DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning & Urban Design

 

 

 

 

PREPARED BY:

Scott Heaslip, Coordinator, East Development District

 

 

 

 

DATE OF MEETING:

June 21, 2005

 

 

 

 

SUBJECT:

RECOMMENDATION REPORT

Lindvest Properties (Cornell) Limited ( H and R Developments)

Proposed residential plan of subdivision

19TM-02001 (Phase 2)

Cornell Planning District

SU.02 100376

ZA.02 100353

 

 

 

 


 

 

RECOMMENDATION:

That the record of the Public Meetings held on June 4, 2002 and on January 20, 2004 with respect to the applications by Lindvest Properties (Cornell) Limited for the second phase of draft plan of subdivision 19TM-02001 and implementing zoning by-law be received;

 

That Lindvest Properties (Cornell) Limited be granted a servicing allocation of 270 units, such allocation to be from the total allocation available for the Cornell Secondary Plan area, contingent on York Region confirming its acceptance of Markham’s proposed flow control option, as discussed in the February 15, 2005 report on servicing allocation from the Director of Engineering and the Director of Planning and Urban Design (hereafter referred to as the “flow control option”);

 

That the applicant agree to pay their proportionate share of the Hwy. 48 flow control measures, to the satisfaction of the Director of Engineering.

 

That the conditions of draft approval for the second phase of draft plan of subdivision 19TM-02001 (Appendix ‘A’, attached to the staff report dated June 21, 2005) be endorsed by Council and that final approval be delegated to the Commissioner of Development Services, with such final approval to occur when the Region confirms its acceptance of the flow control option;

 

That the application to amend Zoning By-laws 304-87 and 177-96 for the second phase of draft plan of subdivision 19TM-02001 be approved, and the draft by-laws, attached as Appendix ‘B’, be brought forward to Council for approval once the Region confirms its acceptance of the flow control option;

-and further-

 

That the Town reserves the right to revoke or reallocate the water supply allocation should the development not proceed in a timely manner;

 

And that the Region of York be advised of the sewage and water supply allocation for this development.

 

PURPOSE:

The purpose of this report is to recommend approval of conditions of draft approval and of implementing zoning for a 270 unit second phase of the H and R’s Grand Cornell development, subject to the York Region confirming its acceptance of Markham’s proposed flow control option, as discussed in the February 15, 2005 report on servicing allocation from the Director of Engineering and the Director of Planning and Urban Design.

 

 

BACKGROUND:

 

Property and Area Context

The subject lands have an area of 11.53 hectares (28.5 acres) and are located south of Highway 7 and east of 9th Line in the Cornell community (see Figure 1).  The lands are vacant and contain no significant vegetation or other environmental features.

 

The lands are bounded on all sides by the recently registered first phase of draft plan of subdivision 19TM-02001.         The surrounding first phase lands comprise a total of 326 single detached, semi-detached and townhouse units to the north,  stormwater management ponds and associated channels and a noise attenuation berm adjoining Highway 407 to the south and east, and a section of the Golden Jubilee Greenway to the west.  Servicing of the first phase has been completed and house construction has commenced.

 

Further to the west, across 9th Line, are existing homes fronting on Senator Reesor’s Drive and Delmark Boulevard and backing onto 9th Line. 

 

 

 

 

 

 

 

 

 

 

 

 

Proposal

 

The applicant has submitted a draft plan of subdivision (see Figure 3) for the second phase of draft plan of subdivision 19TM-02001, comprising 270 grade related residential units, all served by a rear lane, as follows:

 

 

 

No. of Units

Hectares

Acres

 

  Gross Site Area

 

  Roads

 

  Net Site Area

 

 

 

11.5

 

3.6

 

8.0

 

28.5

 

8.8

 

19.7

Single Family Units

  8.0 metre frontage, 32 metre depth

  9.15 metre frontage, 32 metre depth

11.0 metre frontage, 32 metre depth

 

Semi-detached Units

 

Townhouse Units

 

Total Units

 

69

61

69

 

20

 

51

 

270

 

 

 

 

Net Density (units per hectare/acre            in relation to net site area)

 

 

 

33.8

 

13.7

 

 

All of the associated parks, open space blocks, greenway blocks and stormwater management blocks were conveyed to the Town through registration of Phase 1. 

 

Official Plan and Zoning By-law

The subject lands are designated “Urban Residential” in the Official Plan and “Neighbourhood General” in the Cornell Secondary Plan. 

 

By-law 304-87 currently zones the lands Agricultural One (A1).

 

 

DISCUSSION

 

Plan is consistent with the principles of New Urbanism and conforms with the Cornell Secondary Plan

The proposed draft plan of subdivision is consistent with the principles of New Urbanism and provides the basis for a fully lane-based community that is compact, pedestrian-oriented and transit-supportive.

 

Plan will complete development in the vicinity

The Phase 2 lands are entirely surrounded by the Phase 1 area.  All of the potential construction routes into Phase 2 area would pass through Phase 1.  Approval of the proposed draft plan will facilitate the early completion of the entire neighbourhood south of Highway 7 and will avoid the future disturbance of Phase 1 residents by construction activity.  

 

Issues raised at the Public Meeting have been addressed

A Public meeting was held on June 4, 2002 to consider the overall plan (Phases 1 and 2). A further public meeting was held on January 20, 2004 to consider the current plan for Phase 2.  At the January 20, 2004 meeting, residents from the community to the west of 9th Line expressed concern that the plan for Phase 2 showed townhouses facing onto 9th Line.  The applicant subsequently met with the residents and agreed to revise the plan to substitute semi-detached units for townhouses along the 9th Line frontage.  The semi detached units will be designed to give the appearance of large single detached dwellings, when viewed from 9th Line. 

 

Final approval conditional on Regional acceptance of Markham’s flow control option

Approval of the proposed subdivision is conditional on the York Region confirming its acceptance of Markham’s proposed flow control option, as discussed in the February 15, 2005 report on Servicing Allocation from the Director of Engineering and the Director of Planning and Urban Design.  Staff recommend that Council endorse the implementing zoning by-law and conditions of draft approval for this subdivision and authorize the Commissioner of Development Services to bring the implementing zoning by-laws forward to Council for adoption and  issue final draft plan approval once the Region confirms its acceptance of the flow control option.  Recommended conditions of draft approval and implementing zoning by-laws are attached as Appendices “A” and  “B”.   The use permissions and development standards included in the implementing  zoning by-laws are consistent with those for the adjacent Phase 1 subdivision.

 

FINANCIAL CONSIDERATIONS:

No financial implications at this time.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The proposed draft plan has been reviewed by Town Departments and external agencies.  Department/agency requirements have been incorporated in the plan, conditions of draft approval and implementing zoning by-law as required.

 

ATTACHMENTS:

Figure 1 - Applicant/Agent & Location Map

Figure 2 - Area Context/Zoning

Figure 3 – Proposed Draft Plan of Subdivision

Figure 4 – Air Photo

 

 

Appendix ‘A’  -  Recommended conditions of draft approval

Appendix ‘B’  -  Draft by-law amendments

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

DOCUMENT:             Q:\Development\Planning\APPL\CORNELL\PH4\Final Subdivision Report June 2005.doc

 

 

 

APPLICANT/AGENT:            Daniel Leeming                                     Tel. (416) 975-1556

                                                The Planning Partnership                       Fax. (416) 975-1580

                                                1255 Bay Street, Unit 201

                                                Toronto, Ontario

                                                M5R 2A9

 

LOCATION MAP: