RECOMMENDATION:
That
the report entitled ‘Load Restriction Exemption – 19th Avenue’ be
received.
And
that the request for exemption to the Town’s Load Restriction By-law # 2005-24
be denied.
PURPOSE:
This report has been prepared for Committee and Council at the request
of Lebovic Enterprises and Fieldgate Developments for a temporary load
restriction exemption for 19th
Avenue between the 9th
Line and Reesor Road for a period of 3 months ending on or before October 30th, 2005. The requested exemption is being
proposed to facilitate the transfer of earth fill material from development
sites on Reesor Road to a site on the 9th Line, all located within the municipal
boundaries of the Town of Whitchurch-Stouffville.
BACKGROUND:
The Operations Department has received a request from Sernas Associates,
on behalf of Lebovic Enterprises and Fieldgate Developments, for the temporary
relief from the load restrictions on Reesor Road,
from 19th Avenue to the Markham Town limits, and 19th
Avenue, from Reesor Road to
9th line.
The development sites requiring both the removal and placement of earth
fill are all located within the Town of Whitchurch Stouffville, immediately north of the Markham Town Line. Development staff at Whitchurch Stouffville
has expressed concern with respect to the options available to transport the
earth fill over their Town’s road network.
The first option involves travelling north from the development sites on
Reesor Road and directing loaded dump trucks west across Main Street through
the downtown core of Stouffville. The
second option would be for the trucks to continue north on the 10th
Line to Bethesda Sideroad, then west on Bethesda to 9th Line, and then south on 9th
Line to the fill site. The concern with
this second option is the close proximity of two elementary schools to the 9th
Line north of Main Street and the interaction of dump trucks and school children within the urban
area.
OPTIONS/DISCUSSION:
The
Town of Whitchurch Stouffville has suggested that representatives for the Developers approach the Town
of Markham to consider a proposal to utilize Reesor Road and
19th Avenue as the transportation route for the movement of the surplus earth fill.
The
following details outline the Developers proposal for the movement of surplus
fill.
Total
volume 190,000 m³
Total
loads 25,000
Trip
Generation 40 loads/hour (80
‘trips’ per hour)
Working
Hours 7:00 a.m. to 6:00 p.m.
Monday to Friday
Time
to Complete 3 months
Impact
on area residents:
There
are 5 homes located on the section of 19th Avenue between Reesor
Road and 9th Line, as
well as 2 on the 9th Line and 3 on Reesor Road
within the proposed route. The Developers
have already approached some of the homeowners that will be directly impacted
by this proposal, but it is likely that there may be considerable objection to
the increased volume of truck traffic over the proposed 3 month period.
Impact
on roads infrastructure
Reesor Road is
a surface treated road designed to handle traffic volumes of less than 2000
AADT. 19th Avenue, between Reesor
Road and Region Road 30, is
currently a gravel surface road that is scheduled for base repair and placement
of surface treatment in 2006 at an estimated cost of approximately $225,000. Both Reesor Road and
19th Avenue are restricted to half loads (i.e. 5 tonnes per axle) on a year around
basis, to protect both the surface and road base from excessive loading from
heavy vehicles.
The
Developers’ proposal to move 25,000 loads of material would have a significant
adverse impact on both the surface and base conditions of both of these roads.
Continuous
maintenance of 19th Avenue
As
previously noted, 19th
Avenue is currently a
gravel road surface between Reesor
Road and 9th
Line. The proposed increase in vehicle
loading and traffic volumes would require enhanced maintenance of this section
of road throughout the duration of this project to control rutting, potholes
and dust suppression.
FINANCIAL
CONSIDERATIONS:
Should
Council consider approval of the proposed exemptions to the Town’s Load
Restriction By-law # 2005-24, a detailed list of conditions, including
financial implications, has been provided in Attachment ‘C’ of this report.
ATTACHMENTS:
Attachment ‘A’ – Area map
Attachment ‘B’ – Request for Exemption from Load Restrictions – Sernas
Associates
Attachment ‘C’ – Conditions of approval for the proposed By-law
exemption
|
|
|
Peter Loukes, P.Eng.
Director, Operations and Asset Management
|
|
|
|
|
|
Jim Sales
Commissioner, Community and Fire Services
|
|
Jim Baird
Commissioner, Development Services
|
|
|
|
|
Q:\Commission
Share\Operations and Asset Management\Reports\2005\Operations\Roads\Load
Restriction Exemption - 19th Avenue .doc
ATTACHMENT ‘C’
Conditions of Approval for
the proposed exemption to the Load
Restriction By-law # 2005-24
- Lebovic Enterprises and
Fieldgate Developments enter into a joint Developers Agreement with the
Town that will cover all terms and conditions for the approval of the
temporary exemption to the Load Restriction By-law.
- Submission of liability
insurance naming the Town of Markham
in the amount of $5 million to the satisfaction of the Town Solicitor.
- Reduction of the speed
limit on 19th Avenue from 60 km to 50 km from July 4, 2005 to September 30, 2005.
- Implementation of a
speed monitoring program to the satisfaction of the General Manager of
Operations
- Further discussion with
the 19th
Avenue
residents as to mitigating concerns they may have.
- The Developers are
required to pay a total of $170,000 towards the rehabilitation of the
sections of both Reesor Road
and 19th
Avenue
that will be impacted by this project.
- The
Developers deposit with the Town a Letter of Credit in the amount of
$50,000 as security against their commitment to maintain this section of
road.
- The
Developers are held responsible to maintain this section of road at all
times to the satisfaction of the General Manager of Operations including
but not limited to dust control.
- The hours of operations
will be restricted to 7:00 a.m. to 6:00 p.m. Monday to Friday.
- The temporary By-law
exemption will not exceed 3 months duration and must end on or before September 30th,
2005.
- The trip generation for
the movement of surplus earth fill is restricted to a maximum 30
loads/hour throughout the duration of the project.
- The Developers provide
written notification to all area residents directly impacted by this
proposal. The Developer will be
required to include contact names and phone numbers to the area residents
and to have an individual available to respond to all resident’s
complaints or concerns throughout the duration of this project.
- A $10,000
administration fee.
- The Town of Markham
retains the right to terminate this agreement at any time should the
Developers or their agents fail to comply with the agreed to terms and
conditions.