DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning & Urban Design

 

 

 

 

PREPARED BY:

Markham Centre District Team

Doris Cheng, Development Planner – ext. 7922

 

 

 

 

DATE OF MEETING:

January 25, 2005

 

 

 

 

SUBJECT:

RECOMMENDATION REPORT

Centennial Community Centre Expansion

Site Plan application for 8600 McCowan Road

Concession 6, Part Lot 12 & 13

File No. SC 04-026681


 

 

RECOMMENDATION:

That the report dated January 25, 2005, entitled, “Centennial Community Centre Expansion Site Plan application for 8600 McCowan Road, Concession 6, Part Lot 12 & 13, File No. SC 04-026681” be received.

 

And further that the Site Plan for the Centennial Community Centre Expansion be approved in principle, with the finalization of technical issues and approval of final drawings to be delegated to the Commissioner of Development Services.

 

PURPOSE:

The purpose of this report is to obtain Council’s approval in principle of the site plan application for the Centennial Community Centre expansion project and to request Council to delegate the finalization of technical issues and approval of final drawings to the Commissioner of Development Services.

 

BACKGROUND:

Site description and area context

The subject lands are located at the northwest corner of McCowan Road and Bullock Drive (refer to Figure 1) within the Markham Centre District.  The lands consist of approximately 4.98 hectares (12.3 acres) and are municipally known as 8600 McCowan Road.  The site includes the Centennial Community Centre, Centennial GO Train Station and associated parking.

 

To the north of the community centre are the GO Transit rail line and a residential subdivision containing single detached dwellings.  To the south is Bullock Drive and Markville Mall.  To the west of the property are Centennial Park, the newly constructed skateboard park and single detached dwellings.  To the east are a plaza containing a Loblaws and LCBO, and a Canadian Tire with an accessory gas station (refer to Figure 2).

 

Chronology of events

On September 17, 2002, Council adopted a report that approved hiring an architect to design an expansion of Centennial Community Centre, and established an Executive Steering Committee (ESC).  The ESC met to review the project and based on the Recreation and Cultural Services Department (Recreation Services) preliminary assessment of their requirements, it was concluded that the addition would involve the design and construction of an 18,000 ft² (1,672 m²) addition, 6,500 ft² (604 m²) of renovations and a reconstructed parking lot. Additional renovations proposed include improvements to the lobby and administrative areas. 

 

As part of this process, a report from Poulos and Chung entitled ‘Centennial Community Centre Expansion Assessment of Parking Demand, On-Site Parking Supply, Access and Circulation’ was presented to the Finance and Administration Committee. This report recommended a parking lot design that would accommodate the proposed expansion.  On January 28, 2003 Council adopted a report that endorsed the parking lot design as recommended in the Poulos and Chung report, and requested staff to also review options for accommodating indoor bocce courts at the community centre. 

 

On June 22, 2004, Council approved the schematic design for a 23,185 ft² (2,154 m²) expansion and 16,150 ft² (1,500 m²) of renovations to the existing building.  Council also approved in principle, a recreational area for indoor bocce courts with an area of 11,045 ft² (1,026 m²) subject to a significant contribution from the bocce club.  The Markham Bocce Association has presented their business plan for the funding and operation of the indoor bocce courts.  The Finance and Administrative Committee received the presentation and referred the matter to staff for assessment, analysis and a report.  This report is currently being prepared by Community Services staff and will be submitted for Council’s consideration in the near future.

 

On October 25, 2004, the architects submitted a site plan application on behalf of the Capital Works – Facilities Department, for the expansion of the Centennial Community Centre.  Since the initial submission, planning and design staff has met with the consultants and project manager to review the detailed design and address the requirements of external agencies.

 

Official Plan and zoning amendments are not required

The Official Plan (revised 1987) designates these lands as Open Space on Schedule ‘A’ – Land Use.  This designation provides for conservation and outdoor recreation uses, public parks and accessory buildings, including community centres.

 

The zoning on the lands is O2 under parent by-law 184-78 as amended by by-law 163-88.  The O2 zoning category permits a variety of uses, including community centres.  Based on the designation of the Official Plan and the permissions of the zoning by-law, amendments are not required.

 

 

DISCUSSION:

The proposal will provide additional services and updated facilities

The proposed expansion to the building will include a new fitness centre with a fitness studio and change rooms; multi-purpose room/small gym for active and passive programming; renovated pool change rooms (including family change rooms) and renovations to the lobby that would improve the reception area, enhance security and provide a more customer-oriented administration area.  Provisions have also been included for an indoor bocce court. 

 

Improvements to the site include a right-in, right-out access from McCowan Road, and increasing the amount of on-site parking from 314 to 550 spaces (200 parking spaces for GO Transit, 344 parking spaces for Centennial Community Centre, and 6 accessible parking spaces).  As discussed later in this report, Staff is reviewing a request from GO Transit to provide additional parking spaces for GO Transit commuters and access improvements to the Centennial GO Train station. 

 

DISCUSSION:

The following is a brief summary of issues raised to date. These matters, and any others identified through the circulation and detailed review of the proposal will be addressed prior to final staff approval.

 

Urban Design Comments:

The existing building dates back three decades and was developed using large expanses of concrete masonry with limited glazing.  The appearance presented a less than user and pedestrian friendly presence.  The new addition incorporates the recommendations of the Town Architect and is generally satisfactory.  It integrates the older façade with more user oriented and pedestrian friendly materials featuring large expanses of curtain wall with varying degrees of transparency to respond to light infiltration and privacy requirements.  The use of split faced block helps to integrate the addition into the existing buildings.  There is a limited amount of aluminium panelling used as an accent material.  The major entrances are identified with generous glazing and their location reinforced through a glazed block feature wall that extends from the interior out into the exterior landscape.

 

The site plan also takes into consideration the need for additional parking for site users.  Through the review process, pedestrian connections, both existing and proposed have been incorporated into the site plan.  Specific issues with regard to the site plan and related required information is discussed below. 

 

The landscape plan requires finalization

A landscape plan was submitted with the original Site Plan application.  This plan will have to be revised to reflect the final, approved Site Plan.  The Urban Design department would like to see the landscape design reflect opportunities for seasonal planting, and in general a high level of quality in plantings, including grasses and ground covers, especially for the entry area.  A rich palette of both plant and paving materials should be developed for the site.  The design should also take into consideration the adjacent skatepark design.  A 6m wide landscape buffer should be maintained along the eastern property line, planted with trees and shrubs in locations where they will not interfere with vehicular and pedestrian sightlines.  The style and type of lighting in the parking lot and other landscape lighting should be indicated on the landscape plan and detail sheet if necessary.

 

Also under consideration for landscape improvements is the GO Transit parking lot.  It has been reconfigured to allow for additional parking, lot separation, and pedestrian connections.  Urban design has recommended some reconfiguration of the parking lot adjacent to the barrier between GO and community centre parking lots, and some additional landscape islands to buffer pedestrians and allow for safer circulation through the lot.  Some additional screening planting should be included in the landscape strip between the parking lot and train tracks, as there is an existing residential development adjacent to the tracks that is currently screened by a berm and grouping of mature trees.  The improvements identified above should be accommodated with moderate adjustments to the site plan.

 

Tree Inventory and Preservation

A Tree Inventory/Arborist report was submitted with the original site plan application.  It indicates the species, location and quality of each tree on the site and is to reflect the final, approved site plan.  Urban Design will request that a Tree Preservation Plan be prepared that will also indicate where tree preservation fencing is to be placed, a detail of the tree preservation fencing and notes to the contractor regarding the protection of the trees.  At a site meeting, the decision was made not to construct the proposed new parking lot that would follow the curve of Bullock Drive because it would involve the removal of 10-15 trees and considerable site work.  The parking lot will remain in its current configuration and the trees will be preserved.

 

Various engineering issues require finalization

The Town will complete a functional servicing study to confirm adequate availability of sewer capacity and watermain pressure to service the site.  All site servicing drawings, grading plans, and a storm water management brief will be required at the building permit stage. An implementation and monitoring strategy of on-site sediment and erosion control measures during construction of this development will also be required.  As part of the construction tender, the contractor for the expansion will be required to verify the location of all existing and proposed utilities within the rights-of-way as directed by the Director of Engineering. 

 

All issues must be addressed to the satisfaction of the Director of Engineering, including obtaining comments and approval from GO Transit with regard to fencing, grading, drainage and noise attenuation requirements for this property.

 

A Parking Demand, Supply, Access and Circulation Report has been reviewed

The Town of Markham retained Poulos & Chung Limited to provide an Assessment of Parking Demand, On-Site Parking Supply, Access and Circulation for the Centennial Community Centre Expansion, dated November 2002.  Town Transportation staff has reviewed the report and agree with the recommended closure of the first entrance drive located immediately west of McCowan Road.  Staff generally agrees with the proposed right-in and right-out entrance on McCowan Road, however, written confirmation will be required from York Region and York Region Transit regarding its location. 

 

 

The proposed expansion will incorporate energy efficiency and green building design

The Town of Markham is again leading by example by incorporating energy efficiency and green building design in the addition and renovation of the Centennial Community Centre.  The architects are investigating opportunities to introduce a green roof on various areas of the proposed addition.  The location and type of the greenroof, if feasible, will be indicated on the final plans.  Energy initiatives will also include:

 

§         Increased wall and roof insulation;

§         Energy efficient windows with glazing to reduce heat gain;

§         Installation of a new high efficiency heat pump to serve as the building’s main heating and cooling system;

§         Equipping electronic sensors to all low flow toilets, faucets and showers;

§         Energy efficient lighting;

 

These initiatives qualify the Centennial Community Centre for a grant from Natural Resource Canada under the Canadian Building Incentive Program. 

 

FINANCIAL CONSIDERATIONS:

Council approved funding for the project on June 22, 2004 as part of the approval of the schematic design.  The funding requirements for the project will be confirmed once the working drawings are complete and prior to tendering the project.  A detailed list of the funding requirements will be brought forward through a report to the General Committee by the Capital Works Facilities, Utilities and Construction Department.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The application has been circulated to internal departments and external agencies for comments. 

 

GO Transit has requested additional parking as part of this project

The existing shared facilities agreement with GO Transit provides for 200 dedicated parking spaces for commuters with a separate access.  In concert with this application GO Transit has expressed interest in increasing the number of parking spaces available to commuters and have indicated their willingness to pay for the cost of providing the additional parking.  The site plan application proposes to increase the total number of parking spaces available to commuters (60 spaces) and Town staff will further review this matter with GO Transit and with our traffic consultants.  GO Transit has also suggested a possible future joint venture with the Town to build a two-level parking structure.  This opportunity is being reviewed and would be subject to a separate report to Council.  Revisions to the joint facilities agreement, as well as a separate site plan application would be required.

 

The Region of York supports the application in principle

The Region of York has accepted the proposed right in/right out access from McCowan Road.  Detailed comments provided by Regional staff include referencing setbacks on the drawings and a detailed cost estimate of proposed work and landscaping.  The Region has also included notice that the Region of York Transportation and Works Department intends to reconstruct this section of McCowan Road in 2012.

 

ENVIRONMENTAL CONSIDERATIONS:

The expansion plans make provision for tree preservation opportunities, energy efficiency, and green building design as discussed in this report.

 

ACCESSIBILITY CONSIDERATIONS:

The community centre expansion has been designed to ensure accessibility for persons with physical disabilities.  In addition to complying with Building Code requirements for accessibility, improvements will include access ramps and elevators to the amenities on the second floor and improvements and expansion of the existing parking lot and traffic accessibility to the facility.

 

ENGAGE 21ST CONSIDERATIONS:

Markham’s strategic plan envisions the Town as an award winning community leader in architectural excellence and the provision of community services.  The Centennial Community Centre expansion supports several of the Town’s corporate goals and the Town’s Engage 21st Markham Strategic Plan. 

 

The Centennial Community Centre provides fiscal stewardship by managing and ensuring recreational and social resources are available to the residents of Markham.  It provides a first class recreational facility and ensures the Town’s resources are managed responsibly and taxpayers receive the best facilities which are accessible by all.

 

The development also aligns with the corporate goal of infrastructure management, building and strategically managing the Town’s infrastructure to meet the demands and expectations of a growing community.  By providing infrastructure to coincide with the requirements of the expanding community, municipal services are delivered in a timely and efficient manner.

 

The Centennial Community Centre expansion also provides a facility which promotes a quality community.  The additional amenities planned for the expansion recognizes and promotes a sense of community and multiculturalism which will appeal to all ages and stages of life by providing programs which accommodate the recreation needs of the community. 

 

CONCLUSION:

Based on the information contained within this report, staff request Committee’s approval in principle of the site plan application of the Centennial Community Centre expansion project and requests Committee to delegate the finalization of technical issues and approval of final drawings to the Commissioner of Development Services.

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

 

DOCUMENT:

Q:\Development\Planning\APPL\SITEPLAN\04 026681 Centennial Expansion\recommendation report.doc

 

ATTACHMENTS:

Figure 1 – Location Map

Figure 2 – Area Context / Zoning

Figure 3 – Aerial Photograph

Figure 4 – Site Plan

Figure 5 – Elevations

 

APPLICANT/AGENT:          Town of Markham

                                                Alan Wolfe – Project Consultant

                                                Capital Works – Facilities

                                                Utilities and Construction Department

 

                                                Oleson Worland Architects and Taylor_Smyth Architects

                                                Contact:  Mr. Gregg Adams

                                                354 Davenport Road, Suite 3B

                                                Toronto, Ontario  M5R 1K6

                                                Telephone:  416-968-6688  Fax:  416-968-7728

                                                Email:  gadams@taylorsmyth.com

 

FIGURE 1:  Location Map