DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning & Urban Design

 

 

 

 

PREPARED BY:

Nilesh Surti, Planner ext. 4190

South District Team

 

 

 

 

DATE OF MEETING:

2004-Sep-21

 

 

 

 

SUBJECT:

Cornerstone Chinese Alliance Church, Application for Site Plan Approval to permit a place of worship at 4757 14th Avenue

 

 

 


 

RECOMMENDATION:

THAT the Development Services Commission Report entitled “Cornerstone Chinese Alliance Church, Application for Site Plan Approval to permit a place of worship at 4757 14th Avenue” be received;

 

AND THAT the Site Plan Control application (SC 04 009916) submitted by Cornerstone Chinese Alliance Church to permit a 1,908 m2 (20,538.2 ft2) place of worship at 4757 14th Avenue, be approved subject to the follow conditions:

 

  1. That final site plan and elevation drawings be submitted to the satisfaction of the Commissioner of Development Services;

 

  1. A Landscape Plan, prepared by a Landscape Architect having O.A.L.A. membership, be submitted to the satisfaction of the Commissioner of Development Services;

 

  1. The Owner shall comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Commissioner of Development Services;

 

  1. The Owner shall comply with the requirements of the applicable zoning by-law or obtain any necessary minor variances to accommodate the proposal;

 

  1. The Owner shall enter into a site plan agreement with the Town, containing all standard and special provisions and requirements of the Town and public agencies including the following:

 

a.           Provision for the payment by the Owner of all applicable fees, recoveries, development charges, parkland dedications and financial obligations related to applicable Developers Group Agreements;

 

b.          Garbage shall be stored internally to the satisfaction of the Town’s Waste Management Department;

 

c.           The Owner shall agree to implement and monitor on-site sediment and erosion control measures during construction of this development, as per “Ontario Guidelines on Erosion and Sediment Control for Urban Sites” to the satisfaction of the Director of Engineering, and

 

d.          The Owner shall install a spill control devise on this property and carry out yearly maintenance in accordance with manufacture’s recommendations.  The Owner agrees to allow the Town access to this site to conduct inspections to ensure that the spill control devise is being maintained.

 

  1. The Owner shall obtain all necessary approvals from the Regional Municipality of York (Transportation and Works Department);

 

  1. The Owner shall submit to the Engineering Department for approval, revised site servicing and grading drawings, municipal service connections details, and a revised stormwater management report, prior to the building permit stage.  Drawings are to be prepared and stamped by a Professional Engineer with a Certificate of Authorization from Professional Engineers of Ontario, and

 

  1. The site plan approval shall lapse after a period of three years commencing September 21, 2004, in the event a site plan agreement is not executed within that period.            

 

PURPOSE:

The report provides background information and recommends site plan approval, subject to conditions, for a revised proposal to permit a 1,908 m2 (20,538.2 ft2) place of worship on the south side of 14th Avenue between Brimley Road and Noble Street, at the property municipally known as 4757 14th Avenue. 

 

BACKGROUND:

Subject Property and Surrounding Uses

This 0.81 ha (2.0 acres) property is located on the south side of 14th Avenue, midway between Brimley Road and Noble Street (See Figure 1).  There is an existing single family detached home and garage on the property and the lot is well treed.  Abutting the property to the east, west, south and north, across 14th Avenue, are single family detached homes on lots of varying sizes (See Figures 2 & 3).  

 

Previous Rezoning and Site Plan applications were approved by the OMB

The original Zoning By-law Amendment and Site Plan Control applications proposed by Cornerstone Chinese Alliance Church was to permit a 2,158 m2 (23,229.2 ft2) place of worship with a total seating capacity of 520 seats.  Both applications were denied by Council on April 10, 2001, on the basis that they did not comply with the intended residential pattern of development in the area, and were subsequently appealed to the Ontario Municipal Board (OMB) by the Owner.  In December 2001, the OMB approved the zoning by-law, and rezoned the subject property from (Hold) Suburban Residential Two [(H)SUR2] to Institutional and Open Space (OS) with site specific development provisions.  The Board subsequently granted site plan approval for a place of worship with a maximum gross floor area not exceeding 1,964 m2 (21,141 ft2) in the fall of 2002.

 

Revised proposal

Since the Cornerstone Chinese Alliance Church did not submit a building permit application for the place of worship prior to the new parking by-law being enacted by Council on September 30, 2003, it was staff’s position that the approved building should comply with the new parking by-law for places of worship. To accommodate the additional on-site parking spaces, changes to the approved site plan were necessary.  The applicant has submitted a revised site plan application proposing a 1,908 m2 (20,538 ft2) place of worship with a total seating capacity of 420 seats (See Figures 4 & 5).  The following is a list of the most significant changes made to the original site plan:

 

OPTIONS/DISCUSSION:

Official Plan and Zoning

The property is designated “Urban Residential” in the Official Plan and “Urban Residential – Low Density” in the East Riseborough Secondary Plan (a non-statutory Secondary Plan).  This designation provides for the proposed use, subject to Council being satisfied that such use is compatible and serves the residential area. The subject property is currently zoned Institutional and Open Space (OS), under By-law 193-81, as amended, and the current zoning permits a place of worship and accessory uses. 

 

Subsequent to the OMB’s approval of the original rezoning and site plan applications in December 2001, the Town in 2003 adopted Official Plan Amendment (OPA No. 115), which contains specific criteria for evaluating applications for places of worship approval.  In 2003, the Town also adopted more stringent parking requirements for places of worship.

 

Given that the OMB approved the zoning by-law amendment and a similar site plan for the property, the revised proposal is being evaluated with regard to the provisions of the OMB approval zoning by-lawand the subsequent new parking requirements.

 

In addition, it should be noted that the By-law approved by the Board in 2001 called for a front yard setback of 6 metres whereas the original site plan approved by the Board in 2002 showed a front yard setback of only 4.4 metres.  The reason for the reduced front yard setback in the site plan was a road widening requirement by the Region of York after the By-law was approved. 

 

Having regard for the zoning by-law approved by the Board and to be consistent with the standard Town requirements, the applicant was requested to increase the front yard setback from 4.4 metres to 6 metres.  To compensate for the increased front yard setback the landscaping strip along the rear property line had to be reduced from the 9.62 metres in the Board approved site plan to 7.4 metres.  The reduced landscape strip still provides adequate buffering for the adjoining property to the south and does not compromise landscaping opportunities in this area.

 

Public Consultation

Staff have spoken with abutting property owners individually regarding the changes proposed by Cornerstone Chinese Alliance Church.  The residents raised concerns with respect to grading and drainage, loss of existing tree coverage, increased noise levels, and visibility of the proposed building and parking area.

 

Proposed grading and drainage will not impact abutting residents

The proposed development will match the existing grades of abutting properties.  Any existing drainage onto the subject lands from adjacent properties will be accommodated on the subject lands.  Drainage from the proposed development will be contained on-site and will be released to 14th Avenue storm sewers.  The proposal provides adequate drainage and runoff treatment to meet the Town’s drainage criteria for this site.  Engineering staff have reviewed the grading and drainage drawings and are satisfied with the plans, subject to final approval of engineering drawings.  In the opinion of staff, abutting residents will not be adversely impacted by the changes in the grades and drainage patterns.

 

Site landscaping will attempt to compensate for the loss of trees.

As noted earlier, the site is heavily treed, but has been approved by the OMB for this development.  The applicant has submitted a landscape plan, which shows all of the trees being removed, with the exception of few trees along the street line.  The applicant has indicated that due to the need to meet stormwater management and re-grading requirements the trees would have to be removed.  The applicant has agreed to plant new trees, to the Town’s satisfaction along the perimeter of the site.  Final landscape plans are to be approved and form part of the site plan agreement.

 

Concerns related to noise and visibility of the development were considered as part of original approval

Concerns were also raised with respect to noise from patrons and vehicles attending the place of worship as well as the visual impact of the proposed development.  There was considerable public input with regard to the original proposal and the OMB had concluded that the development would not have an adverse impact on the neighbours or the area.

 

It should be noted that the proposed building is generally the same height as the previously approved building.  However, the landscape strips along the side property lines have been reduced to accommodate additional parking spaces. Given the extensive regarding required to accommodate stormwater management, it is uncertain if more of the existing vegetation on the property could have been preserved under the original proposal with wider landscape strips.  Staff will require extensive landscaping along the property lines to provide buffering for the adjoining properties, to the extent feasible.  The applicant will also be required to erect a 1.8 metre (6 feet) high privacy fences adjacent to all residential properties.

 

Sufficient on-site parking has been provided

The new parking by-law requires that parking for places of worship be calculated at a rate of 1 parking space per 4 persons of the worship area capacity, or 1 parking space per every 9m2 of the net floor area of the worship area and any accessory use areas (excluding any residential uses) whichever is greater.  Based on this standard, the proposed place of worship would need a total of 145 parking spaces and the applicant has provided 145 spaces.  The proposal meets the new parking by-laws standard for on-site parking.

 

Staff are generally satisfied with site plan and elevations

The Owner’s consultant has been working closely with staff to refine the site plan and building elevations.  The proposed building is positioned close to 14th Avenue, providing a strong street related presence.  The height of the building along 14th Avenue is 10.8 metres (35 feet).  The rear portion of the building has a lower height of 6.38 metres (20.9 feet).  The exterior building materials will consist of stucco and glazing.  Staff are generally satisfied with the site layout and building elevations.

 

CONCULSION

Staff are generally satisfied with the proposal and recommend that it be approved, subject to the conditions outlined in this report.

 

FINANCIAL CONSIDERATIONS:

There are no financial impacts at this time.

 

ENVIRONMENTAL CONSIDERATIONS:

The issue with respect to the proposed tree removal at this site has been addressed in this report.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The application was circulated to all Town departments and external agencies, and their recommendations/comments have been incorporated into this report.

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

FILE PATH:     Q:\Development\Planning\APPL\SITEPLAN\SC 04 009916 Cornerstone Chinese Alliance Church\Report.doc

 

ATTACHMENTS:    Figure 1 – Location Map

                                    Figure 2 – Area Context Map

                                    Figure 3 – Air Photo

                                    Figure 4 – Site Plan

                                    Figure 5 – Elevations

 

AGENT:                     Mr. Jerry Heeringa Ltd.

                                    G.L. Heeringa Ltd.

                                    21 Leslie Drive

                                    Stoney Creek ON  L8G 3K2

                                    Tel: 1-905-662-1400, Fax: 1-905-664-4388

 

 

  Figure 1 – Location Map