to provide active and passive recreational opportunities to support activities throughout the year.  These features include a variety of native plant materials, encouraging biodiversity in formal and informal landscaped areas.  A combination of architectural and landscape design components aid in the screening of the parking lot from the street edge.  This includes an architectural wall feature at the entrance, a variety of street trees and shrubs, as well as a planted berm, all contributing to minimizing the visual impact of the parking lot.

 

The applicant has indicated that the funds to complete the landscape plan may not be available upon the opening of the facility, and may be installed as funding becomes available through membership enrolment.  As a condition of approval, a phased landscape plan will be required to identify the stages of planting for the facility, with priority placed upon the urban boulevard street trees.

 

The construction of “YMCA Boulevard” has commenced

An environmental assessment has been completed and approved by the Town and the Ministry of the Environment.  The assessment provides for the extension of Enterprise Boulevard to Kennedy Road, the north-south road link to “YMCA Boulevard” and the reconstruction of “YMCA Boulevard” to the existing Unionville GO Station.  This collector road network will contribute significantly to the necessary transportation framework for the East Precinct area.

 

The Town has awarded a contract to provide for the construction of these works including municipal services. “YMCA Boulevard” will be constructed as a five lane cross-section, with dedicated bicycle lanes and a stormwater management pond, all to service the YMCA.   The works are to be completed by the end of 2005, to coincide with the projected opening of the Markham Family YMCA.  Municipal services are expected to be installed by early fall of 2004, meeting the YMCA construction schedule. 

 

Town staff is also working with the consultants to assist the YMCA in the coordination of utilities (telephone, cable, gas, hydro) to the site.  It is anticipated that the utilities will be coordinated with the construction of the road to be installed within the boulevard.  Discussions continue between the consultants and the utility companies.

 

Connections to municipal services are required for the existing home

The existing heritage residence on the YMCA lands utilizes a septic and well system.  The YMCA will be required, as part of the restoration of the building, to decommission the well and septic system and connect the Heritage House to new municipal water and sanitary services available on “YMCA Boulevard”.

 

Stormwater management study has been submitted for review

A stormwater management report was submitted to the Engineering Department for review.  In addition to conventional stormwater management methods, the proposal includes on-site source controls in the form of bio-swales located at the northwest and southwest corners of the site.  These bio-swales will provide drainage for the proposed parking lot and also increase the amount of infiltration into the surrounding lands.  In the event that membership increases and the demand for additional vehicle parking is required, the bioswales will be relocated to accommodate the parking expansion.

 

Access to the site

Proposed access to the YMCA site is provided by two separate driveways from “YMCA Boulevard”.  The westerly access provides an entrance to the drop off and parking areas.  Service vehicles, maintenance vehicles and a minimal employee parking are available at the eastern entrance.  The accesses were located to allow the building to be located at the terminus of the intersection to provide a strong architectural presence along the street edge.  The primary western entrance is proposed to regulate access with a gate in the future, (when deemed necessary) which will require card membership access.  Based on various YMCA projects within the Greater Toronto Area, the YMCA has indicated that the stacking distance proposed for the future membership gate is sufficient to meet the needs and time requirements necessary to enter the parking lot.  Emergency vehicles will be able to automatically gain access to the site.  As development proceeds in the East Precinct, it is anticipated that access to the YMCA will be relocated and consolidated to the local road network to the south and east of the YMCA lands. 

 

Additional traffic and access improvements localized to the YMCA site includes lay-by drop off, bicycle racks and enhanced pedestrian access to local transit stops, to encourage alternative modes of transportation. 

 

 

An archaeological survey is required

In accordance with the Ministry of Culture’s policies, an archaeological survey is required to determine if any artefacts of cultural or historical significance remain on site.  If any significant resource is discovered through excavation, the landowner must contact the Ministry of Culture.

 

The Town has undertaken a Precinct Plan for the East Precinct of Markham Centre

OPA 21 calls for preparation of “Precinct Plans” within Markham Centre which are detailed “Master Plans”. They are intended as physical structure plans that provide guidance for the review and approval of development applications.

 

The Town has retained a consultant to assist in development of the East Precinct Plan and alternative development options.  The East Precinct Plan identifies the YMCA lands as a potential location for public activities.  The site is strategically located at a future intersection to provide architectural prominence and a focal point in the landscape.  The YMCA will be linked, via a future north-south road, with the proposed York Region District High School proposed on the Unionville Fairways site.  Since the YMCA site plan is well advanced in the approval process, it will be reflected accordingly within the Precinct Plan. 

 

The Town’s Recreation, Culture and Library Indoor Facility Master Plan identified the need for a satellite recreational facility to serve the needs and requirements of future Markham Centre residents.  With construction of the Markham Family YMCA, this satellite facility will no longer be required.  As part of the Agreement of Purchase and Sale and Facility Construction, Use and Disposition, the Town requires the YMCA to enter into a Community Access Agreement, offering Markham residents access to aquatic development programs, first aid courses, open fitness time and meeting rooms at discounted rates for Community Service Groups designated by the Town, on an equitable basis compared with Town owned community facilities.

 

Anticipated schedule for the opening of the YMCA

The official groundbreaking ceremony took place on June 14, 2004 for the new Markham Family YMCA.  The installation of municipal services is scheduled to be complete by September 2004, and construction of the YMCA building is anticipated to begin late August 2004, with an official opening anticipated in late 2005.

 

A tree inventory has been submitted for review 

The consultants for the YMCA have submitted a tree inventory for staff review.  Urban Design Staff has reviewed the Tree Preservation Plan, which indicates the species and size of existing trees on the site.  Per Town of Markham standards, a Tree Preservation Plan must be prepared by a landscape architect, in conjunction with an Arbourist.  In addition to what the plan currently indicates, it must also describe the general health and quality of the trees, the existing and proposed grade elevations at the base of the trees to be preserved, and an opinion by the Arbourist as to the retention value of the trees considering future development.  The plan should also show a detail for the tree preservation fencing which reflects Town standards.  Upon receipt of the above information, discussions regarding the appropriate layout of landscape features will be further addressed. 

 

 

Unified streetscape design for Markham Centre

As part of the urban downtown streetscape currently being designed for Markham Centre, the YMCA will be providing an upgraded urban boulevard treatment with pedestrian crossings, special features and street lighting with expanded sidewalks across the frontage of the entire site.  The YMCA will also be required to provide street trees in the municipal boulevard at a spacing of 9.0 metres on centre, as per the upgraded standard.  Future development within Markham Centre will require similar treatments to create a consistent urban street edge.

 

Under the conditions of the Purchase and Sale and Facility Construction, Use and Disposition Agreement, the YMCA may be eligible for credits under the Area Specific Development Charges By-law (ASDC) for the East Precinct for the works undertaken that are included in the approved ASDC By-law.

 

Cash in lieu of parkland is required

The contribution for parkland will be taken as cash-in-lieu of parkland dedication.  These funds will be taken as a condition of the site plan control agreement and may be refunded in accordance with the Agreement of Purchase and Sale and Facility Construction, Use and Disposition.

 

The landscape plan requires further refinement

The landscape design generally reflects the goals and principals that the Town’s Urban Design staff has set for this project.  Pending the receipt of further information with regard to the Tree Preservation Plan, further development and detailing of the landscape design will be addressed.  The plant palette, including variety and species selection, should address diversity, longevity, and appropriateness, on both a site specific scale and in the context of the surrounding environment.  Further landscaping surrounding the heritage house will be discussed and created in conjunction with the Heritage staff to ensure the programming and transitions between site amenities function as a cohesive unit. 

 

The concrete paving has been shown to have a consistent pattern throughout the landscape, and presents opportunities for detailing such as banding.  Banding can be used to emphasize entryways and pedestrian crossings. 

 

Screening for the parking lot has been included in the form of a planted berm.  The intent of the berm reflects appropriate screening.  However, staff are of the opinion that an urban form of screening, such as a combination of planting and hardscape, would be more consistent with the urban built form proposed by the YMCA.  Measures have also been undertaken to screen the hydro transformer from the street and public view by locating it in the loading area.

 

Site furnishing styles and types, including lighting and landscape signage, will be addressed further at the detailed design stage.  Site furnishings along the streetscape should reflect standards set for Markham Centre. 

 

It is the intent of the YMCA to phase the landscape construction as membership increases and financial resources become available.  The phasing of the landscape construction will be addressed in a phasing plan, which has been requested by staff.

 

The site plan, elevations and landscape plans require minor revisions

The vision for Markham Centre is to create an urban downtown with boulevards and street edges that will support a mix of commercial, residential, and institutional uses.  Through the process of refining the site plan for the Markham Family YMCA as the first public building created in partnership with the Town, and given its high profile location, staff has requested a high level of design, which complies with the intent of the Markham Centre vision.  Staff has worked in cooperation with the YMCA and their consultants (Moriyama & Teshima) to achieve significant improvements to the site design, elevations, and materials, including the following:

 

§         Aligning the main entrance to the YMCA building with the intersection of the north/south connection to Enterprise Boulevard, creating a focal point for the road and providing a prominent architectural terminus;

§         Revising internal traffic circulation to improve the possibilities for shared vehicular access arrangements between landowners in the future;

§         The building is located close to the street edge, providing opportunities for pedestrian interaction;

§         The design includes an urbanized pedestrian boulevard along “YMCA Boulevard” and the north/south internal access to the Heritage House; 

§         The colonnade ties the entire frontage of the building, providing architectural continuity, across the  façade;

§         The curtain wall glazing treatment across the front of the building provides a permeable  architectural appearance with a significant amount of visual interaction with the street;

§         The intent of the highly urbanized landscape detailing along the main pedestrian walkways is to maintain a visually harmonious streetscape.  There may be an opportunity to  establish the ultimate streetscape treatment along the north flank of the building;

§         Creating opportunities for ‘green infrastructure’ through the integration of bioswales and native plantings;

§         Materials included in the elevation consist of a durable, pre-finished cementitious panel on the upper storey and an architectural masonry product on the lower level.  Further refinements to the detailing of the building will be finalized with Urban Design staff.  

 

The consultants and YMCA will be working with staff to further refine the final detailing to the material selection prior to construction.  However, staff is generally satisfied with the site plan and elevations for the proposed Markham Family YMCA and recommends approval, subject to the minor revisions noted in this report. 

 

FINANCIAL CONSIDERATIONS:

The Town and Province have agreed to donate the required lands for the YMCA, as part of the Town’s capital contribution to the project.  Fundraising for the project has been ongoing in cooperation with the Town of Markham and the YMCA and through community fundraising efforts.  Details of the financial considerations have been brought forward in a confidential report to Committee of the Whole on June 8, 2004.  The recommendations of the report were passed by Council on June 8, 2004. 

 

Included as part of the Agreement of Purchase and Sale and Facility Construction, Use and Disposition, the Town’s primary capital contribution to the project includes providing the land to the YMCA and the waiver or refund of certain fees, charges and levies, as specified in the terms of the Agreement.  In addition, the Town is responsible for the construction of municipal services to the site.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The site plan application has been circulated to various departments and agencies for comment.  Detailed requirements of other departments and agencies will be incorporated into the conditions of site plan approval.

 

Ministry of Transportation

A letter from the Ministry of Transportation dated January 12, 2004, identifies that they have no objection to the proposed site plan application, subject to conditions.  These conditions include no access permitted to the property from Kennedy Road, between Highway 407 and Helen Avenue.  Until additional local road networks become available, all access is required to be restricted to the “YMCA Boulevard”, and all below ground structures must be set back a minimum of 14 metres (to be delineated on the site plan) from the Highway 407 Transit way limits.  Also, stormwater management reports and site servicing/site grading plans must be submitted for MTO review and approval, prior to any construction on the property, and prior to the Town of Markham issuing any building permits.

 

ENVIRONMENTAL CONSIDERATIONS:

The ORC has agreed as part of its sale agreement, to remediate any remaining contamination on the YMCA site as a result of past land use practices.  As a portion of the contamination is under the existing accessory buildings, remediation could not commence until the existing tenant vacated the lands. 

 

ACCESSIBILITY CONSIDERATIONS:

The YMCA building has facilities designed to ensure accessibility for persons with physical disabilities.  In addition to complying with Building Code requirements for accessibility, facilities such as access ramps for pools, large print signage and elevators for the two storey building have also been provided in the proposed facility.

 

ENGAGE 21ST CONSIDERATIONS:

Markham’s strategic plan envisions the Town as an award winning community leader in architectural excellence and the provision of community services.  The Markham Family YMCA supports several of the Town’s corporate goals and the Town’s Engage 21st Markham Strategic Plan. 

 

The Markham Family YMCA provides fiscal stewardship by managing and ensuring recreational and social resources are available to the residents of Markham Centre and adjacent districts in partnership with corporate and agency partners.  It provides a first class recreational facility as part of a joint venture with the YMCA and with corporate and community fundraising contributions, ensuring Town resources are managed responsibly and taxpayers receive the best facilities which are accessible by all.

 

The development also aligns with the corporate goal of infrastructure management, building and strategically managing the Town’s infrastructure to meet the demands and expectations of a growing community.  By providing infrastructure to coincide with the requirements of the expanding community, municipal services are delivered in a timely and efficient manner.

 

The Markham Family YMCA also provides a facility which promotes a quality community.  The program of the YMCA has been to continually recognize, promote and strengthen a sense of community and multiculturalism which will appeal to all ages and stages of life by providing high-quality services, “dedicated to the growth of all persons in spirit, mind and body, and in a sense of responsibility to each other and the global community.”  Welcoming the YMCA of Greater Toronto further adds to the quality community and facilities of the Town of Markham.

 

 

 

 

 

David Clark

Town Architect

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

 

 

 

 

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

 

 

DOCUMENT:

Q:\Development\Planning\APPL\SITEPLAN\03 118511 YMCA Markham\DSC June 28, 2004.doc

 

ATTACHMENTS:

Figure 1 – Location Map

Figure 2 – Area Context and Zoning

Figure 3 – Aerial Photograph

Figure 4 – Site Plan

Figure 5 – Elevation

Figure 6 – Elevation

Appendix A – Colour Elevation

 

 

APPLICANT: Jim Whitehead – General Manager of Facility Development

YMCA Association Services

42 Charles Street East

Toronto, Ontario   M4Y 1T4

Telephone:  416-413-9622   Fax:  416-413-1741

 

AGENT:                     Daniel Teramura

Moriyama & Teshima Architects

32 Davenport Road

Toronto, Ontario  M5R 1H3

Telephone:  416-924-4484   Fax:  416-925-4637

 

FIGURE 1 – Location Map