Report to: Development
Services Committee Date
of Meeting:
SUBJECT: Times Investments Limited. (formerly
Stringbridge Investments Limited)
Application for Site Plan Approval for a 10
and 12 storey, 400 unit apartment building
Northwest corner of
File No. SC 04 011279
PREPARED BY: Scott Heaslip, Senior Project Coordinator
Central District Team, extension 3140
RECOMMENDATION:
That the report dated
That the application for site plan approval be endorsed, in principle, subject to the conditions attached as Appendix “A” and the following:
And that 400 units of servicing allocation to Times Investments Limited be confirmed by Council, subject to the conditions outlined above;
And that
site plan approval be delegated to the Director of Planning and Urban Design or
her designate, to be issued once the conditions outlined above have been
satisfied. Site Plan approval is issued
only when the Director has signed the site plan;
And that Council authorize the enactment of a by-law to remove the Hold (H) provisions on the subject lands, upon application by the Owner, once the conditions outlined above have been satisfied;
And that the Owner participate in the enhanced hoarding program for Markham Centre, and that the Mayor and Clerk be authorized to execute a hoarding agreement in a form satisfactory to the Town Solicitor and the Commissioner of Development Services, with Times Investments Limited;
That the Mayor and Clerk be authorized to execute an agreement with the Times Investments Limited committing not to pre-sell any units beyond 400 until servicing allocation is received from the Town and the Markham Centre Landowners Cost Sharing Group;
And that this endorsement shall
lapse and site plan approval will not be issued, after a period of three years
commencing
EXECUTIVE SUMMARY:
The subject 1.46 hectare (3.6 acre) property is located at the
north-west corner of
In June 2005, Council approved a Precinct Plan and zoning
amendments to permit the development of the subject property with a 10 and 12-storey apartment building with street
related ground floor commercial uses.
The applicant
is now requesting site plan approval for the proposed development.
The
development conforms with the Precinct Plan and complies with the Town’s zoning
by-laws.
Staff recommend that Committee
endorse the application and delegate site plan approval to the Director of
Planning and Design, to be issued once the conditions outlined in the
recommendation have been satisfied.
The zoning of the property is subject to a holding provision. Staff will bring a by-law to Council to remove
the hold once the recommended conditions have been satisfied.
FINANCIAL CONSIDERATIONS:
Not applicable.
1.
Purpose 2. Background 3. Discussion 4.
Financial 5.
Environmental
6. Accessibility 7. Engage
21st 8. Affected Units 9. Attachment(s)
The purpose of this
report is to recommend that Committee endorse the application for site plan
approval for a proposed 10 and 12 storey, 400 unit residential apartment
building at the north-west corner of South Town Centre Boulevard and to delegate
site plan approval to the Director of Planning and Urban Design.
Property
and Area Context
The subject property has an area of 1.46 hectares (3.6 acres),
and is located at the north-west corner
of
Proposed development
The proposed building (Figures 5-8) includes a 12-storey component
facing South Town Centre Boulevard and a 10-storey component facing Clegg Road,
connected by a 6 storey link with 3-storey round shaped feature (containing an
indoor swimming pool) focused on the intersection. The South Town Centre wing contains grade
related retail uses facing onto the street.
The
The main body of the building
consists of exterior building materials which include a mix of brick, light and
dark E.I.F.S. (Exterior Insulation and Finish System) panels and metal
panels. The top tier of the building
consists of both smooth and rough finish artificial stone, and pre-cast coping. There will be a double-glazed aluminum window
system and a double glazed curtain wall system, with back painted spandrel
glass. The balconies consist of glass
with metal slab covers and railings, and pre-finished metal canopy dividers.
The building component facing the
corner of
The submitted
site plan (Figure 4) identifies a possible future apartment building on a 1
acre portion on the north-west corner of the lands. The applicant is exploring
intensifying
the use of this parcel, which would require relief from the zoning by-law and
revisions to the precinct plan. This
would require Council approval. The
ultimate use of these lands will be subject to a future staff report.
The subject lands are designated “Commercia1” in the Official Plan and “Community Amenity –
The subject
lands are zoned “Markham Centre Downtown Two” (MC-D2) by the Markham Centre
Zoning By-law No. 2004-196. The by-law includes site performance standards relating
to setback and building height permissions, along with floor area and
dwelling unit limitations, which
implement Council’s approval of the Precinct Plan. The use permissions in the Markham Centre
Zoning By-law permit the proposed residential and ground floor commercial uses.
On
Proposed
development is consistent with Precinct Plan
The Markham Centre
Secondary Plan (OPA 21) requires a Precinct Plan to be prepared by the
landowners on a sub-district basis to establish guidelines for detailed land
use, built form, pedestrian and vehicular access and landscaping which meet the
intent of the Secondary Plan. A Precinct Plan for the Times site and the
adjacent Stringbridge lands was approved by Council in June, 2005. The proposed development is consistent with the
approved Precinct Plan.
The Markham Centre Advisory
reviewed the proposed development in December, 2004. The plans were
subsequently refined to address the comments of the Advisory Group.
Overall, in
reviewing the Phase 1 plan, the Advisory Group felt that Times was on-target
relative to the Performance Measures document, subject to the implementation of
the Green Infrastructure and energy initiatives, including the introduction of
green roof on the lower components of the building, and fulfilling their
commitment to connect to District Energy.
Green
infrastructure elements proposed by Times for inclusion in the project include:
The
applicant’s commitment to provide these green infrastructure elements will be
secured through the site plan agreement.
Site plan and elevations are acceptable subject to clarification of
certain details
The site plan and building
elevations have been reviewed, and are generally acceptable. However, there are a few matters which
require further review and resolution:
These items will be addressed in the
final building elevation drawings to be approved by the Director of Planning
and Urban Design.
Landscape Plans
Updated
landscape plans which reflect the most recent site plan proposal will need to
be submitted for review and approval. Any
landscape plans will be required to include streetscaping details, including
tree planting. An interim landscape plan
will be required for any portion of the site identified for future development.
Applicant to enter into Cost Sharing Agreement
The applicant has indicated that he will be entering into the Markham Centre Landowners Cost Sharing Agreement. Written confirmation from the Trustee for the Landowners Group that the applicant is in good standing with the Landowners Group and that the Group supports the assignment of 400 units of servicing allocation to this project will be a condition of endorsement of this site plan application.
Pre-sale agreement
required
Other developers in Markham Centre, including Remington,
Hold provisions apply
The zoning of the subject property is currently subject to a Hold (H) provision. Staff will bring a by-law forward to Council to remove the Hold once all of the conditions outlined in the recommendation of this report have been satisfied.
Applicant to participate in the
Markham Centre Enhanced Hoarding Program
The applicant has expressed interest in participating
in the Markham Centre Enhanced Hoarding Program. The purpose of the enhanced hoarding
program is to help define the Markham Centre area, identify developments as
Markham Centre projects, and to co-ordinate the look and visual impact of
hoarding programs in the area. In order to participate in this programme, the
applicant will be required to enter into a hoarding agreement with the Town.
FINANCIAL TEMPLATE (Separate Attachment):
Not applicable
This
proposal has been evaluated against the Markham Centre Performance Measures and
issues of green infrastructure have been addressed in this report.
There are no accessibility implications for the Town in this report. Accessibility issues related to the building
will be addressed through the provision of handicapped parking spaces, site
plan, and Building Code review processes.
ENGAGE 21ST CONSIDERATIONS:
The proposal aligns with the following key Town
of
BUSINESS UNITS CONSULTED AND AFFECTED:
This
application was circulated to internal departments (Fire, Building,
Engineering, Design, Legal and Waste Management) and external agencies. All
comments/requirements of these departments and agencies are either reflected in
the site plan, landscape plans and elevations attached to this report, or will
be reflected in the final plans and site plan agreement.
RECOMMENDED BY:
|
|
|
Valerie Shuttleworth, M.C.I.P., R.P.P. Director of |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner of Development Services |
ATTACHMENTS:
Figure 1: Site Location
Figure 2: Area Context and Zoning
Figure 3: Aerial Photo
Figure 4: Site Plan
Figure 5: Building Elevations
Figure 6: Building Elevations
Figure 7: Building Elevations
Figure 8: Coloured Rendering
Applicant: Hashem Ghadaki
Life Construction Inc.
330 Highway 7
L4B 3P8
Telephone: (905) 882-2552, ext. 250
Fax: (905) 882-2553
Email: hashem@timesgroupcorp.com
File:
Q:\development\planning\appl\siteplan\SC 04 011279\final recommendation report
APPENDIX ‘A’
Conditions of site plan approval
2. That the site plan agreement include provisions for payment by the Owner of all applicable fees, recoveries and development charges, and cash-in-lieu of parkland dedication.
3. The cash-in-lieu of parkland obligations shall be in accordance with the applicable Parkland Principles for Markham Centre and pursuant to the Markham Centre Secondary Plan and the Markham Centre Landowners Cost Sharing Group Agreement, to the satisfaction of the Commissioner of Development Services.
4. That the Owner satisfy all financial obligations of the Markham Centre Landowners Cost Sharing Agreement.
5. That prior to submission of the final site plan and elevation drawings, the Owner shall provide a legal survey to the Town confirming the alignment of the proposed driveway onto South Town Centre Boulevard with the approved location of the driveway on the opposite side of the road.
7. That
prior to the execution of the site plan agreement, Landscape Plans, including
streetscape details, prepared by a Landscape Architect having membership with
the Ontario Association of Landscape Architects shall be submitted to the
Commissioner of Development Services for approval and inclusion in the Site
Plan Agreement. The landscaping shall be
installed properly, cared for and maintained to the satisfaction of the Town.
8. That prior to the execution of the site
plan agreement, the Owner shall submit a storm water management report and a
functional servicing report for approval by the Town, and to implement the
recommendations of the approved reports;
9. That the Owner obtain
all necessary approvals from the Regional Municipality of York Transportation
and Works Department, and further that the Owner provide confirmation the height of the buildings meets
the requirements of Transport
10. That the location, size and construction of all refuse storage areas and recycling facilities, and arrangements for waste collection be to the satisfaction of the Town of Markham Waste Management Department.
11. That the Owner design the site to
ensure that there is no permanent underground encroachment into any municipal
road right-of-way.
12. That the Owner provide and implement a comprehensive Green Infrastructure plan to the satisfaction of the Commissioner of Development Services. The plan shall include the following minimum elements - LEED certification, green roof technology on the lower building elements, connection to the District Energy network, and the provision of bicycle storage facilities.
13. That provisions for Fire Routes, yard hydrants, Siamese connections and other emergency access requirements be to the satisfaction of the Fire Department.
14. That provision for snow storage, sidewalk alignment and maintenance be
to the satisfaction of the General Manager of Operations and Director of
15. That the Owner pay for all costs associated with the relocation of utilities within the right-of-way, as may be required.
16. That the Owner submit for approval by the Town and implement the recommendations of an Environmental Noise and Vibration Feasibility Study.
17. That the Owner provide and implement a detailed stormwater management
plan, including quality control measures/devices to the satisfaction of the
Director of
18. That the Owner provide and implement erosion control measures during
construction and obtain a Topsoil Removal Permit to the satisfaction of the
Director of
19. That the Owner comply with all requirements of the Town and authorized public agencies, including Power Stream to the satisfaction of the Commissioner of Development Services.
20. That the Owner participate in the enhanced hoarding program, and that staff be authorized to enter into a Hoarding Agreement with the Owner.
21. That the site plan agreement provide for the installation of odour
control units within any restaurants.