TO: |
Mayor and Members of Council |
|
|
|
|
FROM: |
Jim Baird, Commissioner of Development Services Valerie Shuttleworth, Director of
Planning & Urban Design |
|
|
|
|
PREPARED BY: |
Nilesh Surti, Planner ext. 4190 South District Team |
|
|
|
|
DATE OF MEETING: |
|
|
|
|
|
SUBJECT: |
Truth Tabernacle of Markham
Inc., application for Site Plan Approval to permit a place of workship at 717
Highglen Avenue |
|
|
|
RECOMMENDATION:
THAT the Development Services
Commission Report entitled “
AND THAT the Site Plan
Control application (SC 04 027977) submitted by
1. Final site plan and elevation drawings be
submitted to the satisfaction of the Commissioner of Development Services;
2.
A Landscape Plan, prepared by a Landscape Architect having
O.A.L.A. membership, be submitted to the satisfaction of the Commissioner of
Development Services;
3. The Owner shall comply with all
requirements of the Town and authorized public agencies, to the satisfaction of
the Commissioner of Development Services;
4. The Owner shall comply with the
requirements of the applicable zoning by-law or obtain any necessary minor
variances to accommodate the proposal;
5. The Owner shall enter into a
site plan agreement with the Town, containing all standard and special
provisions and requirements of the Town and public agencies;
6. The Owner shall pay all
applicable fees, recoveries, development charges, parkland dedications, and any
financial obligations related to applicable Developers Group Agreements;
7. The Owner shall obtain all
necessary approvals from the Regional Municipality of York (Transportation and
Works Department);
8. The Owner shall enter into appropriate easement
agreements with the adjoining landowner to the south providing for a cross use and joint maintenance of a shared driveway aisle
along the mutual property line;
9. The Owner shall submit to the
Engineering Department for approval, revised site servicing and grading
drawings, municipal service connections details, and a revised stormwater
management report, prior to the building permit stage. Drawings are to be prepared and stamped by a
Professional Engineer with a Certificate of Authorization from Professional Engineers
of Ontario; and
10. The site plan approval shall lapse after a
period of three years commencing
PURPOSE:
The report provides background
information and recommends site plan approval, subject to conditions, for a
proposed place of worship on the southwest corner of
BACKGROUND:
Property
and Area Context
The subject property consists
of approximately 0.48 ha (1.19 acres) located on the southwest corner of
Abutting the
subject property to the south is a 4-storey apartment building, currently under
construction. Immediately to the west is
a vacant parcel of land intended for a neighbourhood park, and further west are
existing residences. To the north, across
The site was originally
reserved for a place of worship at the time of the approval of subdivision
19T-89126. The original 0.79ha (1.95
acres) place of worship site was reduced
with the approval of the Town, as part of the approval of the 4-storey
apartment building to the south in January, 2004.
OPTIONS/DISCUSSION:
Official Plan provides for a place of worship
The Official Plan
designates the subject property “Urban Residential”, which provides for the
proposed use. The Armadale East
Secondary Plan (PD 24-2) designates the subject property “Urban Residential-
Medium Density”, and identifies the subject site as a potential place of
worship site.
Official Plan
Amendment (OPA #115) for places of worship contains specific criteria for evaluating
applications for place of worship approval.
The criteria relevant to the subject proposal are discussed below:
1. Official Plan Amendment is required for new and expanded
places of worship sites in Urban Residential areas that have site areas greater
than 2.5 hectares.
The proposed
site for the place of worship will have an area of only 0.48 hectares; hence an
official plan amendment is not required.
2. Location criteria with respect to road
classification.
Official
Plan policies provide that where the place of worship site is located in an Urban
Residential designation, it may be located on an arterial road or
3. Ability
to effectively manage negative impacts of the proposed place of worship on the
surrounding area with regard to noise and light, traffic and parking.
The
proposed place of worship is surrounded by existing commercial uses to the
north, across
4. Ability to effectively manage any impacts of traffic
generated by the place of worship on surrounding uses.
Given the location of the place of worship is on a major collector road
with easy access to a signalized intersection, and given the nature of the
surrounding uses, significant negative impact is not expected from the traffic
generated by this place of worship, which is relatively small in size compared
to other places of worship built in recent years.
5. Can the site provide
adequate access for vehicles; is the site accessible by pedestrians; and is
there existing or future availability of public transit within short walking
distance.
The site
is proposed to be served by an access from
6 Considerations with
respect to off-street parking and internal traffic circulation.
The applicant is currently
proposing sufficient parking to satisfy the Town’s new parking requirements for
places of worship. Internal traffic
circulation has been reviewed and has been found to be acceptable.
7. A plan to provide for
off-site parking, if required for special events held at the place of worship.
