RECOMMENDATION REPORT Stringbridge Investments Limited
Times Investments
Limited By-law Amendment and Precinct Plan Southwest Corner of Highway 7 and ZA 04-024490 |
RECOMMENDATION:
That the revised Precinct Plan for the 7.12 hectare (17.6 acre) Stringbridge Investments Limited and Times Investment Land Holdings be approved;
That Appendix I to the Central Area Secondary Plan (OPA 21) be amended to reflect the changes in the Warden West Development Phasing Plan;
That the zoning By-law amendment application (ZA 04-024490) to remove the lands from By-law 177-96, as amended, and to add them to Bylaw 2004-196, as amended submitted by Stringbridge Investments Limited and Times Investments Limited, attached as Appendix ‘A’ to the staff report, be finalized and enacted;
And that the Traffic and Transportation study be finalized
to the satisfaction of the Commissioner of Development Services.
PURPOSE:
The purpose of this report
is to provide recommendations about a proposed Zoning By-law amendment for the
7.12 hectare (17.6 acre) Stringbridge land holding. The amendment would better reflect the Town’s
and Region’s long-term vision for development of the land.
This report concludes that the
revisions to the Precinct Plan are in keeping with the refined vision of
Markham Centre and should be endorsed by Council and that the proposed changes
to the zoning by-law are appropriate and will implement the Precinct Plan.
BACKGROUND
The property is located on the west side of
There are two 1.5 storey office/warehouse
buildings on the south-west corner of the property. These buildings were constructed in 2002. They are identified as buildings 8 and 9 on
the Precinct Plan. (See
Figure 4.)
A consent application (B/47/03) to create one
new 1.46 ha (3.6 acre) parcel (Times) and retain a 5.66 ha (13.99 acre) parcel
(Stringbridge) was approved in February 2005. The owner has one year from the date of
approval to clear the conditions.
Proposal
Stringbridge
and Times Investments have proposed a mixed use project. The Precinct Plan proposal includes commercial
buildings along the Highway 7 frontage including at the north-east corner of the
site (Stringbridge) and a residential component at the south-east corner of the
site (Times). The two existing
one-storey warehouse buildings at the south-west corner of the site will
remain. (See Figure 4.)
The
Stringbridge portion of the proposal is comprised of five new commercial
buildings. The buildings would be
located along the Highway 7 street frontage and the Highway 7 and
Times
Investments’ is proposing to develop a 1.46 ha. (3.6 acre)
portion of the south-east corner of the property. The Times’ proposal is comprised of two residential
high-rise towers. A 12 storey tower,
with ground floor retail, will front onto
The
existing zoning permits condominium apartment dwellings. However, the residential density proposed by
Times was not contemplated when the previous approvals where granted at the end
of 2000. Consequently, the Precinct Plan
needs to be refined and the zoning By-law amended to reflect these revisions.
The Official Plan designates the lands “Commercial -
Community Amenity Area”, which provides for a diverse range of mixed uses.
The Secondary Plan (OPA 21) designates the lands
“Community Amenity Area -
The revised
Precinct Plan is consistent with the Official Plan, Secondary Plan (OPA 21) and
site specific amendment - OPA 81. However,
approval of the revised Precinct Plan will necessitate updating Appendix I to
the Secondary Plan (OPA 21) to reflect the changes in the Warden West
Development Phasing Plan.
Revised Development Phasing Plan is being finalized
The Phasing Plan
contains projected development statistics for Markham Centre by District. In accordance
with the requirements of the Secondary Plan the landowners have submitted an
update to the Phasing Plan to incorporate the residential proposal and the
increases to the FSI. The District
Development Phasing Plan document is being finalized with the Transportation
Department. The refinements to the
Phasing Plan will be completed to the satisfaction of the Commissioner of
Development Services. Staff will
continue to monitor development approvals in the area and will update Appendix
I to the Secondary Plan (OPA 21).
The proposed changes to the Precinct Plan will have a
positive impact on the employment targets in the Development Phasing Plan
The Stringbridge/Times development
proposal will provide additional employment and retail floor area. The
applicant has provided a revised Precinct Plan (Figure 4). Some of the key
elements of the revised Precinct Plan are:
Table 1 compares the
approved targets (revised in May 2002) to the revised targets, including the
newest targets proposed for the
Table 1 Warden West
District Targets |
||
|
Warden West District (as revised) |
Revised to include Liberty & Stringbridge |
Target Residential Units |
350 high density units |
2,188 high density units |
Target Population @ 2ppu |
700 persons |
4,376 persons |
Schools |
None |
None |
Target Retail |
1,500 m2 |
6,602 m2 |
Target Employment |
322,200 m2 |
394,250 m2
(2x FSI) to 422,550 m2
(2.5x FSI) |
The
approved Precinct Plan (Figure 4) was appropriate in 2000. However, the vision for Markham Centre has
advanced considerably since then and the need to support transit through
increased development densities along transit corridors has become more crucial
for the success of Markham Centre and the Highway 7 corridor. Consequently, integrating the proposed
residential use into the development and increasing the density potential for
the balance of the site, is considered beneficial. The increased density and mixed use on the
site would comply with the Markham Centre Secondary Plan (OPA 21), as amended
and the Region’s Centres and Corridors and public transit initiatives.
The Quick
Start transit program begins in the fall of 2005
The
site will be well served by the Quick Start transit program, which will begin
in the fall of 2005. There are transit
stops on the south side of Highway 7 and on the east side of
A Zoning By-law
amendment is required to implement the Precinct Plan
The
existing zoning includes a maximum FSI of 1.0, which is based on an earlier
commercial development concept. However,
approval of the Times Investments’ residential project will use most of the
entire allowable density. If the maximum
FSI remains at 1.0 the size of the buildings proposed along the Highway 7
frontage would be reduced. The proposed
amendments to the zoning By-law include:
·
Increasing the
maximum permitted FSI from 1.0 to 2.0, as of right;
·
Incorporating
permissions to increase the FSI from 2.0 to 2.5, subject to the removal of a
Holding provision. The conditions for
removal of the Holding provision would include submission of a Traffic and
Transportation study to the satisfaction of the Commissioner of Development
Services;
·
Adjusting the
minimum building height provisions;
·
Adjusting the
required locations of the “main walls” facing Highway 7 and facing the
intersection of Highway 7 and
·
Adjustments to
the minimum required width of landscaping areas; and
·
Modifications to
the parking standards.
Servicing allocation
Final
approval of the residential portion of the proposal (Times) is contingent on
allocation of servicing capacity. Allocation
also needs to be confirmed through the Markham Centre Developer’s Group. The proposed Holding provision in the zoning
By-law will contain, amongst other conditions, a requirement that servicing
allocation has been granted prior to the Hold being removed.
Studies will be required
The
applicant has been advised that supporting studies are required for this
proposal in accordance with the provisions of the Secondary Plan (OPA 21). Staff will identify the studies required
through the circulation of each site plan application to Town departments and
external agencies. The owner will be
required to submit studies to the satisfaction of the Town prior to completion
of any recommendation report on the individual site plan applications and the
removal of the Holding provisions from the zoning By-law.
These
studies may include: traffic/transportation, noise, servicing, tree assessment,
and shadow studies in accordance with the requirements of the Secondary Plan (OPA
21). The applicants will also have to
demonstrate how the Markham Centre Guiding Principles and Performance Measures
and other green infrastructure initiatives have been incorporated into their
plans.
The
Town is in receipt of an overall Traffic study for the Stringbridge/Times
proposal. The traffic study is generally
acceptable and staff are continuing to work with the
owner to refine some of the details in the report before it is approved.
Need for public roads and signalization
at Circa Boulevard
Town
staff have concluded that the Highway 7 and Circa
Boulevard intersection, opposite the west entrance to the site, should be
signalized. Staff will work with the
owner and York Region staff to implement the
installation of these traffic lights, which will help facilitate staff’s desire
to achieve a public road connection between Highway 7 and
Unfortunately
the two existing buildings on the site preclude a direct connection between
Highway 7 and
Developer’ Group Agreement
The owners will be required to enter into a
Developer’s Group Agreement, in accordance with the requirements of OPA 21
prior to final approval of developments, and prior to servicing allocation.
The revised Precinct Plan and Times Site Plan
were presented by the applicants to the Markham Centre Advisory Committee in December
2004 for discussion and review as part of the Markham Centre application review
process. The Advisory Committee assigned
a Silver rating to the Precinct Plan for Built Form, Transportation, and Green
Infrastructure and commented that the Open Spaces required further
refinement. Staff will work to enhance
the Open Space areas, particularly along the sidewalks by the road and through
parking areas as the individual site plan applications are submitted.
FINANCIAL
CONSIDERATIONS:
The Town is currently undertaking a financial
study to examine potential financial implementation tools for Markham Centre. A
variety of strategies are being reviewed including designating Markham Centre
as a community improvement district, and requesting Provincial authorization
for Tax Increment Financing. The applicant will be required, as a condition of
final approval, to support these initiatives, or others, to assist in advancing
the infrastructure requirements for Markham Centre and achieving a superior
level of built form, urban design and public spaces for Markham Centre.
ENVIRONMENTAL
CONSIDERATIONS:
The individual site plan applicants must
demonstrate how they have incorporated the Performance Measures into their
plans and have used green initiatives in development of their proposal.
ACCESSIBILITY CONSIDERATIONS:
Any applicable accessibility issues will be examined in the course
of the review and reported upon in the recommendation reports for the
individual site plan applications as they are submitted to the Town for review
and approval.
ENGAGE 21ST CONSIDERATIONS:
The
proposal aligns with the following key Town of
BUSINESS
UNITS CONSULTED AND AFFECTED:
The applications have been circulated to internal departments and
external agencies for comments condition and requirements will be incorporated
into the final report.
|
|
|
Valerie
Shuttleworth, M.C.I.P., R.P.P. Director
of Planning and Urban |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner
of Development Services |
DOCUMENT: Q:\Development\Planning\APPL\ZONING\04 024490
Stringbridge\Stringbridge recomendation report (draft 5).doc
ATTACHMENTS:
Figure 1 – Location
Map
Figure 2 – Area
Context and Zoning
Figure 3 – Aerial
Photo
Figure 4 –
Proposed Precinct Plan
Appendix ‘A’ – Draft Zoning By-law
OWNER: Stringbridge Investments Limited
Attention:
Brian Seath
APPLICANTS: Life Construction Inc.
Hashem
Ghadaki
330 Highway 7
Attention: Hashem Ghadaki
AGENTS: Macaulay Shiomi Howson Ltd.
Attention:
Elizabeth Howson
KLM Planning Partners (for Hashem
Ghadaki)
Attention:
FIGURE 1 - LOCATION MAP: