REPORT TO Transportation Committee |
|
|
|
|
TO: |
Mayor and
Members of Council |
|
|
FROM: |
Alan Brown, Director of |
|
|
PREPARED BY: |
David Porretta, |
|
|
DATE OF MEETING: |
2004-01-26 |
|
|
SUBJECT: |
Proposed Sidewalk on |
|
|
RECOMMENDATION:
THAT
School Crossing Guard service be established at the intersection of
AND THAT signage within the designated School Zone be changed to properly reflect existing School Zone design standards.
AND THAT staff review the feasibility of a sidewalk on the east side of Wootten Way, between the north and south legs of Senator Reesor’s Drive and report back to Committee with recommendations on the sidewalk and overall school Crossing Guard service in the area before June 2004.
PURPOSE:
The purpose of
this report is to recommend to Council that a crossing guard be assigned to the
intersection of
BACKGROUND:
The Town received a separate petition from residents
requesting school crossing guard service at
OPTIONS/DISCUSSION:
In response to the petition, the following studies were conducted:
· Gap Time Studies
Ø
Ø
·
Effectiveness of the School Zone on
·
Assessment of sidewalk requirement on the east
side of
Gap Time Studies
To determine the need for School Crossing Guard service
at a given location, the
An assessment of the School Zone
adjacent to
Upon approval of crossing guard service at
FINANCIAL CONSIDERATIONS:
The cost of a Crossing Guard at Wootten Way and Major Buttons
Drive is $6,100 per annum (calculated at $15.56, inclusive of the 3% GST, X 2
shifts X 196 days). This cost can be
absorbed within the proposed 2004 budget for school crossing guards.
The cost of installing
the proposed sidewalk, including utility relocations would be approximately
$32,500. The cost can be absorbed within
the 2004 capital budget. The sidewalk could
eliminate the need for one or two crossing guards. Therefore, the payback period for the
sidewalk would be between 3 to 5 years.
Staff will review with abutting residents and report back to Committee
with detailed costs and public response.
ATTACHMENTS:
Attachment 1 – William Armstrong P.S. Crossing Guard and Proposed Sidewalk Locations
Attachment 2 – Council Excerpt
from Development Services Committee meeting of
Attachment 3 – Parent Council
Meeting Memo;
Alan
Brown, C.E.T. Director
of |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner
of Development Services |