SUBJECT: Tenstone Development Inc. (Circa @ Town Centre)
North
side of Highway 7, between
Application for site plan approval for a 16 storey apartment building, being Phase 2 of Tridel’s Circa @ Town Centre development
File No. SC 02 110607
PREPARED BY: Scott Heaslip, Senior Project Coordinator
Central District Team, extension 3140
RECOMMENDATION:
That the report dated June 20, 2006, entitled “Tenstone Development Inc. (Circa @ Town Centre) – North side of Highway 7, between Town Centre Boulevard and Rodick Road – Application for site plan approval for a 16 storey apartment building, being Phase 2 of Tridel’s Circa @ Town Centre development,” be received;
And that the application be endorsed, in principle, subject to the conditions attached as Appendix “A” and provided that:
And that 391 units of servicing allocation be granted by Council to Tenstone Development Inc. (Circa @ Town Centre), subject to the conditions outlined above;
And that
site plan approval be delegated to the Director of Planning and Urban Design or
her designate, to be issued once the conditions outlined above have been
satisfied. Site Plan approval is issued
only when the Director has signed the site plan;
And that Council authorize the enactment of a by-law to remove the Hold (H) provisions on the subject lands once the conditions outlined above have been satisfied and a site plan agreement has been executed;
And that the Owner participate in the enhanced hoarding program for Markham Centre, and that the Mayor and Clerk be authorized to execute a hording agreement in a form satisfactory to the Town Solicitor and the Commissioner of Development Services, with Tenstone Development Inc.;
And that this endorsement shall
lapse and site plan approval will not be issued, after a period of three years
commencing
EXECUTIVE SUMMARY:
Tridel’s Circa @ Town Centre development
occupies the lands generally bounded by Highway 7 to the south,
The overall plan for the Circa @ Town Centre development (see figure 4),
comprises:
condominium townhouse
units.
west of and physically linked to the Phase 1
building.
On July 8, 2003 Council endorsed the overall plan
for the Circa @ Town Centre development and granted site plan approval for
Phase 1, utilizing the servicing allocation assigned to the project by Council
in November, 2002. The Owner subsequently entered into a master
site plan and development agreement with the Town, securing the applicant’s obligations for the
delivery of key elements of public infrastructure required to support the overall
development as well as the conditions of site plan approval for Phase 1. Phase 1 has been substantially completed and is
partially occupied.
The applicant is requesting site plan approval for Phase 2, which
comprises a 16 storey, 391 unit condominium apartment building west of the
recently constructed Phase 1 building.
The proposed site plan is consistent with the master site plan endorsed
by Council and attached to the master site plan agreement for the property. The building elevations are consistent with the
Phase 1 building and are acceptable.
Staff recommend that Committee endorse the application and delegate site plan approval to the Director of Planning and Design, to be issued once the conditions outlined in the recommendation have been satisfied.
The zoning of the Phase 2 lands is subject to a holding provision. Staff will bring a by-law to Council to
remove the hold once the recommended conditions have been satisfied.
FINANCIAL CONSIDERATIONS:
Not applicable.
The purpose of this report is to recommend that Committee endorse an application for site plan approval for a 16 storey, 391 unit apartment building, being Phase 2 of Tridel’s Circa @ Town Centre development on the north side of Highway 7, west of Town Centre Boulevard, and delegate site plan approval to the Director of Planning and Urban Design.
Area Context and property
The overall property has an area of 7.47 ha.
(18.5 acres) and comprises the block bounded by Highway 7 to the south, Town
Centre Boulevard to the east, Cox Boulevard to the north and the Hydro One
corridor lands and Rodick Road to the west. (See Figures 1, 2 and 3) The Phase 2 lands are located immediately
west of the Phase 1 apartment building and have an area of 0.62 ha (1.5
acres).
Overall Development
The overall plan for the Circa @ Town Centre development (see figure 4),
comprises:
Phase 1:
·
A 16 storey, 390
unit condominium apartment building at the northwest corner of Highway 7 and
Town Centre Boulevard.
·
155
condominium townhouse units along the south side of
·
A new
north/south public road (Circa Boulevard), approximately mid block, connecting
Highway 7 to
·
A park
block, which will link a future neighbourhood park within the Phase 2, 3 and 4 lands
to
Phase 2:
·
A 16 storey, 391
unit condominium apartment building immediately west of and physically linked
to the Phase 1 building.
·
A portion of the
neighbourhood park.
Phase 3:
·
A senior’s
apartment (approximately 150 units) or an office building, located at the
north-east corner of Highway 7 and Circa Boulevard.
·
A portion of the
neighbourhood park
Phase 4:
·
Two office
buildings on the north side of Highway 7, west of Circa Boulevard.
·
The final
portion of the neighbourhood park.
The overall park area to be conveyed to the Town will be approximately
1.09 hectares (2.7 acres). Subsurface rights will be conveyed back to the
applicant under portions of the park blocks for a below grade parking facility.
Proposed Phase 2 Development
The Phase 2 development (Figures
5-13) comprises:
The following chart provides the statistical information on the
building components of Phase 2.
Phase 2 Statistics – Circa @ Town Centre |
|
Building Type |
highrise apartment building |
Building Height |
up to 16 storeys |
Number of Units |
391 |
Gross Floor area |
39,889 square metres (429,376 square feet) |
Max. Parking Permitted |
@1.3sp./unit and .2sp./unit for visitors - 791
parking spaces |
Minimum. parking required |
n/a |
Parking Provided |
442 parking spaces |
Landscaping |
6,944 square metres (70% of site) |
DISCUSSION:
Proposed development is consistent with Precinct Plan
The Markham Centre Secondary Plan (OPA #21) requires a Precinct Plan to
be prepared by the landowners on a sub-district basis to establish guidelines
for detailed land use, built form, pedestrian and vehicular access and
landscaping which meet the intent of the Secondary Plan. A Precinct Plan for
the Circa @ Town Centre development was approved by Council in November 2002. The proposed Phase 2 plan is consistent with the
precinct plan.
The applicant presented the Phase 2 plans to the Markham Centre
Advisory on
The Markham Centre Performance Measures, which form an Appendix to the Secondary
Plan, are applied to the review of development proposals to ensure successful
implementation of the policies of the Secondary Plan. The 5 key themes for the performance
measures are greenlands, built form, green infrastructure, open space and
transportation. The applicant’s
commitment to implement the applicable performance measures (comprehensive
Green Infrastructure program, including connection to the District Energy
network, program for parkland
dedication and development, travel demand management measures, provision of a heritage
remembrance feature, and a public art program) are secured in the master site
plan agreement and will be incorporated into the final plans for Phase 2, as
required.
Site plan and building
elevations are acceptable
The Phase 2 site plan is consistent with the master site plan approved
by Council in 2002, and is acceptable.
The architecture and exterior building materials for the Phase 2 building
are consistent with the Phase 1 building and comprise a mix of precast, glass,
brick, and curtain wall panels. The
building elevations are attached to this report as Figures 6-13.
The applicant recently submitted updated site plans showing two
stairwells and two exhaust/vest shafts serving the underground parking garage
within the neighbourhood park area.
Staff are concerned with the potential impact of these items on the
park, and will be requiring the applicant to relocate or otherwise address their
impact to the satisfaction of staff, prior to the approval of final plans.
Developers Group Agreement
being finalized
The
major developers in Markham Centre are currently finalizing a developers group
agreement. Execution of this agreement is
a condition of final approval of the subject site plan application.
Servicing allocation required
A staff report recommending the distribution
of the latest servicing capacity assigned to the Town of Markham by the Region
of York is also on the agenda of the June 20, 2006 Development Services
Committee meeting. This report
recommends that an additional 500 apartment units be assigned to Markham Centre,
in addition to the 1189 units previously assigned to Markham Centre and not yet
allocated to individual projects, A condition of approval of the subject
application will be that Council has approved the allocation of 500 units to
Markham Centre, that the Developers Group Agreement is executed, and that the
Trustee for the developers group supports the assignment of servicing
allocation to this project.
It should
be noted that the site plan agreement for Phase 1 includes
a commitment by the Owner not to pre-sell any units within Phases 1, 1A and 1B
until water allocation has been received from the Town. This agreement is registered
on title.
Key infrastructure obligations have
been secured in a development agreement
In November 2002, Council approved amendments to the Official Plan and
Zoning By-law as well as a Precinct Plan for the subject property. Council directed
that the Owner enter into a development agreement with the Town to secure the applicant’s
obligations for the delivery of key elements of public infrastructure required to
support the development. On
·
Town and
developer responsibilities;
Council directed that the provisions of the development
agreement be incorporated into the future site plan and condominium agreements
for each phase of the project, as applicable.
Proposed development complies with the zoning by-law
The Phase 2 lands are zoned Residential Four by
By-law 177-96, as amended by By-law 2002-251.
The proposed development complies with the zoning by-law.
The Phase 2, 3 and 4 lands are currently
subject to a hold provision. The
conditions for removal of the hold are:
·
a development agreement for the
entire development has been executed
· servicing
allocation for each applicable phase of
the development has been granted; and
·
a site
plan agreement for each applicable phase of development has been executed.
Staff will bring a by-law forward to Council to remove the hold from the Phase 2 lands once the following conditions have been satisfied:
Applicant to participate in the
The applicant has expressed interest in participating
in the Markham Centre Enhanced Hoarding Program. The purpose of the enhanced hoarding
program is to help define the Markham Centre area, identify developments as
Markham Centre projects, and to co-ordinate the look and visual impact of
hoarding programmes in the area. In order to participate in this program, the
applicant will be required to enter into a hoarding agreement with the Town.
Existing hydro line to be
relocated
The existing overhead hydro line within the north boulevard
of Highway 7 needs to be relocated further south to ensure an adequate
separation from the proposed building.
The applicant is making arrangements with the Region and PowerStream to
have the line relocated further into the right-of-way of Highway 7 to provide
the required separation.
FINANCIAL TEMPLATE (Separate Attachment):
Not applicable.
The proposed development will be served by Markham District Energy system.
There are no accessibility
implications for the Town in this report.
ENGAGE 21ST CONSIDERATIONS:
The proposal aligns with the
following key Town of
BUSINESS UNITS CONSULTED AND AFFECTED:
This
application was circulated to internal departments and external agencies. All
comments/requirements of these departments and agencies are either reflected in
the site plan, landscape plans and elevations attached to this report, or will
be reflected in the final plans and site plan agreement.
RECOMMENDED BY:
___________________________________ ________________________
Valerie Shuttleworth, M.C.I.P, R.P.P
Jim Baird, M.C.I.P, R.P.P
Director, Planning & Urban Design Commissioner, Development Services
ATTACHMENTS:
Figure 1: Site Location
Figure 2: Area Context
Figure 3: Aerial Photo
Figure 4: Overall Site Plan of Circa @ Town
Centre
Figure 5: Site Plan – Phase 2
Figure 6: Key Plan – Building Elevations – Phase
2
Figure 7: Building Elevations – Phase 2
Figure 8: Building Elevations – Phase 2
Figure 9: Building Elevations – Phase 2
Figure 10: Building Elevations – Phase 2
Figure 11: Building Elevations – Phase 2
Figure 12: Building Elevations – Phase 2
Figure 13: Building Elevations – Phase 2
Appendix A: Conditions of Site Plan Approval
Applicant: Mr.
M3H 5S9
Telephone: 416-736-2541
Fax: 416-661-0978
APPENDIX ‘A’
General
and Specific Provisions to be Included in the Site Plan Agreement
1. The Owner shall enter into a Site Plan Agreement with the Town, containing all standard and special provisions and requirements of the Town and other public agencies, including the specific requirements identified in this report, prior to site plan approval.
2. Payment by the Owner of all applicable fees, recoveries and development charges.
3. The Owner shall satisfy all requirements and obtain necessary approval from Town Departments and authorized public agencies, including PowerStream, and the Regional Municipality of York.
4. The Owner shall make arrangements with the Region of York, Transportation and Works Department and PowerStream to have the existing overhead hydro line in the north boulevard of Highway 7 relocated further into the boulevard to provide the required separation from the proposed building.
5. The Owner shall submit final drawings including, but not limited to site plans and elevation drawings, parking layout plan, grading, servicing and engineering drawings that comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Commissioner of Development Services.
6. Final site plan to be revised to the satisfaction of the Director of Planning and Urban Design to relocate or otherwise address the impact of the stairwells and exhaust/vent shafts serving the underground parking garage which are proposed to be located within the neighbourhood park area.
7. The Owner shall submit a Landscape Plan, including a detailed lighting submission, prepared by a Landscape Architect, having O.A.L.A. membership for approval by the Commissioner of Development Services, prior to execution of the site plan agreement.
8. The Owner shall provide
confirmation that the height of the building meets the requirements of
Transport
9. The Owner shall participate in the enhanced hoarding programme for Markham Centre and enter into a Hoarding Agreement with the Town.
10. The Owner shall provide and implement a comprehensive Green Infrastructure plan which provides for connection to the District Energy network to the satisfaction of the Commissioner of Development Services.