The applicant has indicated
that based on the size of their existing place of worship facility and the size
of their congregation, during special events they would require approximately
77 spaces whereas a total of 104 parking spaces are proposed on-site. Parking demand for typical weekly services is
lower. In addition, the applicant has indicated
that they own two vans and provide shuttle service to many members of their
congregation. The applicant has also
indicated that, if the need arises, they have the option of expanding the
shuttle service to accommodate more parishioners with this alternative mode of
transportation, which could further reduce parking requirements.
8. Proposed landscaping
including planting, grading and screening is appropriate to complement the
proposed place of worship and surrounding uses.
The applicant has agreed to provide a
3-metre landscaping strip along
9.
The place of worship design minimizes
impacts on adjacent uses and is in keeping with the Town’s policies with
respect to visual appearance and applicable urban design guidelines.
The proposed site
design is not expected to impact adjacent uses.
The building has a base of masonry architectural block on all sides with
stucco applied above. This treatment is similar to the architectural treatment
of the shopping centre to the north of
Zoning By-law permits the place of worship
The subject
property is currently zoned Institutional and Open Space (O2) under Zoning
By-law 90-81, as amended, and the current zoning permits a place of worship and
accessory uses.
The subject lands fall within the study area of the
Markham Road Corridor Study, which was initiated in 2002 to develop an urban
design vision for the
Proposal is to permit a place of worship with typical accessory uses
The applicant has
submitted an application for site plan approval to permit a place of worship
having a total gross floor area of 1,160.2 m2 (12,488.7 ft2). The proposed place of worship will feature a
sanctuary on the ground floor with a total seating capacity of 347 seats. The
basement is intended to contain meeting rooms, nursery, general office, servery
and a multi-purpose room.
Sufficient on-site parking has been provided
The new parking
by-law requires that parking for places of worship be calculated at a rate of 1
parking space per 4 persons of the worship area capacity, or 1 parking space
per every 9m2 of the net floor area of the worship area(s) and any
accessory use areas, whichever is greater.
Based on this standard, the proposed place of worship would need a total
of 104 parking spaces and, as noted above, the applicant has provided 104
spaces. The proposal meets the new
parking by-law standard for on-site parking.
The proposed place of
worship is consistent with the vision for
The proposed development provides a
strong building presence along
Visual interest is provided
through the use of a pitched roof, which is consistent with the roofline of the
apartment building to the south, and the inclusion of a vertical spire at the
corner of the building. The exterior building material will consist of
architectural block band, roughly 4 to 5 feet from grade, around the proposed
building and stucco above the architectural block band. This treatment is similar to the shopping
centre to the north across
The proposed
development also complies with the vision in terms of building height. The proposed height of the building (calculated from the average grade
level to the mid point of the peaked roof) is approximately
two storeys. The height of the building
at its peak (excluding the cross) is 12.8 metres (42 feet), which is still
consistent with the guideline of approximately three storeys along
With respect to parking areas,
the design guidelines indicate that, whenever possible, parking should
be located to the side and rear of buildings or in below-grade parking
structures, and that access points should be consolidated as much as possible
through shared driveways to minimize disruption of the public sidewalk and to
simplify traffic access. Parking for the
proposed development is located mainly to the side and rear of the
building. The vehicular access from
Staff
are satisfied with the site layout and building
elevations.
Easements for cross use of driveway
As mentioned above, the site will share a common
driveway isle with the adjoining residential property to the south. As a result, both property owners will need
to enter into a mutual easement agreement for cross use and joint maintenance
of the shared driveway aisle. This
matter has been discussed with both property owners and they are both in
agreement. A condition of approval to
this effect is included.
CONCLUSION
Staff
are satisfied with the proposal and recommend that it be
approved, subject to the conditions outlined in this report.
FINANCIAL CONSIDERATIONS:
There are no financial impacts
to the Town in this report.
ACCESSIBILITY CONSIDERATIONS:
The site plan shows a total of
five handicap parking spaces all located close to the main entrance of the
building. In addition, barrier free
pedestrian connects leading from the main entrance on the south side of the
building to
ENVIRONMENTAL CONSIDERATIONS:
There are no environmental issues
to be considered in this report.
BUSINESS UNITS CONSULTED AND AFFECTED:
The application was circulated
to all Town departments and external agencies, and their
recommendations/comments have been incorporated into this report.
|
|
|
Valerie
Shuttleworth, M.C.I.P., R.P.P. Director
of Planning & Urban Design |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner
of Development Services |
FILE PATH: Q:\Development\Planning\APPL\SITEPLAN\04 027977 Truth
Tabernacle of Markham\DSC Report.doc
ATTACHMENTS: Figure 1 – Location Map
Figure
2 – Area Context and Zoning
Figure
3 – Air Photo
Figure
4 – Site Plan
Figure
5 – Elevations
AGENT:
J.
David MacAuley Architect Inc.
Tel:
1-519-823-2441
Fax:
1-519-821-8140
Figure 1