DEVELOPMENT SERVICES COMMITTEE

 

 

 

 

 

TO:

Mayor and Members of Council

 

 

 

 

FROM:

Jim Baird, Commissioner of Development Services

Valerie Shuttleworth, Director of Planning and Urban Design

 

 

 

 

PREPARED BY:

Markham Centre Team

 

 

 

 

DATE OF MEETING:

June 21, 2005

 

 

 

 

SUBJECT:

RECOMMENDATION REPORT

Stringbridge Investments Limited

Times Investments Limited

By-law Amendment and Precinct Plan

Southwest Corner of Highway 7 and South Town Centre Boulevard

ZA 04-024490

 


 

RECOMMENDATION:

 

That the staff report entitled “Recommendation Report, Stringbridge Investments Limited, Times Investments Limited, By-law Amendment and Precinct Plan, Southwest Corner of Highway 7 and South Town Centre Boulevard, (File number ZA 04-024490)” be received;

That the revised Precinct Plan for the 7.12 hectare (17.6 acre) Stringbridge Investments Limited and Times Investment Land Holdings be approved;

That Appendix I to the Central Area Secondary Plan (OPA 21) be amended to reflect the changes in the Warden West Development Phasing Plan;

That the zoning By-law amendment application (ZA 04-024490) to remove the lands from By-law 177-96, as amended, and to add them to Bylaw 2004-196, as amended submitted by Stringbridge Investments Limited and Times Investments Limited, attached as Appendix ‘A’ to the staff report, be finalized and enacted;

And that the Traffic and Transportation study be finalized to the satisfaction of the Commissioner of Development Services.

PURPOSE:

The purpose of this report is to provide recommendations about a proposed Zoning By-law amendment for the 7.12 hectare (17.6 acre) Stringbridge land holding.  The amendment would better reflect the Town’s and Region’s long-term vision for development of the land.

This report concludes that the revisions to the Precinct Plan are in keeping with the refined vision of Markham Centre and should be endorsed by Council and that the proposed changes to the zoning by-law are appropriate and will implement the Precinct Plan.

BACKGROUND

Location and Site Characteristics

The property is located on the west side of South Town Centre Boulevard, south of Highway 7 north of Clegg Road.  (See Figures 1 and 2.)  The site is generally flat, without any significant vegetation.  (See Figure 3 – Aerial photo.)  The surrounding lands are comprised of undeveloped lands, lands with buildings being constructed and existing office and low rise industrial development.  To the east is the future Liberty high-rise residential/mixed use project.  To the north, across Highway 7, is the Tenstone Developments (Tridel) high-rise residential/mixed use project.  To the south is existing low rise industrial development and to the west is the existing Hydro One office building.

 

There are two 1.5 storey office/warehouse buildings on the south-west corner of the property.  These buildings were constructed in 2002.  They are identified as buildings 8 and 9 on the Precinct Plan.  (See Figure 4.)

 

A consent application (B/47/03) to create one new 1.46 ha (3.6 acre) parcel (Times) and retain a 5.66 ha (13.99 acre) parcel (Stringbridge) was approved in February 2005.  The owner has one year from the date of approval to clear the conditions.

 

Proposal

 

Stringbridge and Times Investments have proposed a mixed use project.  The Precinct Plan proposal includes commercial buildings along the Highway 7 frontage including at the north-east corner of the site (Stringbridge) and a residential component at the south-east corner of the site (Times).  The two existing one-storey warehouse buildings at the south-west corner of the site will remain. (See Figure 4.)

 

The Stringbridge portion of the proposal is comprised of five new commercial buildings.  The buildings would be located along the Highway 7 street frontage and the Highway 7 and South Town Centre Boulevard intersection.  The buildings will range from 2 to 10 stories in height.  The net effect is to increase the density from 1.0 FSI to 2.5 FSI.

 

Times Investments’ is proposing to develop a 1.46 ha. (3.6 acre) portion of the south-east corner of the property.  The Times’ proposal is comprised of two residential high-rise towers.  A 12 storey tower, with ground floor retail, will front onto South Town Centre Boulevard and a 10 storey tower, will front onto Clegg Road.  These two towers would be linked, at the corner, by a building varying from 3 to 6 stories.  This will be the subject of a separate site plan report upon resolution of developers group agreement, servicing capacity and allocation issues.

 

The existing zoning permits condominium apartment dwellings.  However, the residential density proposed by Times was not contemplated when the previous approvals where granted at the end of 2000.  Consequently, the Precinct Plan needs to be refined and the zoning By-law amended to reflect these revisions.

 
A revised Precinct Plan was presented to Development Services Committee at the November 23, 2004 Public Meeting
Stringbridge submitted a revised Precinct Plan, which was presented to Development Services Committee at the November 23, 2004 Public Meeting.  (See Figure 4.)  Development Services Committee generally supported the proposed modifications to the Precinct Plan, including the proposed density increases.

 

The proposal is consistent with the Official Plan and Secondary Plan

The Official Plan designates the lands “Commercial - Community Amenity Area”, which provides for a diverse range of mixed uses.

 

The Secondary Plan (OPA 21) designates the lands “Community Amenity Area - Major Urban Place”.  This designation calls for the lands to develop with a high concentration and intensity of residential, commercial, employment and supporting uses.  In December 2000, the Town adopted a site specific Official Plan Amendment (OPA 81), which permits the industrial uses in the south-west corner of the property and provides that a long term principle for development of the lands is to create road connections between Highway 7 and Clegg Road.

 

The revised Precinct Plan is consistent with the Official Plan, Secondary Plan (OPA 21) and site specific amendment - OPA 81.  However, approval of the revised Precinct Plan will necessitate updating Appendix I to the Secondary Plan (OPA 21) to reflect the changes in the Warden West Development Phasing Plan.

 

Revised Development Phasing Plan is being finalized

The Phasing Plan contains projected development statistics for Markham Centre by District.  In accordance with the requirements of the Secondary Plan the landowners have submitted an update to the Phasing Plan to incorporate the residential proposal and the increases to the FSI.  The District Development Phasing Plan document is being finalized with the Transportation Department.  The refinements to the Phasing Plan will be completed to the satisfaction of the Commissioner of Development Services.  Staff will continue to monitor development approvals in the area and will update Appendix I to the Secondary Plan (OPA 21).

 

The proposed changes to the Precinct Plan will have a positive impact on the employment targets in the Development Phasing Plan

The Stringbridge/Times development proposal will provide additional employment and retail floor area.  The applicant has provided a revised Precinct Plan (Figure 4). Some of the key elements of the revised Precinct Plan are:

 

  • Mix of Commercial and Residential Land Uses  -  The residential uses will only be permitted on the 1.46 ha (3.6 acre) Times parcel, located at the south-east corner of the site.  The proposed zoning By-law reflects this.
  • Increased FSI from 1.0 to 2.0, as of right.  This would have the effect of increasing the employment floor area target by approximately 65,700 m2 (707,212 sq. ft.) (See Table 1 below.)
  • Allowing for an additional increase to the FSI from 2.0 to 2.5, subject to the submission of a satisfactory traffic study.  A Holding provision, linked to the traffic study, will be applied to the zone category.  This would have the effect of increasing the employment target by an additional 28,300 m2 (304,628 sq. ft.).  (See Table 1 below.)
  • Transitioning building height away from the corner of Highway 7 and South Town Centre Boulevard along the South Town Centre Boulevard frontage and west along the Highway 7 frontage.  The commercial building at the corner of Highway 7 and South Town Centre Boulevard is proposed to be a minimum of 10 storeys and a maximum of 13 stories.  All buildings fronting onto Highway 7 would be a minimum of 4 storeys.
  • Introducing an improved publicly accessible connection between Highway 7 and Clegg Road.

 

Table 1 compares the approved targets (revised in May 2002) to the revised targets, including the newest targets proposed for the Liberty development on the east side of South Town Centre Boulevard.

 

Table 1

Warden West District Targets

 

Warden West District (as revised)

Revised to include Liberty & Stringbridge

Target Residential Units

350 high density units

2,188 high density units

Target Population @ 2ppu

700 persons

4,376 persons

Schools

None

None

Target Retail

1,500 m2

6,602 m2

Target Employment

322,200 m2

 

394,250 m2 (2x FSI)

to

422,550 m2 (2.5x FSI)

 

 

The approved Precinct Plan (Figure 4) was appropriate in 2000.  However, the vision for Markham Centre has advanced considerably since then and the need to support transit through increased development densities along transit corridors has become more crucial for the success of Markham Centre and the Highway 7 corridor.  Consequently, integrating the proposed residential use into the development and increasing the density potential for the balance of the site, is considered beneficial.  The increased density and mixed use on the site would comply with the Markham Centre Secondary Plan (OPA 21), as amended and the Region’s Centres and Corridors and public transit initiatives.

 

 

 

The Quick Start transit program begins in the fall of 2005

The site will be well served by the Quick Start transit program, which will begin in the fall of 2005.  There are transit stops on the south side of Highway 7 and on the east side of South Town Centre Boulevard.  Consequently, the site will be well served by transit in both the short and long term.

 

A Zoning By-law amendment is required to implement the Precinct Plan

The property is currently zoned Community Amenity Two (CA2*80(H)) Zone by By-law 177-96, as amended by 2001-5 and is subject to a Hold provision.  Staff are recommending that the property be removed from parent By-law 177-96, as amended and added to By-law 2004-196, as amended, (the Markham Centre By-law). 
 
The Stringbridge lands, the commercial portion of the site, will be zoned Markham Centre Downtown One (MC-D1) and the Times lands, the residential portion of the site, will be zoned Markham Centre Downtown Two (MC-D2). The new zoning will also be subject to Holding (H) provisions.

 

The Holding provisions appended to the primary zone category will ensure that the issues identified in the September 21, 2005 Preliminary Report are finalized to the satisfaction of the Town.  It is intended that the Hold provisions be removed from each site when the site specific development applications are processed.  The conditions to remove the Hold include site plan approval, the execution of required agreements and the submission of all supporting studies, to the satisfaction of the Town.

 

The existing zoning includes a maximum FSI of 1.0, which is based on an earlier commercial development concept.  However, approval of the Times Investments’ residential project will use most of the entire allowable density.  If the maximum FSI remains at 1.0 the size of the buildings proposed along the Highway 7 frontage would be reduced.  The proposed amendments to the zoning By-law include:

·        Increasing the maximum permitted FSI from 1.0 to 2.0, as of right;

·        Incorporating permissions to increase the FSI from 2.0 to 2.5, subject to the removal of a Holding provision.  The conditions for removal of the Holding provision would include submission of a Traffic and Transportation study to the satisfaction of the Commissioner of Development Services;

·        Adjusting the minimum building height provisions;

·        Adjusting the required locations of the “main walls” facing Highway 7 and facing the intersection of Highway 7 and South Town Centre Boulevard;

·        Adjustments to the minimum required width of landscaping areas; and

·        Modifications to the parking standards.

 

Servicing allocation

Final approval of the residential portion of the proposal (Times) is contingent on allocation of servicing capacity.  Allocation also needs to be confirmed through the Markham Centre Developer’s Group.  The proposed Holding provision in the zoning By-law will contain, amongst other conditions, a requirement that servicing allocation has been granted prior to the Hold being removed.

 

Parkland dedication

Parkland requirements will be addressed with the approval of the individual site plans as the applications are approved.  Each site plan agreement will contain conditions regarding the dedication of parkland and/or cash-in-lieu of parkland.  Staff anticipate that cash-in-lieu of parkland will be paid to the Markham Centre Developers Group, in accordance with the standards of OPA 21 and the administrative requirements of the Markham Centre Parkland Strategy.

 

Studies will be required

The applicant has been advised that supporting studies are required for this proposal in accordance with the provisions of the Secondary Plan (OPA 21).  Staff will identify the studies required through the circulation of each site plan application to Town departments and external agencies.  The owner will be required to submit studies to the satisfaction of the Town prior to completion of any recommendation report on the individual site plan applications and the removal of the Holding provisions from the zoning By-law.

 

These studies may include: traffic/transportation, noise, servicing, tree assessment, and shadow studies in accordance with the requirements of the Secondary Plan (OPA 21).  The applicants will also have to demonstrate how the Markham Centre Guiding Principles and Performance Measures and other green infrastructure initiatives have been incorporated into their plans.

 

Traffic and transportation circulation and studies

The Town is in receipt of an overall Traffic study for the Stringbridge/Times proposal.  The traffic study is generally acceptable and staff are continuing to work with the owner to refine some of the details in the report before it is approved.

 

The Precinct Plan proposal includes two access driveways from/to Highway 7.  The first is approximately 100 metres (328 feet) west of South Town Centre Boulevard and the second approximately 320 metres (1,049 feet) west of South Town Centre Boulevard.  The second driveway is proposed to align with Circa Boulevard on the north side of Highway 7.  These driveways connecting from/to Highway 7 will be restricted to right-in/right-out movements only.  Additional access to the site will be provided from Clegg Road and South Town Centre Boulevard.  The driveway connection to South Town Centre Boulevard will align with the proposed Liberty development driveway on the east side of South Town Centre Boulevard.

 

Need for public roads and signalization at Circa Boulevard

Town staff have concluded that the Highway 7 and Circa Boulevard intersection, opposite the west entrance to the site, should be signalized.  Staff will work with the owner and York Region staff to implement the installation of these traffic lights, which will help facilitate staff’s desire to achieve a public road connection between Highway 7 and Clegg Road.  A public road opposite Circa Boulevard, connecting to Clegg Road, could help to ensure full turn movements at this Highway 7 intersection. 

 

Unfortunately the two existing buildings on the site preclude a direct connection between Highway 7 and Clegg Road as well, the owners are not yet convinced of the need for public roads.  However, staff remain of the opinion that the Precinct Plan is appropriate and can be supported at this time. Staff will again pursue possible dedication of public road connections and/or access opportunities, with the owner, as individual site plan and consent applications are submitted.  (See “Desired Public Roads” note on Figure 4).

 

 

Developer’ Group Agreement

The owners will be required to enter into a Developer’s Group Agreement, in accordance with the requirements of OPA 21 prior to final approval of developments, and prior to servicing allocation.

 

Markham Centre Advisory

The revised Precinct Plan and Times Site Plan were presented by the applicants to the Markham Centre Advisory Committee in December 2004 for discussion and review as part of the Markham Centre application review process.  The Advisory Committee assigned a Silver rating to the Precinct Plan for Built Form, Transportation, and Green Infrastructure and commented that the Open Spaces required further refinement.  Staff will work to enhance the Open Space areas, particularly along the sidewalks by the road and through parking areas as the individual site plan applications are submitted.

 

FINANCIAL CONSIDERATIONS:

The Town is currently undertaking a financial study to examine potential financial implementation tools for Markham Centre. A variety of strategies are being reviewed including designating Markham Centre as a community improvement district, and requesting Provincial authorization for Tax Increment Financing. The applicant will be required, as a condition of final approval, to support these initiatives, or others, to assist in advancing the infrastructure requirements for Markham Centre and achieving a superior level of built form, urban design and public spaces for Markham Centre.

 

ENVIRONMENTAL CONSIDERATIONS:

The individual site plan applicants must demonstrate how they have incorporated the Performance Measures into their plans and have used green initiatives in development of their proposal.

 

ACCESSIBILITY CONSIDERATIONS:

Any applicable accessibility issues will be examined in the course of the review and reported upon in the recommendation reports for the individual site plan applications as they are submitted to the Town for review and approval.

 

ENGAGE 21ST CONSIDERATIONS:

The proposal aligns with the following key Town of Markham Corporate Goals: Managed Growth, Quality Community and Infrastructure Management.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The applications have been circulated to internal departments and external agencies for comments condition and requirements will be incorporated into the final report.

 

 

 

 

 

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning and Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

DOCUMENT: Q:\Development\Planning\APPL\ZONING\04 024490 Stringbridge\Stringbridge recomendation report (draft 5).doc

 

ATTACHMENTS:          

              Figure 1 – Location Map

              Figure 2 – Area Context and Zoning

              Figure 3 – Aerial Photo

              Figure 4 – Proposed Precinct Plan

             

              Appendix ‘A’ – Draft Zoning By-law

 

 

 

 

OWNER:                 Stringbridge Investments Limited

                                 3625 Dufferin Street

                                 Downsview, ON   M3K 1N4

                                 Attention: Brian Seath

 

APPLICANTS:       Life Construction Inc.

                                  Hashem Ghadaki

                                 330 Highway 7

                                 Richmond Hill, ON  L4B 3P8

                                 Attention: Hashem Ghadaki

 

AGENTS:                Macaulay Shiomi Howson Ltd.

                                 293 Eglinton Avenue East

                                 Toronto, ON  M4P 1L3

                                 Attention: Elizabeth Howson

 

                                 KLM Planning Partners (for Hashem Ghadaki)

                                 64 Jardin Drive

                                 Concord, ON  L4K 3P3

                                 Attention: Sandra Wiles

 


 

         

                             FIGURE 1 - LOCATION MAP: